A typology for clients' multi‐project environments

Construction management research and practice is dominated by a single project paradigm. This does not reflect the true nature of many construction clients who have large multi‐project portfolios. Traditional single project management strategies are usually adopted for managing such portfolios – with limited success. The literature suggests that programmes, within portfolios, require different forms of management in order to optimize project delivery. In order to better understand these portfolios and thereby allow the exploration of new forms of management, a typology has been developed mapping out the various features of client's construction portfolios. The resultant typology provides a simple method for identifying the programme composition of a portfolio, highlighting the expected features of each programme type, and thereby directing management attention to the main aspects of each programme that can be optimized for efficiency. Six cases of client's construction project portfolios were studied using a highly structured, replication logic, case study methodology. A typology of clients' multi‐project environments was developed and validated through literal and theoretical replication between cases. Three main types emerged as descriptive of programmes within client's construction portfolios: bounded programmes, target programmes and rolling programmes. The distinctive features of each type suggest that programme‐specific approaches may be necessary for the successful delivery of projects within client's construction portfolios.

[1]  Aminatuzuhariah M. Abdullah,et al.  THE EXTENT OF MULTI-PROJECT MANAGEMENT IMPLEMENTATION IN THE UK CONSTRUCTION INDUSTRY , 2000 .

[2]  Sergio Pellegrinelli,et al.  Programme management: organising project-based change , 1997 .

[3]  R. Gareis Management by projects: the management strategy of the ‘new’ project-oriented company☆ , 1991 .

[4]  Huan Neng Chiu,et al.  Two heuristics for scheduling multiple projects with resource constraints , 1996 .

[5]  Roderic J. Gray Alternative approaches to programme management , 1997 .

[6]  Jack R. Meredith,et al.  Project Management: A Managerial Approach , 1989 .

[7]  R Davidhizar,et al.  Managing multiple projects. , 1994, Today's OR nurse.

[8]  David Partington Project management (6th edn) , 1997 .

[9]  K. Eisenhardt Building theories from case study research , 1989, STUDI ORGANIZZATIVI.

[10]  D. Ferns,et al.  Developments in programme management , 1991 .

[11]  Paul C. van Fenema,et al.  A typology of project management: emergence and evolution of new forms , 1999 .

[12]  Fereidoun Ghasemzadeh,et al.  An integrated framework for project portfolio selection , 1999 .

[13]  Paul. Olomolaiye,et al.  An evaluation of the project needs of UK building clients , 1998 .

[14]  J. Rodney Turner,et al.  The handbook of project-based management : improving the processes for achieving strategic objectives , 1998 .

[15]  D. Partington The project management of organizational change , 1996 .

[16]  William McElroy,et al.  Implementing strategic change through projects , 1996 .

[17]  Russell D. Archibald,et al.  Managing high-technology programs and projects , 1976 .

[18]  Peter W. G. Morris,et al.  The Anatomy of Major Projects , 1987 .

[19]  J. R. Turner,et al.  Programme management and its information systems requirements , 1992 .

[20]  Ralph Levene,et al.  Controlling the work scope in organisational transformation: a programme management approach , 1996 .

[21]  Pernille Eskerod,et al.  Meaning and action in a multi-project environment. Understanding a multi-project environment by means of metaphors and basic assumptions , 1996 .

[22]  Geoff Reiss Programme management demystified : managing multiple projects successfully , 1996 .

[23]  Ernest W. Parti,et al.  Issues in Pursuing Quality in Facility Program Development , 1996 .

[24]  Paul. Olomolaiye,et al.  A needs-based methodology for classifying construction clients and selecting contractors , 1998 .

[25]  R. Yin Case Study Research: Design and Methods , 1984 .

[26]  John H Payne,et al.  Management of multiple simultaneous projects: a state-of-the-art review , 1995 .

[27]  Alan Griffith,et al.  Developing an effective approach to the procurement and management of small building works within large client organizations , 1995 .

[28]  P. Olomolaiye,et al.  An evaluation of clients' needs and responsibilities in the construction process , 1995 .

[29]  Neoklis G. Blismas Multi project environments of construction clients , 2001 .

[30]  Terry Williams,et al.  The Need for New Paradigms for Complex Projects , 1999 .

[31]  Alan Bryman,et al.  Research Methods and Organization Studies , 1989 .

[32]  Kenneth King Humphreys,et al.  Control and Management of Capital Projects , 1965 .

[33]  Mariano Corso,et al.  A multi-project management framework for new product development , 1994 .