Imperfect economic production quantity model with upstream trade credit periods linked to raw material order quantity and downstream trade credit periods

[1]  S. Goyal Economic Order Quantity under Conditions of Permissible Delay in Payments , 1985 .

[2]  S. K. Goyal On “Economic Order Quantity under Conditions of Permissible Delay in Payments” by Goyal: Reply , 1985 .

[3]  A. Mehrez,et al.  Optimal inventory policy under different supplier credit policies , 1996 .

[4]  Hark Hwang,et al.  Retailer's pricing and lot sizing policy for exponentially deteriorating products under the condition of permissible delay in payments , 1997, Comput. Oper. Res..

[5]  B. Sarker,et al.  Optimal payment time for a retailer under permitted delay of payment by the wholesaler , 2000 .

[6]  Y.-F. Huang,et al.  Optimal retailer's ordering policies in the EOQ model under trade credit financing , 2003, J. Oper. Res. Soc..

[7]  Kun-Jen Chung,et al.  The optimal cycle time for EPQ inventory model under permissible delay in payments , 2003 .

[8]  Kun-Jen Chung,et al.  Lot-sizing decisions under trade credit depending on the ordering quantity , 2004, Comput. Oper. Res..

[9]  Chun-Tao Chang An EOQ model with deteriorating items under inflation when supplier credits linked to order quantity , 2004 .

[10]  Liang-Yuh Ouyang,et al.  A study on an inventory model for non-instantaneous deteriorating items with permissible delay in payments , 2006, Comput. Ind. Eng..

[11]  I. Osman,et al.  Coordinating a three-level supply chain with price discounts, price dependent demand, and profit sharing , 2006 .

[12]  Yung-Fu Huang,et al.  Economic order quantity under conditionally permissible delay in payments , 2007, Eur. J. Oper. Res..

[13]  Jui‐Jung Liao ON AN EPQ MODEL FOR DETERIORATING ITEMS UNDER PERMISSIBLE DELAY IN PAYMENTS , 2007 .

[14]  Yung-Fu Huang,et al.  Optimal retailer's replenishment decisions in the EPQ model under two levels of trade credit policy , 2007, Eur. J. Oper. Res..

[15]  S. K. Goyal,et al.  Retailer's optimal replenishment decisions with credit-linked demand under permissible delay in payments , 2008, Eur. J. Oper. Res..

[16]  S. T. A. Niaki,et al.  An Economic Order Quantity Under Joint Replenishment Policy to Supply Expensive Imported Raw Materials with Payment in Advance , 2008 .

[17]  Jui‐Jung Liao An EOQ model with noninstantaneous receipt and exponentially deteriorating items under two-level trade credit , 2008 .

[18]  Hardik N. Soni,et al.  Optimal ordering policy for stock-dependent demand under progressive payment scheme , 2008, Eur. J. Oper. Res..

[19]  S. Goyal,et al.  Coordinating a three-level supply chain with multiple suppliers, a vendor and multiple buyers , 2008 .

[20]  Leopoldo Eduardo Cárdenas-Barrón,et al.  Economic production quantity with rework process at a single-stage manufacturing system with planned backorders , 2009, Comput. Ind. Eng..

[21]  Jinn-Tsair Teng,et al.  An economic order quantity model for deteriorating items with partially permissible delay in payments linked to order quantity , 2009, Eur. J. Oper. Res..

[22]  Kun-Jen Chung,et al.  An ordering policy with allowable shortage and permissible delay in payments , 2009 .

[23]  Jinn-Tsair Teng,et al.  Optimal manufacturer's replenishment policies in the EPQ model under two levels of trade credit policy , 2009, Eur. J. Oper. Res..

[24]  Kun-Jen Chung An accurate and reliable solution procedure for the EOQ model with deteriorating items under supplier credits linked to the ordering quantity , 2009, Comput. Ind. Eng..

[25]  Jinn-Tsair Teng,et al.  Optimal ordering policies for deteriorating items using a discounted cash-flow analysis when a trade credit is linked to order quantity , 2010, Comput. Ind. Eng..

[26]  Maw-Sheng Chern,et al.  Optimal manufacturer’s replenishment policies for deteriorating items in a supply chain with up-stream and down-stream trade credits , 2010 .

[27]  Dongyi Liu,et al.  Optimal replenishment policy for the EPQ model with permissible delay in payments and allowable shortages , 2010 .

[28]  Yuan-Shyi Peter Chiu,et al.  A note on "Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns" , 2007, Eur. J. Oper. Res..

[29]  S. Goyal,et al.  Optimal replenishment policies for non-instantaneous deteriorating items with stock-dependent demand , 2010 .

[30]  Chia-Huei Ho,et al.  The optimal integrated inventory policy with price-and-credit-linked demand under two-level trade credit , 2011, Comput. Ind. Eng..

[31]  Victor B. Kreng,et al.  Optimal replenishment decision in an EPQ model with defective items under supply chain trade credit policy , 2011, Expert Syst. Appl..

[32]  R. Uthayakumar,et al.  Analysis of partial trade credit financing in a supply chain by EOQ-based model for decaying items with shortages , 2012 .

[33]  L. Cárdenas-Barrón,et al.  Multi products single machine EPQ model with immediate rework process , 2012 .

