Motion-based method for estimating time required to attach self-adhesive insulators

Abstract A self-adhesive insulator is a component of a home appliance that is used to suppress vibration or prevent humidity affecting the internal parts of the appliance. There is a wide range of types and designs available, allowing them to be applied to areas having different shapes. At the design stage, once an insulator design has been developed sufficiently to identify its dimensions and features, the attaching time and baseline cost must be estimated with reasonable accuracy to enable a comparison of vendor quotes. However, the current estimation method is not sufficiently accurate in terms of the baseline cost. This paper presents a motion-based time-estimating scheme with which the time required for the attachment of such insulators can be calculated more accurately. The scheme has been developed by analyzing the motions needed to attach 350 insulators and then designating representative motions and their time values. For this purpose, a modular arrangement of predetermined time standards (MODAPTS) is adopted. Motion-based time-estimation method is useful in terms of simplicity and accuracy. It enables design engineers to estimate the time required for the attachment based only on a drawing of the insulator and a few MODAPTS rules. Estimates made with this method should vary from the actual value by no more than 9.5%.

[1]  Geoffrey Boothroyd,et al.  Product design for manufacture and assembly , 1994, Comput. Aided Des..

[2]  Toshijiro Ohashi,et al.  Assembly Reliability Evaluation Method (AREM) , 2003 .

[3]  Walton M. Hancock,et al.  Advanced Work Measurement , 1982 .

[4]  Walter Rohmert Predetermined Motion-Time Systems , 1971 .

[5]  Karl T. Ulrich,et al.  Product Design and Development , 1995 .

[6]  G. Boothroyd,et al.  Design for Assembly and Disassembly , 1992 .

[7]  Harold Bright Maynard,et al.  Methods-time measurement , 1948 .

[8]  Lawrence S. Aft Work Measurement and Methods Improvement , 2000 .

[9]  Kjell B. Zandin,et al.  MOST® Work Measurement Systems , 1990 .

[10]  Anil Mital,et al.  Computerized predetermined motion-time systems in manufacturing industries , 1990 .

[11]  B. Niebel Motion and Time Study , 1976 .

[12]  Minoru Iwata,et al.  Extended Assemblability Evaluation Method (AEM) , 2002 .

[13]  Abdul Talib Bon,et al.  Time motion study in determination of time standard in manpower process , 2010 .

[14]  G. Boothroyd,et al.  Early cost estimating in product design , 1988 .

[15]  G. Boothroyd,et al.  Assembly Automation and Product Design , 1991 .

[16]  Delmar W. Karger,et al.  Engineered work measurement : the principles, techniques, and data of methods-time measurement, background and foundations of work measurement and methods-time measurement, plus other related material , 1987 .

[17]  G. Boothroyd Design for assembly—The key to design for manufacture , 1987 .

[18]  Essam Shehab,et al.  A design to cost system for innovative product development , 2002 .