Development of a benchmarking model for BIM implementation in developing countries

Purpose The purpose of this paper is to explore building information modeling (BIM) implementation and practices in developed economies by developing a benchmarking model that will enhance BIM adoption and implementation in developing countries. Design/methodology/approach The research design adopted a qualitative approach which includes the desktop review of the extant literature as well as case study reviews of ten BIM projects using an explanatory case study technique to form the foundation upon which the study proposed the model. The moving basis heuristics technique was adopted to develop the scoring system. Findings The BIM benchmarking model and assessment template were developed which consisted of three-level concepts modeled to aid project organizations and project team in developing countries to assess and score the level of improvement and implementation of BIM in a project. A desktop review of BIM projects in developed countries demonstrated the significant improvements and benefits possible through the implementation of the established BIM benchmarking model. Practical implications The assessment template in conjunction with the benchmarking model is useful for a comparative evaluation of similar BIM projects and benchmarking purposes. The study also discussed how current findings extends and contradicts previous findings. Originality/value The findings have provided policymakers, construction stakeholders and professional bodies in the construction industry in developing countries with valuable insights and counter-intuitive perspective that could facilitate the uptake of BIM in construction projects.

[1]  Olatunji Samuel Olusola,et al.  Achieving Value for Money (VFM) in Construction Projects , 2017 .

[2]  Charles M. Eastman,et al.  Building Information Modeling (BIM) and Safety: Automatic Safety Checking of Construction Models and Schedules , 2013 .

[3]  Abdul Samad Kazi,et al.  Semantic product modelling and configuration: challenges and opportunities , 2009, J. Inf. Technol. Constr..

[4]  Arno Schlueter,et al.  Building information model based energy/exergy performance assessment in early design stages , 2009 .

[5]  Sebastian Fuchs,et al.  BIM-BASED GENERATION OF MULTI-MODEL VIEWS , 2010 .

[6]  Saseela Balagobei Efficiency of Micro Finance Institutions and Financial Sustainability in Jaffna District , 2016 .

[7]  David Arditi,et al.  Adoption of BIM in architectural design firms , 2017 .

[8]  Martin Fischer,et al.  Effect of Information Standards on the Design-Construction Interface: Case Examples from the Steel Industry , 2000 .

[9]  Jean Robert Kala Kamdjoug,et al.  Assessment of actions in a multi-actor and multicriteria framework: application to the refunding of microfinance institutions , 2007 .

[10]  Ghang Lee,et al.  The Status of BIM Adoption on Six Continents , 2015 .

[11]  Timothy O. Olawumi,et al.  Evolution in the intellectual structure of BIM research: a bibliometric analysis , 2017 .

[12]  J. Lainhart COBIT™: A Methodology for Managing and Controlling Information and Information Technology Risks and Vulnerabilities , 2000 .

[13]  Johnny Wong,et al.  Barriers to the integration of BIM and sustainability practices in construction projects: A Delphi survey of international experts , 2018, Journal of Building Engineering.

[14]  Ajla Aksamija,et al.  BIM-Based Building Performance Analysis: Evaluation and Simulation of Design Decisions , 2012 .

[15]  Tomo Cerovsek,et al.  Active process reuse model for collaboration , 2006, J. Inf. Technol. Constr..

[16]  Raja R. A. Issa,et al.  Synthesis of Existing BIM Maturity Toolsets to Evaluate Building Owners , 2013 .

[17]  Laura Álvarez Antón,et al.  Integration of LCA and BIM for Sustainable Construction , 2014 .

[18]  Jan A. van Lith,et al.  Assessing maturity development of purchasing management in construction , 2015 .

[19]  Jacky K.H. Chung,et al.  A Group Support System for improving value management studies in construction , 2004 .

[20]  Tak Wa Chan,et al.  Barriers of Implementing BIM in Construction Industry from the Designers' Perspective: A Hong Kong Experience , 2014 .

[21]  Fletcher Griffis,et al.  Automated Productivity-Based Schedule Animation: Simulation-Based Approach to Time-Cost Trade-Off Analysis , 2014 .

[22]  Daniel W.M. Chan,et al.  Critical success factors for implementing building information modeling and sustainability practices in construction projects: A Delphi survey , 2019, Sustainable Development.

