Evaluation of severe accident risks, Peach Bottom, Unit 2: Appendices
暂无分享,去创建一个
In support of the Nuclear Regulatory Commission's (NRC's) assessment of the risk from severe accidents at commercial nuclear power plants in the US reported in NUREG-1150, the Severe Accident Risk Reduction Program (SARRP) has completed a revised calculation of the risk to the general public from severe accidents at the Peach Bottom Atomic Power Station, Unit 2. This power plant, located in southeastern Pennsylvania, is operated by the Philadelphia Electric Company. The emphasis in this risk analysis was not on determining a so-called'' point estimate of risk. Rather, it was to determine the distribution of risk, and to discover the uncertainties that account for the breadth of this distribution. Off-site risk initiated by events both internal and external to the power station were assessed. This document provides Appendices A through E which include the following topics respectively: accident progression event tree; supporting information for the source term analysis; supporting information for the consequence analysis; risk results; and sampling information. 6 figs., 6 tabs.