Critical success factors for improving team integration in Industrialised Building System (IBS) construction projects: The Malaysian case
暂无分享,去创建一个
[1] Douglas J. Ayers,et al. An Exploratory Investigation of Organizational Antecedents to New Product Success , 1997 .
[2] Teresa M. Amabile,et al. Motivating Creativity in Organizations: On Doing What You Love and Loving What You Do , 1997 .
[3] Peter E.D. Love,et al. Concurrent engineering: a multi‐disciplinary approach for construction , 1998 .
[4] D. Lambert,et al. SUPPLY CHAIN MANAGEMENT -- MORE THAN A NEW NAME FOR LOGISTICS , 1997 .
[5] Ian Smith. Continuing professional development and workplace learning - 14 : Communicating in times of change , 2006 .
[6] Avan R. Jassawalla,et al. An Examination of Collaboration in High‐Technology New Product Development Processes , 1998 .
[7] Jorge F. S. Gomes,et al. Critical success factors for cross‐functional teamwork in new product development , 2000 .
[8] M. Hoegl,et al. Teamwork Quality and the Success of Innovative Projects , 2001 .
[9] John Bowron. Re-engineering the project procurement process through concurrent engineering , 2002 .
[10] Mohamad I. Mohamad. The application of concurrent engineering philosophy to the construction industry , 1999 .
[11] Akintola Akintoye,et al. An analysis of success factors and benefits of partnering in construction , 2000 .
[12] Richard Haigh,et al. Achieving excellence in construction , 2005 .
[13] Mohammed Abukhzam Faraj. The development of a framework to aid the identification of factors inhibiting bank staff's attitude towards e-banking adoption in Libya , 2011 .
[14] E. McDonough. Investigation of Factors Contributing to the Success of Cross-Functional Teams , 2000 .
[15] Bernard Kofi Baiden. Framework for the integration of the project delivery team , 2006 .
[16] A. Dainty,et al. Integrated project teams’ performance in managing unexpected change events , 1999 .
[17] Chimay J. Anumba,et al. Construction in the UK Petrochemical Industry - Aspects of Concurrent Engineering Practice , 1997 .
[18] A. Donnellon. Crossfunctional Teams in Product Development: Accommodating the Structure to the Process , 1993 .
[19] Robert J. Hershock,et al. From experience: Action teams that work , 1994 .
[20] Walid Belassi,et al. A new framework for determining critical success/failure factors in projects , 1996 .
[21] A. Dainty,et al. New perspectives on construction supply chain integration , 2001 .
[22] Quentin W. Fleming,et al. Integrated project development teams: another fad … or a permanent change , 1996 .
[23] D. Denison,et al. From Chimneys to Cross-Functional Teams: Developing and Validating a Diagnostic Model , 1996 .
[24] Keith R. Molenaar,et al. Sensitivity of Construction Activities under Design Uncertainty , 2009 .
[25] Andrew R.J. Dainty,et al. The extent of team integration within construction projects , 2006 .
[26] A. Akintoye. Design and build: a survey of construction contractors’ views , 1994 .
[27] Andrew R.J. Dainty,et al. Looking beyond process: human factors in team integration , 2003 .
[28] Jeffrey K. Pinto,et al. Critical factors in successful project implementation , 1987, IEEE Transactions on Engineering Management.
[29] G. Ofori. Greening the construction supply chain in Singapore , 2000 .
[30] A. Edmondson. Psychological Safety and Learning Behavior in Work Teams , 1999 .