[23]  Seung Wan Hong,et al.  Integrated system for BIM-based collaborative design , 2015 .

[24]  Roberto Cigolini,et al.  Linking product modularity to supply chain integration in the construction and shipbuilding industries , 2015 .

[25]  Peter E.D. Love,et al.  Building information modelling in construction: insights from collaboration and change management perspectives , 2018 .

[26]  Mohammed Arif,et al.  Measuring knowledge retention: a case study of a construction consultancy in the UAE , 2009 .

[27]  Ghassan Aouad,et al.  Editorial - Next generation construction IT: technology foresight, future studies, roadmapping and scenario planning , 2009, J. Inf. Technol. Constr..

[28]  Simon A. Austin,et al.  Applying future industrialised processes to construction , 2007 .

[29]  Eduardo Toledo Santos,et al.  The scenario and trends in the Brazilian IT construction applications' experience , 2007, J. Inf. Technol. Constr..

[30]  Yimin Zhu,et al.  Integration of Building Information Modeling and Economic and Environmental Impact Analysis to Support Sustainable Building Design , 2015 .

[31]  Glenn Ballard,et al.  Problems in the Interface Between Mechanical Design and Construction: A Research Proposal , 2001 .

[32]  Daniel M. Oppenheimer,et al.  Heuristics made easy: an effort-reduction framework. , 2008, Psychological bulletin.

[33]  Kenneth L. Kraemer,et al.  Information technology and economic performance , 2003, ACM Comput. Surv..

[34]  Charles M. Eastman,et al.  BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors , 2008 .

[35]  Hazar Dib,et al.  A measurement model of building information modelling maturity , 2014 .

[36]  Hs Jayasena,et al.  Assessing the BIM maturity in a BIM infant industry , 2013 .

[37]  Dominik Holzer,et al.  Rethinking the contractual context for Building Information Modelling (BIM) in the Australian built environment industry , 2013 .

[38]  A. C. C. Ezeabasili,et al.  Managing the Change Process Association with Building Information Modeling (BIM) Implementation by the Public and Private Investors in the Nigerian Building Industry , 2015 .

[39]  Abiola Akanmu,et al.  BIM-Based Decision Support System for Material Selection Based on Supplier Rating , 2015 .

[40]  Water Distribution Network Analysis of Bedesa Town, Damot Woyde Woreda of Wolaita Zone, Southern Ethiopia , 2017 .

[41]  Bamidele Temitope Arijeloye,et al.  Value Management – Creating Functional Value For Construction Project: An Exploratory Study , 2016 .

[42]  Joachim Blatter,et al.  Two or Three Approaches to Explanatory Case Study Research , 2012 .

[43]  Abdul-Mohsen Al-Hammad,et al.  Interface problems between building owners and designers , 1996 .

[44]  Awad S. Hanna,et al.  State of Practice of Building Information Modeling in the Mechanical Construction Industry , 2014 .

[45]  Kevin McCormack,et al.  The development of a supply chain management process maturity model using the concepts of business process orientation , 2004 .

[46]  Amin Hammad,et al.  Extending IFC to incorporate information of RFID tags attached to building elements , 2016, Adv. Eng. Informatics.

[47]  Chimay J. Anumba,et al.  A road-map to personalized context-aware services delivery in construction , 2009, J. Inf. Technol. Constr..

[48]  Abdul-Mohsen Al-Hammad Common Interface Problems among Various Construction Parties , 2000 .

[49]  Ardeshir Mahdavi,et al.  Requirement specification and prototyping for user interfaces of buildings' environmental controls , 2009, J. Inf. Technol. Constr..

[50]  Willy Sher,et al.  Measuring BIM performance: Five metrics , 2012 .

[51]  Deji Rufus Ogunsemi,et al.  Demystifying Issues Regarding Public Private Partnerships (PPP) , 2016 .

[52]  Timothy O. Olawumi,et al.  Identifying and prioritizing the benefits of integrating BIM and sustainability practices in construction projects: A Delphi survey of international experts , 2018, Sustainable Cities and Society.

[53]  Karen Kensek Building Information Modeling , 2014 .

