Development of a benchmarking model for BIM implementation in developing countries
暂无分享,去创建一个
[1] Olatunji Samuel Olusola,et al. Achieving Value for Money (VFM) in Construction Projects , 2017 .
[2] Charles M. Eastman,et al. Building Information Modeling (BIM) and Safety: Automatic Safety Checking of Construction Models and Schedules , 2013 .
[3] Abdul Samad Kazi,et al. Semantic product modelling and configuration: challenges and opportunities , 2009, J. Inf. Technol. Constr..
[4] Arno Schlueter,et al. Building information model based energy/exergy performance assessment in early design stages , 2009 .
[5] Sebastian Fuchs,et al. BIM-BASED GENERATION OF MULTI-MODEL VIEWS , 2010 .
[6] Saseela Balagobei. Efficiency of Micro Finance Institutions and Financial Sustainability in Jaffna District , 2016 .
[7] David Arditi,et al. Adoption of BIM in architectural design firms , 2017 .
[8] Martin Fischer,et al. Effect of Information Standards on the Design-Construction Interface: Case Examples from the Steel Industry , 2000 .
[9] Jean Robert Kala Kamdjoug,et al. Assessment of actions in a multi-actor and multicriteria framework: application to the refunding of microfinance institutions , 2007 .
[10] Ghang Lee,et al. The Status of BIM Adoption on Six Continents , 2015 .
[11] Timothy O. Olawumi,et al. Evolution in the intellectual structure of BIM research: a bibliometric analysis , 2017 .
[12] J. Lainhart. COBIT™: A Methodology for Managing and Controlling Information and Information Technology Risks and Vulnerabilities , 2000 .
[13] Johnny Wong,et al. Barriers to the integration of BIM and sustainability practices in construction projects: A Delphi survey of international experts , 2018, Journal of Building Engineering.
[14] Ajla Aksamija,et al. BIM-Based Building Performance Analysis: Evaluation and Simulation of Design Decisions , 2012 .
[15] Tomo Cerovsek,et al. Active process reuse model for collaboration , 2006, J. Inf. Technol. Constr..
[16] Raja R. A. Issa,et al. Synthesis of Existing BIM Maturity Toolsets to Evaluate Building Owners , 2013 .
[17] Laura Álvarez Antón,et al. Integration of LCA and BIM for Sustainable Construction , 2014 .
[18] Jan A. van Lith,et al. Assessing maturity development of purchasing management in construction , 2015 .
[19] Jacky K.H. Chung,et al. A Group Support System for improving value management studies in construction , 2004 .
[20] Tak Wa Chan,et al. Barriers of Implementing BIM in Construction Industry from the Designers' Perspective: A Hong Kong Experience , 2014 .
[21] Fletcher Griffis,et al. Automated Productivity-Based Schedule Animation: Simulation-Based Approach to Time-Cost Trade-Off Analysis , 2014 .
[22] Daniel W.M. Chan,et al. Critical success factors for implementing building information modeling and sustainability practices in construction projects: A Delphi survey , 2019, Sustainable Development.
[23] Seung Wan Hong,et al. Integrated system for BIM-based collaborative design , 2015 .
[24] Roberto Cigolini,et al. Linking product modularity to supply chain integration in the construction and shipbuilding industries , 2015 .
[25] Peter E.D. Love,et al. Building information modelling in construction: insights from collaboration and change management perspectives , 2018 .
[26] Mohammed Arif,et al. Measuring knowledge retention: a case study of a construction consultancy in the UAE , 2009 .
[27] Ghassan Aouad,et al. Editorial - Next generation construction IT: technology foresight, future studies, roadmapping and scenario planning , 2009, J. Inf. Technol. Constr..
[28] Simon A. Austin,et al. Applying future industrialised processes to construction , 2007 .
[29] Eduardo Toledo Santos,et al. The scenario and trends in the Brazilian IT construction applications' experience , 2007, J. Inf. Technol. Constr..
[30] Yimin Zhu,et al. Integration of Building Information Modeling and Economic and Environmental Impact Analysis to Support Sustainable Building Design , 2015 .
[31] Glenn Ballard,et al. Problems in the Interface Between Mechanical Design and Construction: A Research Proposal , 2001 .
[32] Daniel M. Oppenheimer,et al. Heuristics made easy: an effort-reduction framework. , 2008, Psychological bulletin.
[33] Kenneth L. Kraemer,et al. Information technology and economic performance , 2003, ACM Comput. Surv..
[34] Charles M. Eastman,et al. BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors , 2008 .
[35] Hazar Dib,et al. A measurement model of building information modelling maturity , 2014 .
[36] Hs Jayasena,et al. Assessing the BIM maturity in a BIM infant industry , 2013 .
[37] Dominik Holzer,et al. Rethinking the contractual context for Building Information Modelling (BIM) in the Australian built environment industry , 2013 .
[38] A. C. C. Ezeabasili,et al. Managing the Change Process Association with Building Information Modeling (BIM) Implementation by the Public and Private Investors in the Nigerian Building Industry , 2015 .
[39] Abiola Akanmu,et al. BIM-Based Decision Support System for Material Selection Based on Supplier Rating , 2015 .
[40] Water Distribution Network Analysis of Bedesa Town, Damot Woyde Woreda of Wolaita Zone, Southern Ethiopia , 2017 .
[41] Bamidele Temitope Arijeloye,et al. Value Management – Creating Functional Value For Construction Project: An Exploratory Study , 2016 .
