Construction Delay Analysis under Multiple Baseline Updates
暂无分享,去创建一个
[1] David Arditi,et al. Selecting a delay analysis method in resolving construction claims , 2006 .
[2] Jon M. Wickwire,et al. Construction Scheduling: Preparation, Liability, and Claims , 1991 .
[3] John R. Baldwin,et al. Causes of Delay in the Construction Industry , 1971 .
[4] Michael R. Finke. WINDOW ANALYSES OF COMPENSABLE DELAYS , 1999 .
[5] Paul Levin. Construction Contract Claims, Changes & Dispute Resolution , 1998 .
[6] Ming Lu,et al. RESOURCE-ACTIVITY CRITICAL-PATH METHOD FOR CONSTRUCTION PLANNING , 2003 .
[7] F. Brian Talbot. Optimal methods for scheduling projects under resource constraints , 1979 .
[8] David Arditi,et al. Construction Delay Computation Method , 2001 .
[9] Kumar Neeraj Jha,et al. Critical Factors Affecting Schedule Performance: Evidence from Indian Construction Projects , 2006 .
[10] Mohammed Al-Khalil,et al. Important causes of delay in public utility projects in Saudi Arabia , 1999 .
[11] David K. H. Chua,et al. Key Constraints Analysis with Integrated Production Scheduler , 2005 .
[12] Andrew Baldwin,et al. A methodology for assessing construction project delays , 1998 .
[13] Francis T. Hartman,et al. Construction Claims and Disputes: Causes and Cost/Time Overruns , 1994 .
[14] Robert J Willis. Critical path analysis and resource constrained project scheduling -- Theory and practice , 1985 .
[15] Kirk D. Gothand. Schedule delay analysis: Modified windows approach , 2003 .
[16] Jesus M. de la Garza,et al. Evaluation of the Resource-Constrained Critical Path Method Algorithms , 2005 .
[17] L. S. Sandlin,et al. Phased Root Cause Analysis: A distinctive view on construction claims , 2004 .
[18] Sameh M. El-Sayegh,et al. Significant factors causing delay in the UAE construction industry , 2006 .
[19] Sadi Assaf,et al. Causes of delay in large construction projects , 2006 .
[20] Edward W. Davis,et al. A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling , 1975 .
[21] Jerome D. Wiest. Some Properties of Schedules for Large Projects with Limited Resources , 1964 .
[22] Abdulaziz A. Bubshait,et al. Comparison of delay analysis methodologies , 1998 .
[23] N. Mansfield,et al. Causes of delay and cost overruns in Nigerian construction projects , 1994 .
[24] Emad Elbeltagi,et al. Keeping Better Site Records Using Intelligent Bar Charts , 2005 .
[25] R. A. Harris,et al. UK practice in dealing with claims for delay , 2001 .
[26] Vera A. Lovejoy. Claims schedule development and analysis: Collapsed as-built scheduling for beginners , 2004 .
[27] Stephen Scott. Keeping better site records , 1990 .
[28] Sabah Alkass,et al. Computer aided construction delay analysis and claims preparation , 1995 .
[29] D. Arditi,et al. Reasons for delays in public projects in Turkey , 1985 .
[30] Youngjae Kim,et al. Delay Analysis Method using Delay Section , 2005 .
[31] Samir I. G. Allam,et al. Multi-project scheduling: a new categorization for heuristic scheduling rules in construction scheduling problems , 1988 .
[32] Jae-Jun Kim,et al. Method for Calculating Schedule Delay Considering Lost Productivity , 2005 .
[33] Tommy Y. Lo,et al. Construction Delays in Hong Kong Civil Engineering Projects , 2006 .
[34] S. Ogunlana,et al. Construction delays in a fast-growing economy: Comparing Thailand with other economies , 1996 .
[35] M. M. Dlakwa,et al. Reasons for overrun in public sector construction projects in Nigeria , 1990 .
[36] Sabah Alkass,et al. Construction delay analysis techniques , 1996 .
[37] Keith W. Hipel,et al. Conflict resolution in construction disputes using the graph model , 2006 .
[38] Victor M. Ostrowski,et al. Concurrent delay analysis in litigation , 2006 .
[39] Frank F Saccomanno,et al. Modified but-for method for delay analysis , 2005 .
[40] Tarek Hegazy,et al. Daily Windows Delay Analysis , 2005 .
[41] J. D. Wiest,et al. A Heuristic Model for Scheduling Large Projects with Limited Resources , 1967 .
[42] Sadi Assaf,et al. Causes of Delay in Large Building Construction Projects , 1995 .
[43] Osama Moselhi,et al. Least impact algorithm for resource allocation , 1993 .
[44] Tarek Hegazy,et al. Optimization of Resource Allocation and Leveling Using Genetic Algorithms , 1999 .
[45] Aminah Robinson Fayek,et al. Fuzzy Logic Approach for Activity Delay Analysis and Schedule Updating , 2005 .
[46] Mohan M. Kumaraswamy,et al. Reasons for delay in civil engineering projects - the case of Hong Kong , 1995 .
[47] Ayman H. Al-Momani,et al. Construction delay: a quantitative analysis , 2000 .
[48] William Ibbs,et al. Schedule Analysis under the Effect of Resource Allocation , 2007 .
[49] Daniel C. Okpala,et al. Causes of High Costs of Construction in Nigeria , 1988 .
[50] John W. Fondahl. The Development of the Construction Engineer: Past Progress and Future Problems , 1991 .
[51] Saied Kartam. Generic Methodology for Analyzing Delay Claims , 1999 .
[52] Hasan Pirkul,et al. Algorithms for the multi-resource generalized assignment problem , 1991 .