Delay resistant timetabling
暂无分享,去创建一个
[1] Rolf H. Möhring,et al. The Modeling Power of the Periodic Event Scheduling Problem: Railway Timetables - and Beyond , 2004, ATMOS.
[2] Richard M. Van Slyke,et al. Letter to the Editor---Monte Carlo Methods and the PERT Problem , 1963 .
[3] Rolf H. Möhring,et al. A Computational Study on Bounding the Makespan Distribution in Stochastic Project Networks , 2001, Ann. Oper. Res..
[4] Leo G. Kroon,et al. Cyclic Railway Timetabling: A Stochastic Optimization Approach , 2004, ATMOS.
[5] Sebastian Stiller,et al. TOPSU - RDM a simulation platform for online railway delay management , 2008, Simutools 2008.
[6] Leon Peeters,et al. The Computational Complexity of Delay Management , 2005, WG.
[7] Mark Hickman,et al. Computer-aided Systems in Public Transport , 2008 .
[8] Alexander Shapiro,et al. On Complexity of Stochastic Programming Problems , 2005 .
[9] Christian Liebchen,et al. Performance of Algorithms for Periodic Timetable Optimization , 2008 .
[10] Jane N. Hagstrom,et al. Computing the probability distribution of project duration in a PERT network , 1990, Networks.
[11] Melvyn Sim,et al. Robust discrete optimization and network flows , 2003, Math. Program..
[12] Leo Kroon,et al. Algorithmic Methods for Railway Optimization, International Dagstuhl Workshop, Dagstuhl Castle, Germany, June 20-25, 2004, 4th International Workshop, ATMOS 2004, Bergen, Norway, September 16-17, 2004, Revised Selected Papers , 2007, ATMOS.