[54]  Yvan J. Beliveau,et al.  Object Model Framework for Interface Modeling and IT-Oriented Interface Management , 2010 .

[55]  Ajibade Ayodeji Aibinu,et al.  Status of BIM Adoption and the BIM Experience of Cost Consultants in Australia , 2014 .

[56]  Nashwan Dawood,et al.  VR-roadmap: a vision for 2030 in the built environment , 2009, J. Inf. Technol. Constr..

[57]  Amin Hammad,et al.  Lifecycle management of facilities components using radio frequency identification and building information model , 2009, J. Inf. Technol. Constr..

[58]  Willy Sher,et al.  An integrated approach to BIM competency assessment, acquisition and application , 2013 .

[59]  Olawumi Timothy Oluwatosin,et al.  Are Quantity Surveyors Competent to Value for Civil Engineering Works? Evaluating QSs' Competencies and Militating Factors , 2016 .

[60]  Tamera L. McCuen,et al.  Evaluating Award-Winning BIM Projects Using the National Building Information Model Standard Capability Maturity Model , 2012 .

[61]  Kalyan Vaidyanathan,et al.  CONSTRUCTION SUPPLY CHAIN MATURITY MODEL - CONCEPTUAL FRAMEWORK , 2007 .

[62]  Puyan Abolghasemzadeh,et al.  A comprehensive method for environmentally sensitive and behavioral microscopic egress analysis in case of fire in buildings , 2013 .

[63]  Alastair Watson,et al.  Digital buildings - Challenges and opportunities , 2011, Adv. Eng. Informatics.

[64]  David J. Edwards,et al.  Conceptualising the FinDD API plug-in: A study of BIM-FM integration , 2017 .

[65]  Mustafa Alshawi,et al.  Exploring how information exchanges can be enhanced through cloud BIM , 2012 .

[66]  Xiangyu Wang,et al.  An explanatory case study on cloud computing applications in the built environment , 2014 .

[67]  Raja R. A. Issa,et al.  Framework for Evaluating the BIM Competencies of Facility Owners , 2016 .

[68]  Deborah J. Nightingale,et al.  Development of a Lean Enterprise Transformation Maturity Model , 2002, Inf. Knowl. Syst. Manag..

[69]  Vacharapoom Benjaoran A cost control system development: A collaborative approach for small and medium-sized contractors , 2009 .

[70]  Syed Hasnain Alam Kazmi,et al.  Innovation in Education - Inclusion of 3D-Printing Technology in Modern Education System of Pakistan: Case from Pakistani Educational Institutes , 2016 .

[71]  Gillian Frances Menzies,et al.  Life-Cycle Assessment and the Environmental Impact of Buildings: A Review , 2009 .

[72]  M. Abubakar,et al.  Contractors Perception of the Factors Affecting Building Information Modelling (BIM) Adoption in the Nigerian Construction Industry , 2014 .

[73]  Ardeshir Mahdavi,et al.  SEMPER-II: an internet-based multi-domain building performance simulation environment for early design support , 2004 .

[74]  Joseph A. Maxwell,et al.  Qualitative Research Design: An Interactive Approach , 1996 .

[75]  Lukumon O. Oyedele,et al.  Design for Deconstruction (DfD): Critical success factors for diverting end-of-life waste from landfills. , 2017, Waste management.

[76]  C. William Ibbs,et al.  PROJECT MANAGEMENT PROCESS MATURITY (PM)2 MODEL , 2002 .

[77]  Niraj Thurairajah,et al.  BIM and conceptual design sustainability analysis: An information categorization framework. , 2014 .

[78]  Bilal Succar,et al.  Building information modelling framework: A research and delivery foundation for industry stakeholders , 2009 .

[79]  Yong K. Cho,et al.  Case Study of BIM and Cloud–Enabled Real-Time RFID Indoor Localization for Construction Management Applications , 2016 .

[80]  Marzia Bolpagni,et al.  The implementation of BIM within the public procurement: A model-based approach for the construction industry , 2013 .

[81]  J. Maxwell,et al.  Qualitative Research Design , 2015 .

[82]  Robin Drogemuller,et al.  The impact of building information modelling (BIM) maturity and experience on contractor absorptive capacity , 2018 .