Resource-constrained project scheduling through the goal programming model: integration of the manager's preferences
暂无分享,去创建一个
[1] F. Brian Talbot,et al. Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case , 1982 .
[2] Sabah U. Randhawa,et al. Resource-constrained project scheduling with renewable and non-renewable resources and time-resource tradeoffs , 1997 .
[3] Xavier Gandibleux,et al. A survey and annotated bibliography of multiobjective combinatorial optimization , 2000, OR Spectr..
[4] Matthew J. Liberatore,et al. Project Management Software Usage Patterns and Suggested Research Directions for Future Developments , 1998 .
[5] William B. Widhelm. Extensions of goal programming models , 1981 .
[6] Mehrdad Tamiz,et al. Goal programming for decision making: An overview of the current state-of-the-art , 1998, Eur. J. Oper. Res..
[7] B. Jaumard,et al. A multi-criteria tabu search approach to cell formation problems in group technology with multiple objectives , 1994 .
[8] Laurence J. Moore,et al. Analysis of a multi-criteria project crashing model , 1978 .
[9] Belaïd Aouni,et al. Goal programming model: A glorious history and a promising future , 2001, Eur. J. Oper. Res..
[10] Antonie Stam,et al. Resource constrained project scheduling with multiple objectives: A decision support approach , 1992, Comput. Oper. Res..
[11] Rainer Kolisch. Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation , 1994 .
[12] Jean-Marc Martel,et al. Incorporating the Decision-maker's Preferences in the Goal-programming Model , 1990 .
[13] Hokey Min,et al. On the Origin and Persistence of Misconceptions in Goal Programming , 1991 .
[14] A. Charnes,et al. Goal programming and multiple objective optimizations: Part 1 , 1977 .
[15] James H. Patterson,et al. An Efficient Integer Programming Algorithm with Network Cuts for Solving Resource-Constrained Scheduling Problems , 1978 .
[16] Edward L. Hannan,et al. The application of goal programming techniques to the CPM problem , 1978 .
[17] A Baykasoǧlu,et al. Goal programming using multiple objective tabu search , 2001, J. Oper. Res. Soc..
[18] Mohamed Haouari,et al. A bi-objective model for robust resource-constrained project scheduling , 2005 .
[19] Andrzej Jaszkiewicz,et al. Interactive analysis of multiple-criteria project scheduling problems , 1998, Eur. J. Oper. Res..
[20] Jsh Kornbluth,et al. A survey of goal programming , 1973 .
[21] James P. Ignizio,et al. A Review of Goal Programming: A Tool for Multiobjective Analysis , 1978 .
[22] Mehrdad Tamiz,et al. A review of Goal Programming and its applications , 1995, Ann. Oper. Res..
[23] Lixin Tang,et al. A review of planning and scheduling systems and methods for integrated steel production , 2001, Eur. J. Oper. Res..
[24] Rosa Blanco,et al. Theoretical and practical fundamentals for multi-objective optimisation in resource-constrained project scheduling problems , 2011, Comput. Oper. Res..
[25] J. Wayne Spence,et al. Tools of the Trade: A Survey of Project Management Tools , 1998 .
[26] Hadi Gökçen,et al. A goal programming approach to mixed-model assembly line balancing problem , 1997 .
[27] R. Słowiński. Multiobjective network scheduling with efficient use of renewable and nonrenewable resources , 1981 .
[28] Abraham Charnes,et al. Optimal Estimation of Executive Compensation by Linear Programming , 1955 .
[29] F. F. Boctor. Heuristics for scheduling projects with resource restrictions and several resource-duration modes , 1993 .
[30] W Thomas Lin,et al. A survey of goal programming applications , 1980 .
[31] R. P. Mohanty,et al. Multiple projects -- Multiple resources constrained scheduling: A multiobjective analysis , 1989 .
[32] Rainer Kolisch,et al. Experimental investigation of heuristics for resource-constrained project scheduling: An update , 2006, Eur. J. Oper. Res..
[33] Matthew J. Liberatore,et al. Incorporating Quality Considerations Into Project Time/Cost Tradeoff Analysis and Decision Making , 2006, IEEE Transactions on Engineering Management.
[34] Ralph E. Steuer,et al. An interactive weighted Tchebycheff procedure for multiple objective programming , 1983, Math. Program..
[35] Gündüz Ulusoy,et al. A framework for an interactive project scheduling system under limited resources , 1996 .
[36] Jorge Pinho de Sousa,et al. Using metaheuristics in multiobjective resource constrained project scheduling , 2000, Eur. J. Oper. Res..
[37] Mario T. Tabucanon,et al. A multiple-criteria approach to machine selection for flexible manufacturing systems , 1994 .