Discharge voltage prediction of complex gaps for helicopter live-line work: An approach and its application

Abstract Complex gap discharge voltage is an important parameter to determine the approach path and the minimum air insulation distance for helicopter live-line work (HLLW) by platform method. This paper proposes a novel approach for discharge voltage prediction of complex gaps with a floating object, combining electric field calculation, feature extraction, machine learning and intelligent prediction based on support vector machine (SVM). The methodology is performed by twice electric field calculations and SVM predictions to obtain the withstand voltages of the primary gap and the secondary gap, thus to compute the dielectric strength of the complex gap. A simulation model of the HLLW platform near the 1000 kV UHV AC transmission line is presented for electric field calculations, and some electric field features (EFF) are extracted from the calculation results to parameterize the complex gap configuration. Taking the EFF as input variables, a SVM model is applied to predict the switching impulse discharge voltages of different gap configurations relevant to HLLW. The validity of the proposed methodology is demonstrated through comparison with the experimental results. This study offers a possible way to determine the minimum safe gap distance for HLLW by numerical calculation rather than costly and time-consuming experiments.

[1]  Shengwen Shu,et al.  A prediction method for breakdown voltage of typical air gaps based on electric field features and support vector machine , 2015, IEEE Transactions on Dielectrics and Electrical Insulation.

[2]  Wenjie Xu,et al.  A method for breakdown voltage prediction of short air gaps with atypical electrodes , 2016, IEEE Transactions on Dielectrics and Electrical Insulation.

[3]  Cheng Zheng Experimental Study on the Discharge Processes of Rod-rod Air Gap Under Switching Impulse Voltage , 2012 .

[4]  Lin Zhang,et al.  The effect of floating-potential conductors on the electric field near overhead transmission lines , 2012 .

[5]  Ieee Task Force Recommended Practices for Helicopter Bonding Procedures for Live-Line Work , 2000 .

[6]  A Beroual,et al.  Discharge in Long Air Gaps Modelling and applications , 2016 .

[7]  Chao Liu,et al.  Research on Helicopter Live-Line Work by Platform Method on 1000 kV UHV AC Transmission Lines , 2015, IEEE Transactions on Magnetics.

[8]  Weijiang Chen,et al.  Research and application of UHV power transmission in China , 2018 .

[9]  S. Ashidate,et al.  Development of a Helicopter-Mounted Eye-Safe Laser Radar System for Distance Measurement between Power Transmission Lines and Nearby Trees , 2001, IEEE Power Engineering Review.

[10]  J. Ruan,et al.  Electric Field Features and Its Application for Air Gap Breakdown Voltage Prediction , 2017 .

[11]  G. W. Cameron,et al.  Incomplete Faraday cage effect of helicopters used in platform live-line maintenance , 1998 .

[12]  Shengwen Shu,et al.  Hybrid prediction of the power frequency breakdown voltage of short air gaps based on orthogonal design and support vector machine , 2016, IEEE Transactions on Dielectrics and Electrical Insulation.

[13]  Liming Wang,et al.  Electrostatic discharge effect on safe distance determination for 500 kV ac power line's helicopter inspection☆ , 2013 .

[14]  Du Yon Experimental Research for Safe Gap Distance of Helicopter Live Working with Platform Method on UHV AC Transmission Line , 2015 .

[15]  Chih-Jen Lin,et al.  LIBSVM: A library for support vector machines , 2011, TIST.

[16]  F.A.M. Rizk,et al.  Effect of floating conducting objects on critical switching impulse breakdown of air insulation , 1995 .

[18]  Zeng Ron,et al.  Challenges and Achievement in Long Air Gap Discharge Research , 2014 .

[19]  Rong Zeng,et al.  The Optimization of Entering Route for Live Working on 750 kV Transmission Towers by Space Electric-Field Analysis , 2010, IEEE Transactions on Power Delivery.

[20]  Luigi Paris Influence of Air Gap Characteristics on Line-to-Ground Switching Surge Strength , 1967 .

[21]  M.F. McGranaghan,et al.  Control of line-to-line overvoltages for helicopter-based live work on a 500 kV transmission line , 2008, 2008 IEEE Power and Energy Society General Meeting - Conversion and Delivery of Electrical Energy in the 21st Century.

[22]  Tian Wu,et al.  Experimental study on minimum approach distances and complex gaps for helicopter live-line work on 1000kV transmission line , 2016 .

[23]  Tian Wu,et al.  Research on Complex Gap Discharge Model of Live Working on EHV and UHV High-Voltage Transmission Lines , 2014, Canadian Journal of Electrical and Computer Engineering.

[24]  Chao Liu,et al.  Helicopter Live-Line Work on 1000-kV UHV Transmission Lines , 2016, IEEE Transactions on Power Delivery.