건설폐기물에 대한 관련 주체별 인식조사를 위한 기초연구

By-product and construction waste in construction site are doing to damage earth environment including soil, water, air etc,. Public official, contractor and waste management are concerned in construction waste management process since waste occurrence. Each stakeholder has different notion about construction waste management, but systematic research of this has not accomplished before. This study's purpose is to deduce construction waste processing problems systematically by a study for stakeholders' perception investigation on construction waste. So, this study analyzed domesticㆍforeign construction waste condition through former study, deduced problem of construction waste management and related law, interviewed with stakeholders of construction waste, and modified the problem list. By the result, this study deduced problems of 18 item in 3 section. That is “lack of understanding about storage and lading rule", "recycling way is less", "complicated document" etc. In this study, had deduced construction waste processing problems, and problems list may be used to basis data of next study. In the future, it is necessary to analyze quantitatively problems and a related improvement. And also, a study for construction waste reduction must is necessary.