[34]  Chia-Hsien Su Optimal replenishment policy for an integrated inventory system with defective items and allowable shortage under trade credit , 2012 .

[35]  Gour Chandra Mahata,et al.  An EPQ-based inventory model for exponentially deteriorating items under retailer partial trade credit policy in supply chain , 2012, Expert Syst. Appl..

[36]  Yu-Jen Lin,et al.  A joint optimal ordering and delivery policy for an integrated supplier-retailer inventory model with trade credit and defective items , 2012, Appl. Math. Comput..

[37]  A. Thangam Optimal price discounting and lot-sizing policies for perishable items in a supply chain under advance payment scheme and two-echelon trade credits , 2012 .

[38]  Lu Wang,et al.  Optimal lot-sizing policy for a manufacturer with defective items in a supply chain with up-stream and down-stream trade credits , 2013, Comput. Ind. Eng..

[39]  L. Ouyang,et al.  Retailer’s optimal order and credit policies when a supplier offers either a cash discount or a delay payment linked to order quantity , 2013 .

[40]  L. Cárdenas-Barrón,et al.  An EOQ model for perishable product with special sale and shortage , 2013 .

[41]  Maw-Sheng Chern,et al.  AN INVENTORY MODEL FOR INCREASING DEMAND UNDER TWO LEVELS OF TRADE CREDIT LINKED TO ORDER QUANTITY , 2013 .

[42]  Ata Allah Taleizadeh,et al.  An imperfect multi-product production system with rework , 2013 .

[43]  Barun Das,et al.  Integrated supply chain model for a deteriorating item with procurement cost dependent credit period , 2013, Comput. Ind. Eng..

[44]  Leopoldo Eduardo Cárdenas-Barrón,et al.  A comprehensive extension of the optimal replenishment decisions under two levels of trade credit policy depending on the order quantity , 2013, Appl. Math. Comput..

[45]  Chandra K. Jaggi,et al.  Credit financing in economic ordering policies for defective items with allowable shortages , 2013, Appl. Math. Comput..

[46]  Hardik N. Soni Optimal replenishment policies for non-instantaneous deteriorating items with price and stock sensitive demand under permissible delay in payment , 2013 .

[47]  L. Ouyang,et al.  Optimal production lot with imperfect production process under permissible delay in payments and complete backlogging , 2013 .

[48]  D. W. Pentico,et al.  An EOQ model with partial delayed payment and partial backordering , 2013 .

[49]  Kun-Jen Chung The EOQ model with defective items and partially permissible delay in payments linked to order quantity derived analytically in the supply chain management , 2013 .

[50]  Hairong Feng,et al.  Retailer’s optimal replenishment and payment policies in the EPQ model under cash discount and two-level trade credit policy , 2013 .

[51]  Mohamad Y. Jaber,et al.  A joint model for cash and inventory management for a retailer under delay in payments , 2013, Comput. Ind. Eng..

[52]  A. Taleizadeh An economic order quantity model for deteriorating item in a purchasing system with multiple prepayments , 2014 .

[53]  Mohamad Y. Jaber,et al.  Vendor Managed Inventory (VMI) with Consignment Stock (CS) agreement for a two-level supply chain with an imperfect production process with/without restoration interruptions , 2014 .

[54]  Mohamad Y. Jaber,et al.  Coordinating a three-level supply chain with delay in payments and a discounted interest rate , 2014, Comput. Ind. Eng..

[55]  L. Cárdenas-Barrón,et al.  Retailer’s economic order quantity when the supplier offers conditionally permissible delay in payments link to order quantity , 2014 .

[56]  A. Taleizadeh An EOQ model with partial backordering and advance payments for an evaporating item , 2014 .

[57]  L. Ouyang,et al.  A note on “optimal replenishment policies for non-instantaneous deteriorating items with price and stock sensitive demand under permissible delay in payment” , 2014 .

[58]  Jinn-Tsair Teng,et al.  Economic production quantity models for deteriorating items with up-stream full trade credit and down-stream partial trade credit , 2014 .

[59]  Ata Allah Taleizadeh,et al.  A deterministic multi product single machine EPQ model with backordering, scraped products, rework and interruption in manufacturing process , 2014 .

[60]  Abolfazl Mirzazadeh,et al.  Optimal pricing and lot-sizing policies for an economic production quantity model with non-instantaneous deteriorating items, permissible delay in payments, customer returns, and inflation , 2014 .

[61]  Ata Allah Taleizadeh,et al.  An inventory control problem for deteriorating items with back-ordering and financial considerations , 2014 .

[62]  Leopoldo Eduardo Cárdenas-Barrón,et al.  Retailer's decision for ordering and credit policies for deteriorating items when a supplier offers order-linked credit period or cash discount , 2015, Appl. Math. Comput..

[63]  Ata Allah Taleizadeh,et al.  A lot-sizing model with backordering under hybrid linked-to-order multiple advance payments and delayed payment , 2015 .

[64]  A. Taleizadeh,et al.  An inventory control problem for deteriorating items with back-ordering and financial considerations under two levels of trade credit linked to order quantity , 2015 .

[65]  Ata Allah Taleizadeh,et al.  Partial up-stream advanced payment and partial down-stream delayed payment in a three-level supply chain , 2016, Ann. Oper. Res..