Construction Delay Analysis under Multiple Baseline Updates

iii Acknowledgements iv Dedication v Table of

[1]  David Arditi,et al.  Selecting a delay analysis method in resolving construction claims , 2006 .

[2]  Jon M. Wickwire,et al.  Construction Scheduling: Preparation, Liability, and Claims , 1991 .

[3]  John R. Baldwin,et al.  Causes of Delay in the Construction Industry , 1971 .

[4]  Michael R. Finke WINDOW ANALYSES OF COMPENSABLE DELAYS , 1999 .

[5]  Paul Levin Construction Contract Claims, Changes & Dispute Resolution , 1998 .

[6]  Ming Lu,et al.  RESOURCE-ACTIVITY CRITICAL-PATH METHOD FOR CONSTRUCTION PLANNING , 2003 .

[7]  F. Brian Talbot Optimal methods for scheduling projects under resource constraints , 1979 .

[8]  David Arditi,et al.  Construction Delay Computation Method , 2001 .

[9]  Kumar Neeraj Jha,et al.  Critical Factors Affecting Schedule Performance: Evidence from Indian Construction Projects , 2006 .

[10]  Mohammed Al-Khalil,et al.  Important causes of delay in public utility projects in Saudi Arabia , 1999 .

[11]  David K. H. Chua,et al.  Key Constraints Analysis with Integrated Production Scheduler , 2005 .

[12]  Andrew Baldwin,et al.  A methodology for assessing construction project delays , 1998 .

[13]  Francis T. Hartman,et al.  Construction Claims and Disputes: Causes and Cost/Time Overruns , 1994 .

[14]  Robert J Willis Critical path analysis and resource constrained project scheduling -- Theory and practice , 1985 .

[15]  Kirk D. Gothand Schedule delay analysis: Modified windows approach , 2003 .

[16]  Jesus M. de la Garza,et al.  Evaluation of the Resource-Constrained Critical Path Method Algorithms , 2005 .

[17]  L. S. Sandlin,et al.  Phased Root Cause Analysis: A distinctive view on construction claims , 2004 .

[18]  Sameh M. El-Sayegh,et al.  Significant factors causing delay in the UAE construction industry , 2006 .

[19]  Sadi Assaf,et al.  Causes of delay in large construction projects , 2006 .

[20]  Edward W. Davis,et al.  A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling , 1975 .

[21]  Jerome D. Wiest Some Properties of Schedules for Large Projects with Limited Resources , 1964 .

[22]  Abdulaziz A. Bubshait,et al.  Comparison of delay analysis methodologies , 1998 .

[23]  N. Mansfield,et al.  Causes of delay and cost overruns in Nigerian construction projects , 1994 .

[24]  Emad Elbeltagi,et al.  Keeping Better Site Records Using Intelligent Bar Charts , 2005 .

[25]  R. A. Harris,et al.  UK practice in dealing with claims for delay , 2001 .

[26]  Vera A. Lovejoy Claims schedule development and analysis: Collapsed as-built scheduling for beginners , 2004 .

[27]  Stephen Scott Keeping better site records , 1990 .

[28]  Sabah Alkass,et al.  Computer aided construction delay analysis and claims preparation , 1995 .

[29]  D. Arditi,et al.  Reasons for delays in public projects in Turkey , 1985 .

[30]  Youngjae Kim,et al.  Delay Analysis Method using Delay Section , 2005 .

[31]  Samir I. G. Allam,et al.  Multi-project scheduling: a new categorization for heuristic scheduling rules in construction scheduling problems , 1988 .

[32]  Jae-Jun Kim,et al.  Method for Calculating Schedule Delay Considering Lost Productivity , 2005 .

[33]  Tommy Y. Lo,et al.  Construction Delays in Hong Kong Civil Engineering Projects , 2006 .

[34]  S. Ogunlana,et al.  Construction delays in a fast-growing economy: Comparing Thailand with other economies , 1996 .

[35]  M. M. Dlakwa,et al.  Reasons for overrun in public sector construction projects in Nigeria , 1990 .

[36]  Sabah Alkass,et al.  Construction delay analysis techniques , 1996 .

[37]  Keith W. Hipel,et al.  Conflict resolution in construction disputes using the graph model , 2006 .

[38]  Victor M. Ostrowski,et al.  Concurrent delay analysis in litigation , 2006 .

[39]  Frank F Saccomanno,et al.  Modified but-for method for delay analysis , 2005 .

[40]  Tarek Hegazy,et al.  Daily Windows Delay Analysis , 2005 .

[41]  J. D. Wiest,et al.  A Heuristic Model for Scheduling Large Projects with Limited Resources , 1967 .

[42]  Sadi Assaf,et al.  Causes of Delay in Large Building Construction Projects , 1995 .

[43]  Osama Moselhi,et al.  Least impact algorithm for resource allocation , 1993 .

[44]  Tarek Hegazy,et al.  Optimization of Resource Allocation and Leveling Using Genetic Algorithms , 1999 .

[45]  Aminah Robinson Fayek,et al.  Fuzzy Logic Approach for Activity Delay Analysis and Schedule Updating , 2005 .

[46]  Mohan M. Kumaraswamy,et al.  Reasons for delay in civil engineering projects - the case of Hong Kong , 1995 .

[47]  Ayman H. Al-Momani,et al.  Construction delay: a quantitative analysis , 2000 .

[48]  William Ibbs,et al.  Schedule Analysis under the Effect of Resource Allocation , 2007 .

[49]  Daniel C. Okpala,et al.  Causes of High Costs of Construction in Nigeria , 1988 .

[50]  John W. Fondahl The Development of the Construction Engineer: Past Progress and Future Problems , 1991 .

[51]  Saied Kartam Generic Methodology for Analyzing Delay Claims , 1999 .

[52]  Hasan Pirkul,et al.  Algorithms for the multi-resource generalized assignment problem , 1991 .