Motion-based method for estimating time required to attach self-adhesive insulators
暂无分享,去创建一个
[1] Geoffrey Boothroyd,et al. Product design for manufacture and assembly , 1994, Comput. Aided Des..
[2] Toshijiro Ohashi,et al. Assembly Reliability Evaluation Method (AREM) , 2003 .
[3] Walton M. Hancock,et al. Advanced Work Measurement , 1982 .
[4] Walter Rohmert. Predetermined Motion-Time Systems , 1971 .
[5] Karl T. Ulrich,et al. Product Design and Development , 1995 .
[6] G. Boothroyd,et al. Design for Assembly and Disassembly , 1992 .
[7] Harold Bright Maynard,et al. Methods-time measurement , 1948 .
[8] Lawrence S. Aft. Work Measurement and Methods Improvement , 2000 .
[9] Kjell B. Zandin,et al. MOST® Work Measurement Systems , 1990 .
[10] Anil Mital,et al. Computerized predetermined motion-time systems in manufacturing industries , 1990 .
[11] B. Niebel. Motion and Time Study , 1976 .
[12] Minoru Iwata,et al. Extended Assemblability Evaluation Method (AEM) , 2002 .
[13] Abdul Talib Bon,et al. Time motion study in determination of time standard in manpower process , 2010 .
[14] G. Boothroyd,et al. Early cost estimating in product design , 1988 .
[15] G. Boothroyd,et al. Assembly Automation and Product Design , 1991 .
[16] Delmar W. Karger,et al. Engineered work measurement : the principles, techniques, and data of methods-time measurement, background and foundations of work measurement and methods-time measurement, plus other related material , 1987 .
[17] G. Boothroyd. Design for assembly—The key to design for manufacture , 1987 .
[18] Essam Shehab,et al. A design to cost system for innovative product development , 2002 .