Hierarchical production control of a flexible manufacturing system

[1]  Arnoldo C. Hax,et al.  Hierarchical integration of production planning and scheduling , 1973 .

[2]  Joe H. Chow,et al.  Time scale modeling of sparse dynamic networks , 1985 .

[3]  Petar V. Kokotovic,et al.  Subsystems, time scales and multimodeling , 1981, Autom..

[4]  Sven Axsäter,et al.  Aggregation of Product Data for Hierarchical Production Planning , 1981, Oper. Res..

[5]  S. Graves Using Lagrangean Techniques to Solve Hierarchical Production Planning Problems , 1982 .

[6]  Gabriel R. Bitran,et al.  Hierarchical Production Planning: A Single Stage System , 1981, Oper. Res..

[7]  Stanley B. Gershwin,et al.  Short term production scheduling of an automated manufacturing facility , 1984, The 23rd IEEE Conference on Decision and Control.

[8]  Michael Athans,et al.  Survey of decentralized control methods for large scale systems , 1978 .

[9]  Stephen C. Graves,et al.  A Review of Production Scheduling , 1981, Oper. Res..

[10]  Petar V. Kokotovic,et al.  Singular perturbations and time-scale methods in control theory: Survey 1976-1983 , 1982, Autom..

[11]  Stanley Gershwin A hierarchical framework for manufacturing systems scheduling: A two-machine example , 1987, 26th IEEE Conference on Decision and Control.

[12]  François Delebecque,et al.  Optimal control of markov chains admitting strong and weak interactions , 1981, Autom..

[13]  R. Rishel Dynamic Programming and Minimum Principles for Systems with Jump Markov Disturbances , 1975 .