Key Parameters and Form-Finding of an Innovative Prefabricated Steel Bridge
暂无分享,去创建一个
[1] Robert Hällmark,et al. Prefabricated Bridge Construction across Europe and America , 2012 .
[2] Clifford Lam,et al. Experimental Study on Prefabricated Concrete Bridge Girder-to-Girder Intermittent Bolted Connections System , 2007 .
[3] Xun Guo,et al. Lessons Learned from the Damaged Huilan Interchange in the 2008 Wenchuan Earthquake , 2012 .
[4] Algirdas Juozapaitis,et al. Unconventional Double-Level Structural System for Under-Deck Cable-Stayed Bridges , 2012 .
[5] Michael G. Oliva,et al. Rapid-Construction Technique for Bridge Abutments Using Controlled Low-Strength Materials , 2014 .
[6] Andrius Grigusevičius,et al. Optimization of Bridge Trusses Height and Bars Cross-Sections , 2012 .
[7] Brian J. Leshko. Bridge Design Innovation: Materials and Construction , 2006 .
[8] Ashley P. Thrall,et al. Portable and Rapidly Deployable Bridges: Historical Perspective and Recent Technology Developments , 2013 .
[9] Cliff Schexnayder,et al. Emergency Accelerated Construction , 2010 .
[10] Algirdas Juozapaitis,et al. The Analysis of the Behaviour of an Innovative Pedestrian Steel Bridge , 2012 .
[11] Zhongguo John Ma,et al. Effect of Intermediate Diaphragms on Decked Bulb-Tee Bridge System for Accelerated Construction , 2010 .