[42] Joachim Blatter,et al. Two or Three Approaches to Explanatory Case Study Research , 2012 .
[43] Abdul-Mohsen Al-Hammad,et al. Interface problems between building owners and designers , 1996 .
[44] Awad S. Hanna,et al. State of Practice of Building Information Modeling in the Mechanical Construction Industry , 2014 .
[45] Kevin McCormack,et al. The development of a supply chain management process maturity model using the concepts of business process orientation , 2004 .
[46] Amin Hammad,et al. Extending IFC to incorporate information of RFID tags attached to building elements , 2016, Adv. Eng. Informatics.
[47] Chimay J. Anumba,et al. A road-map to personalized context-aware services delivery in construction , 2009, J. Inf. Technol. Constr..
[48] Abdul-Mohsen Al-Hammad. Common Interface Problems among Various Construction Parties , 2000 .
[49] Ardeshir Mahdavi,et al. Requirement specification and prototyping for user interfaces of buildings' environmental controls , 2009, J. Inf. Technol. Constr..
[50] Willy Sher,et al. Measuring BIM performance: Five metrics , 2012 .
[51] Deji Rufus Ogunsemi,et al. Demystifying Issues Regarding Public Private Partnerships (PPP) , 2016 .
[52] Timothy O. Olawumi,et al. Identifying and prioritizing the benefits of integrating BIM and sustainability practices in construction projects: A Delphi survey of international experts , 2018, Sustainable Cities and Society.
[53] Karen Kensek. Building Information Modeling , 2014 .
[54] Yvan J. Beliveau,et al. Object Model Framework for Interface Modeling and IT-Oriented Interface Management , 2010 .
[55] Ajibade Ayodeji Aibinu,et al. Status of BIM Adoption and the BIM Experience of Cost Consultants in Australia , 2014 .
[56] Nashwan Dawood,et al. VR-roadmap: a vision for 2030 in the built environment , 2009, J. Inf. Technol. Constr..
[57] Amin Hammad,et al. Lifecycle management of facilities components using radio frequency identification and building information model , 2009, J. Inf. Technol. Constr..
[58] Willy Sher,et al. An integrated approach to BIM competency assessment, acquisition and application , 2013 .
[59] Olawumi Timothy Oluwatosin,et al. Are Quantity Surveyors Competent to Value for Civil Engineering Works? Evaluating QSs' Competencies and Militating Factors , 2016 .
[60] Tamera L. McCuen,et al. Evaluating Award-Winning BIM Projects Using the National Building Information Model Standard Capability Maturity Model , 2012 .
[61] Kalyan Vaidyanathan,et al. CONSTRUCTION SUPPLY CHAIN MATURITY MODEL - CONCEPTUAL FRAMEWORK , 2007 .
[62] Puyan Abolghasemzadeh,et al. A comprehensive method for environmentally sensitive and behavioral microscopic egress analysis in case of fire in buildings , 2013 .
[63] Alastair Watson,et al. Digital buildings - Challenges and opportunities , 2011, Adv. Eng. Informatics.
[64] David J. Edwards,et al. Conceptualising the FinDD API plug-in: A study of BIM-FM integration , 2017 .
[65] Mustafa Alshawi,et al. Exploring how information exchanges can be enhanced through cloud BIM , 2012 .
[66] Xiangyu Wang,et al. An explanatory case study on cloud computing applications in the built environment , 2014 .
[67] Raja R. A. Issa,et al. Framework for Evaluating the BIM Competencies of Facility Owners , 2016 .
[68] Deborah J. Nightingale,et al. Development of a Lean Enterprise Transformation Maturity Model , 2002, Inf. Knowl. Syst. Manag..
[69] Vacharapoom Benjaoran. A cost control system development: A collaborative approach for small and medium-sized contractors , 2009 .
[70] Syed Hasnain Alam Kazmi,et al. Innovation in Education - Inclusion of 3D-Printing Technology in Modern Education System of Pakistan: Case from Pakistani Educational Institutes , 2016 .
[71] Gillian Frances Menzies,et al. Life-Cycle Assessment and the Environmental Impact of Buildings: A Review , 2009 .
[72] M. Abubakar,et al. Contractors Perception of the Factors Affecting Building Information Modelling (BIM) Adoption in the Nigerian Construction Industry , 2014 .
[73] Ardeshir Mahdavi,et al. SEMPER-II: an internet-based multi-domain building performance simulation environment for early design support , 2004 .
[74] Joseph A. Maxwell,et al. Qualitative Research Design: An Interactive Approach , 1996 .
[75] Lukumon O. Oyedele,et al. Design for Deconstruction (DfD): Critical success factors for diverting end-of-life waste from landfills. , 2017, Waste management.
[76] C. William Ibbs,et al. PROJECT MANAGEMENT PROCESS MATURITY (PM)2 MODEL , 2002 .
[77] Niraj Thurairajah,et al. BIM and conceptual design sustainability analysis: An information categorization framework. , 2014 .
[78] Bilal Succar,et al. Building information modelling framework: A research and delivery foundation for industry stakeholders , 2009 .
[79] Yong K. Cho,et al. Case Study of BIM and Cloud–Enabled Real-Time RFID Indoor Localization for Construction Management Applications , 2016 .
[80] Marzia Bolpagni,et al. The implementation of BIM within the public procurement: A model-based approach for the construction industry , 2013 .
[81] J. Maxwell,et al. Qualitative Research Design , 2015 .
[82] Robin Drogemuller,et al. The impact of building information modelling (BIM) maturity and experience on contractor absorptive capacity , 2018 .