Supporting business processes through human and IT factors: a maturity model

Purpose The purpose of this paper is to assist organizations in the assessment of both information technology (IT) and human factors required to support their business processes (BPs) by taking into account the interdependence and alignment of these factors, rather than considering them independently. Design/methodology/approach A design science research methodology was followed to build a maturity model (MM) enabling this assessment. The proposed design process is composed of four steps: problem identification, comparison of 19 existing MMs in business process management (BPM), iterative model development, and model evaluation. The last two steps were specifically based on three research methods: literature analysis, case studies, and expert panels. Findings This paper presents a MM that assigns a maturity level to an organization’s BPs in two assessment steps. The first step evaluates the level of sophistication and integration of the IT systems supporting each BP, while the second step assesses the alignment of human factors with the technological efforts. Research limitations/implications The research was conducted with SMEs, leading to results that may be specific to this type of organization. Practical implications Practitioners can use the proposed model throughout their journey toward process excellence. The application of this model leads to two main process improvement scenarios: upgrading the sophistication and integration of the software technologies in support of the processes, and improving the cohesion of the resources the organization already owns (human and IT resources). Originality/value The proposed MM constitutes a first step in the assessment of the interdependence between the factors influencing BPM.

[1]  M. Porter,et al.  How Information Gives You Competitive Advantage , 1985 .

[2]  Jaideep Motwani,et al.  Critical factors for successful ERP implementation: Exploratory findings from four case studies , 2005, Comput. Ind..

[3]  Carlos Francisco Simões Gomes,et al.  Assessment of Maturity in Project Management: A Bibliometric Study of Main Models , 2015, ITQM.

[4]  Kemal Altinkemer,et al.  Productivity and Performance Effects of Business Process Reengineering: A Firm-Level Analysis , 2011, J. Manag. Inf. Syst..

[5]  D. Tranfield,et al.  Factors characterising the maturity of BPR programmes , 2003 .

[6]  Michael Rohloff,et al.  Case Study and Maturity Model for Business Process Management Implementation , 2009, BPM.

[7]  Arijit Sikdar,et al.  A process model of managing organizational change during business process redesign , 2014, Bus. Process. Manag. J..

[8]  Michael Rosemann,et al.  Understanding the Main Phases of Developing a Maturity Assessment Model , 2005 .

[9]  Richard Hung Business process management as competitive advantage: a review and empirical study , 2006 .

[10]  Silvia Inês Dallavalle de Pádua,et al.  Process management tasks and barriers: functional to processes approach , 2012, Bus. Process. Manag. J..

[11]  Vincent C. Yen An integrated model for business process measurement , 2009, Bus. Process. Manag. J..

[12]  Joseph Sarkis,et al.  A grey-based DEMATEL model for evaluating business process management critical success factors , 2013 .

[13]  Peter Trkman,et al.  International Journal of Information Management , 2022 .

[14]  Mark N. Frolick,et al.  The IT Value Hierarchy: Using Maslow's Hierarchy of Needs as a Metaphor for Gauging the Maturity Level of Information Technology Use within Competitive Organizations , 2008, Inf. Syst. Manag..

[15]  Manuel Resinas,et al.  Defining Process Performance Indicators: An Ontological Approach , 2010, OTM Conferences.

[16]  Robert Winter,et al.  Inductive Design of Maturity Models: Applying the Rasch Algorithm for Design Science Research , 2011, DESRIST.

[17]  Mohsen Attaran,et al.  Exploring the relationship between information technology and business process reengineering , 2004, Inf. Manag..

[18]  Amy Van Looy Does IT Matter for Business Process Maturity? A Comparative Study on Business Process Maturity Models , 2010, OTM Workshops.

[19]  Remco M. Dijkman,et al.  Properties that influence business process management maturity and its effect on organizational performance , 2016, Inf. Syst. Frontiers.

[20]  M. Hammer The process audit. , 2007, Harvard business review.

[21]  Jörg Becker,et al.  Maturity models in business process management , 2012, Bus. Process. Manag. J..

[22]  Roy Wendler,et al.  The maturity of maturity model research: A systematic mapping study , 2012, Inf. Softw. Technol..

[23]  Jan Recker,et al.  Ten principles of good business process management , 2014, Bus. Process. Manag. J..

[24]  Paul Hofmann,et al.  Drivers for Improving Supply Chain Performance: An Empirical Study , 2006 .

[25]  Michael Rosemann,et al.  Towards a Business Process Management Maturity Model , 2005, ECIS.

[26]  Jana Koehler,et al.  An impact-oriented maturity model for IT-based case management , 2015, Inf. Syst..

[27]  Geert Poels,et al.  Choosing the right business process maturity model , 2013, Inf. Manag..

[28]  Peter Trkman,et al.  Increasing process orientation with business process management: Critical practices' , 2013, Int. J. Inf. Manag..

[29]  Michael Rohloff Process Management Maturity Assessment , 2009, AMCIS.

[30]  J. Campbell,et al.  An inductive framework for enhancing supply chain integration , 2005 .

[31]  Sandy Chong,et al.  Business process management for SMEs: an exploratory study of implementation factors for the Australian wine industry , 2014 .

[32]  Walter Brenner,et al.  Developing a maturity model for service systems in heavy equipment manufacturing enterprises , 2014, Inf. Manag..

[33]  Jörg H. Mayer,et al.  A Maturity Model for Management Control Systems , 2012, Business & Information Systems Engineering.

[34]  Elena Gorbacheva,et al.  Towards a typology of business process management professionals: identifying patterns of competences through latent semantic analysis , 2016, Enterp. Inf. Syst..

[35]  Mojca Indihar Stemberger,et al.  A global investigation of key turning points in business process maturity , 2009, Bus. Process. Manag. J..

[36]  Jan Recker,et al.  Development and validation of an instrument to measure organizational cultures' support of Business Process Management , 2014, Inf. Manag..

[37]  Beate List,et al.  Towards a Corporate Performance Measurement System , 2004, SAC '04.

[38]  J. Renken Developing an IS/ICT management capability maturity framework , 2004 .

[39]  Marco Alberti,et al.  A framework to assess performance measurement systems in SMEs , 2010 .

[40]  Jörg Becker,et al.  Developing Maturity Models for IT Management , 2009, Bus. Inf. Syst. Eng..

[41]  R. S. Choenni,et al.  On the Evaluation of Workflow Systems in Business Processes , 2003 .

[42]  Thomas H. Davenport,et al.  The New Industrial Engineering: Information Technology and Business Process Redesign , 2011 .