Alternative Strategies for Temporary Support during Structural Repair of Reinforced-Concrete Beams
暂无分享,去创建一个
Repairs to reinforced concrete beams suffering from chloride-induced corrosion necessitate breaking out concrete around reinforcement. Reinforcement and concrete cannot act compositely where bars are exposed, and the pattern of strains in a beam under load is altered. The present study evaluates postrepair structural performance of reinforced-concrete beams repaired when relieved of load and when repaired under load and using a variety of alternative approaches to maintain structural stability during repair operations. Two series of four or five beams each were loaded and subjected to simulated repair in the laboratory. A reference "as-new" beam was also tested in each series for comparison. The ultimate strength of beams repaired under load was not reduced in comparison with "as-new" companion specimens, although ductility, deflection crack widths, and flexural stiffness were all affected. However, results do not suggest significant benefits in postrepair performance will be obtained through relieving a structure of load or from application of temporary longitudinal prestress while repairs are carried out. For beams repaired under load, two stage repairs (in which only half the reinforcement at a section is exposed at any one time) offered little overall improvement over single-stage repairs in which all bars were exposed simultaneously.
[1] Peter Pullar-Strecker,et al. Corrosion damaged concrete : assessment and repair , 1987 .
[2] J Cairns. LOAD RELIEF DURING STRUCTURAL REPAIRS TO REINFORCED CONCRETE BEAMS. , 1993 .
[3] H. Roper,et al. Concrete structures : materials, maintenance, and repair , 1991 .
[4] R. N. Swamy,et al. ARCH ACTION AND BOND IN CONCRETE SHEAR FAILURES , 1970 .
[5] J Cairns,et al. STRENGTH IN SHEAR OF CONCRETE BEAMS WITH EXPOSED REINFORCEMENT. , 1995 .