Self-Optimization Simulation Model of Short-Term Cascaded Hydroelectric System Dispatching Based on the Daily Load Curve
暂无分享,去创建一个
Liping Wang | Yan-ke Zhang | Ji-wei Li | Xin-Ming Zhang | Yanke Zhang | Liping Wang | Xinming Zhang | Ji-wei Li
[1] Miguel A. Mariño,et al. Multi-reservoir Operation Rules: Multi-swarm PSO-based Optimization Approach , 2011, Water Resources Management.
[2] Joao P. S. Catalao,et al. Scheduling of head-dependent cascaded hydro systems: mixed-integer quadratic programming approach , 2010 .
[3] Dominic C.Y. Foo,et al. Optimal energy planning models with carbon footprint constraints , 2010 .
[4] Raheleh Afzali,et al. Reliability-Based Simulation-Optimization Model for Multireservoir Hydropower Systems Operations: Khersan Experience , 2008 .
[5] Xiaohui Yuan,et al. Optimal self-scheduling of hydro producer in the electricity market , 2010 .
[6] Noor Khan,et al. Reservoir Optimization-Simulation with a Sediment Evacuation Model to Minimize Irrigation Deficits , 2012, Water Resources Management.
[7] Liu Xin. Short-term operation benefit analysis of cascade reservoirs based on power load curve , 2011 .
[8] Secundino Soares,et al. Short term hydroelectric scheduling combining network flow and interior point approaches , 2005 .