Concept for a Performance Measurement Method for the Organization of the IPS2 Delivery

While the IPS2-Execution System (IPS2-ES) supports the IPS2 provider during the IPS2 delivery, there is still no adequate tool to measure and evaluate the performance of the organization of the IPS2 delivery system. Especially the complexity of the automatic planning and control mechanisms of the IPS2-ES leads to the problem that the output of the system cannot be manually controlled. Hence, an automated method has to be designed to measure and rate the resulting IPS2 with a focus on IPS2 delivery planning and the IPS2 network. This paper presents a concept for an IPS2 performance measurement method for the organization of the IPS2 delivery. It considers resource planning, partner network and IT. Key figures have an important role for the performance concept and will be introduced in the concept. Additionally, a prototypical software implementation will be demonstrated.

[1]  Jan Marco Leimeister,et al.  Dienstleistungsengineering und -management , 2012 .

[2]  Friedrich Morlock,et al.  Architecture and Conceptual Design for IPS2-Execution Systems , 2013 .

[3]  Hau L. Lee,et al.  The bullwhip effect in supply chains , 2015, IEEE Engineering Management Review.

[4]  Peter Nyhuis,et al.  Changeable Manufacturing - Classification, Design and Operation , 2007 .

[5]  M. Rese,et al.  An Ontology of Business Models for Industrial Product-Service Systems , 2013 .

[6]  Anke Giese Differenziertes Performance Measurement in Supply Chains , 2012 .

[7]  Uday Kumar,et al.  Maintenance performance measurement (MPM): issues and challenges , 2006 .

[8]  Friedrich Morlock,et al.  Delivery management of industrial product-service systems – challenges for a performance measurement , 2013 .

[9]  Feng Jin,et al.  An Indicator Framework for Monitoring IPS² in the Use Phase , 2013 .

[10]  Michael Schenk,et al.  Wandlungsfähige und ressourceneffiziente Fabriken , 2012 .

[11]  Oliver Völker,et al.  Industrial Product-Service Systems (IPS2) , 2011 .

[12]  Dong-Hee Lee,et al.  Development of an Evaluation Scheme for Product-Service Systems , 2011 .

[13]  Oliver Völker,et al.  Aufbau- und Ablauforganisation zur Erbringung hybrider Leistungsbündel , 2012 .

[14]  Franz J. Brunner Japanische Erfolgskonzepte : KAIZEN, KVP, Lean Production Management, Total Productive Maintenance, Shopfloor Management, Toyota Production Management , 2008 .

[15]  Horst Meier,et al.  Agile Scheduling and Control for Industrial Product-service Systems , 2013 .

[16]  Friedrich Morlock,et al.  Key performance indicators for assessing the planning and delivery of industrial services , 2013 .

[17]  Jan C. Aurich,et al.  Produkt-Service Systeme , 2010 .