Comparison study of various factors affecting end-to-end delay in IEC 61850 substation communications using OPNET
暂无分享,去创建一个
[1] T.S. Sidhu,et al. Control and automation of power system substation using IEC61850 communication , 2005, Proceedings of 2005 IEEE Conference on Control Applications, 2005. CCA 2005..
[2] H. Hoang,et al. Real-time communication for industrial embedded systems using switched Ethernet , 2004, 18th International Parallel and Distributed Processing Symposium, 2004. Proceedings..
[3] T.S. Sidhu,et al. IED modelling for IEC61850 based substation automation system performance simulation , 2006, 2006 IEEE Power Engineering Society General Meeting.
[4] Wang Haizhu,et al. Analysis of realtime performances of process-level networks based on IEC61850 SCSM Model , 2011, 2011 4th International Conference on Electric Utility Deregulation and Restructuring and Power Technologies (DRPT).
[5] T S Sidhu,et al. Performance of IEC 61850-9-2 Process Bus and Corrective Measure for Digital Relaying , 2011, IEEE Transactions on Power Delivery.
[6] Yin Xianggen. RESEARCH ON SUBSTATION SECONDARY CIRCUIT COMMUNICATION SYSTEM USING OPNET SIMULATOR , 2005 .
[7] A. Kalam,et al. The Real-Time Publisher/Subscriber Communication Model for Distributed Substation Systems , 2007, IEEE Transactions on Power Delivery.
[8] T. Skeie,et al. Ethernet in substation automation , 2002 .
[9] Xu Kelai. The Simulation of Substation Communication Network Based on IEC 61850-9-2 , 2010 .