Mixed integer programming for scheduling surface mount technology lines
暂无分享,去创建一个
[1] Tadeusz Sawik,et al. Issues in loading and scheduling of SMT lines , 2000 .
[2] Chelliah Sriskandarajah,et al. A Survey of Machine Scheduling Problems with Blocking and No-Wait in Process , 1996, Oper. Res..
[3] S. Karabati,et al. Cyclic scheduling in flow lines : modeling observations, effective heuristics and a cycle time minimization procedure , 1996 .
[4] T. Sawik. Integer programming models for the design and balancing of flexible assembly systems , 1995 .
[5] Thomas M. Tirpak. Design-to-Manufacturing Information Management for Electronics Assembly , 2001 .
[6] Tadeusz Sawik. Simultaneous versus sequential loading and scheduling of flexible assembly systems , 2000 .
[7] Chelliah Sriskandarajah,et al. Minimizing Cycle Time in a Blocking Flowshop , 2000, Oper. Res..
[8] Ram Rachamadugu,et al. Classification and review of FMS scheduling procedures , 1994 .
[9] M. Solomon,et al. Scheduling hybrid flowshops to minimize maximum tardiness or maximum completion time , 1996 .
[10] Michael Pinedo,et al. Sequencing in an Assembly Line with Blocking to Minimize Cycle Time , 1989, Oper. Res..
[11] Peter C. Nelson,et al. Optimization of high-speed multistation SMT placement machines using evolutionary algorithms , 1999 .
[12] Günter Schmidt,et al. Scheduling with limited machine availability , 2000, Eur. J. Oper. Res..
[13] Soumen Ghosh,et al. A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems , 1989 .
[14] Tadeusz Sawik. Discrete programming model for scheduling SMT lines , 2000 .