Requirements identification for 4D constraintbased construction planning and control system
暂无分享,去创建一个
[1] Yeong W. Kim. Resource-Driven Scheduling , 1991 .
[2] Raymond E. Levitt,et al. OARPLAN: Generating project plans by reasoning about objects, actions and resources , 1988, Artificial Intelligence for Engineering Design, Analysis and Manufacturing.
[3] C. William Ibbs,et al. Sequencing Knowledge for Construction Scheduling , 1991 .
[4] Yvan J. Beliveau,et al. SCaRC: Space-Constrained Resource-Constrained Scheduling System , 1997 .
[5] Jonathan Jingshen Shi,et al. Object-oriented resource-based planning method (ORPM) for construction , 2000 .
[6] Amr A. Oloufa,et al. Computer-Generated Building Data: Topological Information , 2001 .
[7] Hyun Jeong Choo,et al. Requirements and Barriers to Adoption of Last Planner Computer Tools , 2001 .
[8] Ali Jaafari. Time and priority allocation scheduling technique for projects , 1996 .
[9] Robert D. Logcher,et al. Integrating CAD with Construction‐Schedule Generation , 1991 .
[10] Abraham Warszawski,et al. Knowledge-Based System for Construction Planning of High-Rise Buildings , 1995 .
[11] Martin Fischer,et al. Generating, evaluating and visualizing construction schedules with CAD tools , 1998 .
[12] Aviad Shapira,et al. VR-based planning of construction site activities , 1999 .
[13] William Morris. The American Heritage dictionary of the English language , 1969 .
[14] Jerry Brown,et al. Multi-Constraints in Construction Planning , 1995 .
[15] Lloyd M. Waugh. Constraint knowledge for construction scheduling , 1990, Expert Planning Systems.
[16] Martin Fischer,et al. Automated Generation of Work Spaces Required by Construction Activities , 2002 .
[17] Li Jun Shen,et al. Constraint Modeling and Buffer Management With Integrated Production Scheduler , 2001 .
[18] Florian Aalami,et al. Scheduling with Computer-Interpretable Construction Method Models , 1996 .
[19] Carl T. Haas,et al. An Interactive Planning Environment for Critical Operations , 1996 .
[20] Issam A. Minkarah,et al. An Automated Cost Planning System (ACPS) for Construction Projects , 1993 .
[21] Raymond E. Levitt,et al. Artificial Intelligence Techniques for Generating Construction Project Plans , 1988 .
[22] Khaled A El-Rayes,et al. Resource-driven scheduling of repetitive activities , 1998 .
[23] David K. H. Chua,et al. Integrated Production Scheduler for Construction Look-Ahead Planning , 1999 .
[24] Mustafa Pultar. Progress-based construction scheduling , 1990 .
[25] Hossam El-Bibany,et al. PARAMETRIC CONSTRAINT MANAGEMENT IN PLANNING AND SCHEDULING: COMPUTATIONAL BASIS , 1997 .
[26] Herman Glenn Ballard,et al. THE LAST PLANNER SYSTEM OF PRODUCTION CONTROL , 2000 .
[27] Martin Fischer,et al. Importance of Capacity Constraints to Construction Cost and Schedule , 2000 .
[28] Bruce M. Woodworth,et al. Identifying the critical sequence in a resource constrained project , 1988 .
[29] David Greenwood,et al. An efficient method for scheduling construction projects with resource constraints , 2001 .
[30] David E. Wilkins,et al. Extending Artificial Intelligence Techniques for Hierarchical Planning , 1991 .
[31] Raymond E. Levitt,et al. Intelligent Planning of Construction Projects , 1990 .
[32] Sönke Hartmann,et al. Project Scheduling under Limited Resources , 1999 .
[33] Iris D. Tommelein,et al. WORKPLAN: CONSTRAINT-BASED DATABASE FOR WORK PACKAGE SCHEDULING , 1999 .
[34] Ali Jaafari. Criticism of CPM for Project Planning Analysis , 1984 .