Inspection policies for a scale

The present study proposes two types of periodical inspection policies for a scale which weighs products in the final stage of manufacturing some specific products, such as chemical products. The scale is inspected at time iT(i=1,2, … ). Under ModelI, an inspection operation involves detection of a scale malfunction or inaccuracy as well as an adjustment activity. Under ModelII, an inspection is conducted only to detect a scale malfunction. If a scale malfunction is detected, an adjustment activity follows. For each model, the fraction defective and the long‐run average cost are formulated. We then examine the existence of an inspection interval Tα which makes the fraction defective under a prespecified value α (0< α <1). An economical inspection interval T* minimizing the long‐run average cost is also discussed.

[1]  R. Barlow,et al.  Optimum Preventive Maintenance Policies , 1960 .

[2]  George H. Weiss,et al.  A Problem in Equipment Maintenance , 1962 .

[3]  Marvin Zelen,et al.  Mathematical Theory of Reliability , 1965 .

[4]  A. G. Munford,et al.  A Nearly Optimal Inspection Policy , 1972 .

[5]  A. K. Shahani,et al.  An Inspection Policy for the Weibull Case , 1973 .

[6]  S. Zacks,et al.  Sequential determination of inspection epochs for reliability systems with general lifetime distributions , 1973 .

[7]  H. Luss,et al.  Inspection Policies When Duration of Checkings is Non-Negligible , 1974 .

[8]  Hanan Luss,et al.  A Preparedness Model Dealing with N Systems Operating Simultaneously , 1974, Oper. Res..

[9]  J. Keller Optimum Checking Schedules for Systems Subject to Random Failure , 1974 .

[10]  W. G. Schneeweiss On the Mean Duration of Hidden Faults in Periodically Checked Systems , 1976, IEEE Transactions on Reliability.

[11]  D. Anbar,et al.  An asymptotically optimal inspection policy , 1976 .

[12]  W.G. Schneeweiss Duration of Hidden Faults in Randomly Checked Systems , 1977, IEEE Transactions on Reliability.

[13]  Z. Kander Inspection policies for deteriorating equipment characterized by n quality levels , 1978 .

[14]  Pandu R. Tadikamalla,et al.  An Inspection Policy for the Gamma Failure Distributions , 1979 .

[15]  L. Shaw,et al.  Optimal Inspection Schedules for Failure Detection in a Model Where Tests Hasten Failures , 1979, Oper. Res..

[16]  Toshio Nakagawa,et al.  Approximate Calculation of Inspection Policy with Weibull Failure Times , 1979, IEEE Transactions on Reliability.

[17]  Toshio Nakagawa,et al.  Approximate Calculation of Optimal Inspection Times , 1980 .

[18]  Ashok Gupta,et al.  Optimal Inspection Policy For Multistage Production Process With Alternate Inspection Plans , 1981, IEEE Transactions on Reliability.

[19]  Toshio Nakagawa Periodic inspection policy with preventive maintenance , 1984 .

[20]  Naoto Kaio,et al.  Some Remarks on Optimum Inspection Policies , 1984, IEEE Transactions on Reliability.

[21]  Shunji Osaki,et al.  Applied stochastic system modeling , 1985 .

[22]  Henk Tijms,et al.  A Markov decision algorithm for optimal inspections and revisions in a maintenance system with partial information , 1985 .

[23]  Shunji Osaki,et al.  Optimal inspection policy with two types of imperfect inspection probabilities , 1986 .

[24]  Bong Jin Yum,et al.  Optimal inspection policies in a serial production system including scrap rework and repair: an MILP approach , 1987 .

[25]  Naoto Kaio,et al.  Inspection policies : comparisons and modifications , 1988 .

[26]  Shunji Osaki,et al.  Comparison of Inspection Policies , 1989 .

[27]  Christos G. Cassandras,et al.  Optimal inspection policies for a manufacturing station , 1992 .

[28]  Diederik J.D. Wijnmalen,et al.  Review of a Markov decision algorithm for optimal inspections and revisions in a maintenance system with partial information , 1992 .

[29]  Tadashi Dohi,et al.  Inspection policy with failure due to inspection , 1994 .

[30]  Sheldon M. Ross Introduction to Probability Models. , 1995 .