Requirements identification for 4D constraintbased construction planning and control system

2 Abstract: Construction planning and control are identified among the top potential areas needing improvements. A traditional technique known as the Critical Path Method (CPM) has been widely criticised in terms of its inability to cope with non- precedence constraints, difficulty to evaluate and communicate interdependencies, and inadequacy for work-face productions. Attempting to treat these deficiencies, substantial research efforts have resulted in a wide range of advancements including design of new planning and control methodologies and development of sophisticated computerised applications. However, these efforts have not effectively overcome all of the above CPM drawbacks and, therefore, have not yet provided a solution to the industry.

[1]  Yeong W. Kim Resource-Driven Scheduling , 1991 .

[2]  Raymond E. Levitt,et al.  OARPLAN: Generating project plans by reasoning about objects, actions and resources , 1988, Artificial Intelligence for Engineering Design, Analysis and Manufacturing.

[3]  C. William Ibbs,et al.  Sequencing Knowledge for Construction Scheduling , 1991 .

[4]  Yvan J. Beliveau,et al.  SCaRC: Space-Constrained Resource-Constrained Scheduling System , 1997 .

[5]  Jonathan Jingshen Shi,et al.  Object-oriented resource-based planning method (ORPM) for construction , 2000 .

[6]  Amr A. Oloufa,et al.  Computer-Generated Building Data: Topological Information , 2001 .

[7]  Hyun Jeong Choo,et al.  Requirements and Barriers to Adoption of Last Planner Computer Tools , 2001 .

[8]  Ali Jaafari Time and priority allocation scheduling technique for projects , 1996 .

[9]  Robert D. Logcher,et al.  Integrating CAD with Construction‐Schedule Generation , 1991 .

[10]  Abraham Warszawski,et al.  Knowledge-Based System for Construction Planning of High-Rise Buildings , 1995 .

[11]  Martin Fischer,et al.  Generating, evaluating and visualizing construction schedules with CAD tools , 1998 .

[12]  Aviad Shapira,et al.  VR-based planning of construction site activities , 1999 .

[13]  William Morris The American Heritage dictionary of the English language , 1969 .

[14]  Jerry Brown,et al.  Multi-Constraints in Construction Planning , 1995 .

[15]  Lloyd M. Waugh Constraint knowledge for construction scheduling , 1990, Expert Planning Systems.

[16]  Martin Fischer,et al.  Automated Generation of Work Spaces Required by Construction Activities , 2002 .

[17]  Li Jun Shen,et al.  Constraint Modeling and Buffer Management With Integrated Production Scheduler , 2001 .

[18]  Florian Aalami,et al.  Scheduling with Computer-Interpretable Construction Method Models , 1996 .

[19]  Carl T. Haas,et al.  An Interactive Planning Environment for Critical Operations , 1996 .

[20]  Issam A. Minkarah,et al.  An Automated Cost Planning System (ACPS) for Construction Projects , 1993 .

[21]  Raymond E. Levitt,et al.  Artificial Intelligence Techniques for Generating Construction Project Plans , 1988 .

[22]  Khaled A El-Rayes,et al.  Resource-driven scheduling of repetitive activities , 1998 .

[23]  David K. H. Chua,et al.  Integrated Production Scheduler for Construction Look-Ahead Planning , 1999 .

[24]  Mustafa Pultar Progress-based construction scheduling , 1990 .

[25]  Hossam El-Bibany,et al.  PARAMETRIC CONSTRAINT MANAGEMENT IN PLANNING AND SCHEDULING: COMPUTATIONAL BASIS , 1997 .

[26]  Herman Glenn Ballard,et al.  THE LAST PLANNER SYSTEM OF PRODUCTION CONTROL , 2000 .

[27]  Martin Fischer,et al.  Importance of Capacity Constraints to Construction Cost and Schedule , 2000 .

[28]  Bruce M. Woodworth,et al.  Identifying the critical sequence in a resource constrained project , 1988 .

[29]  David Greenwood,et al.  An efficient method for scheduling construction projects with resource constraints , 2001 .

[30]  David E. Wilkins,et al.  Extending Artificial Intelligence Techniques for Hierarchical Planning , 1991 .

[31]  Raymond E. Levitt,et al.  Intelligent Planning of Construction Projects , 1990 .

[32]  Sönke Hartmann,et al.  Project Scheduling under Limited Resources , 1999 .

[33]  Iris D. Tommelein,et al.  WORKPLAN: CONSTRAINT-BASED DATABASE FOR WORK PACKAGE SCHEDULING , 1999 .

[34]  Ali Jaafari Criticism of CPM for Project Planning Analysis , 1984 .