A Review of Real Time Railway Traffic Management During Disturbances

This paper gives an over view of real time traffic management of the railway network in case of disturbances. After briefly introducing the problem of disturbance management and basic mathematical formulations, this paper overviews the existing literatures according to the typologies of traffic and levels of detail in the infrastructure models used for railway traffic network representation. A precise placement is made based on the effect of management decisions towards the various stakeholders. The application of these models in real life railway system is discussed based on the special constraints considered, the size of the railway network and the calculation time. Most railway disturbance management models are tested in an experiment setting at present, and if applied in practice they can be helpful to dispatchers to provide a higher quality service for all stakeholders involved.

[1]  E. Schnieder,et al.  Automated Dispatching Of Train OperationsUsing Genetic Algorithms , 2004 .

[2]  Dario Pacciarelli,et al.  Rescheduling Railway Traffic Taking into Account Minimization of Passengers' Discomfort , 2015, ICCL.

[3]  Andrea D'Ariano,et al.  Improving real-time train dispatching: Models, algorithms and applications , 2008 .

[4]  Dario Pacciarelli,et al.  Optimal multi-class rescheduling of railway traffic , 2011, J. Rail Transp. Plan. Manag..

[5]  Dominique Feillet,et al.  A MIP-based local search method for the railway rescheduling problem , 2011, Networks.

[6]  Sebastian Stiller,et al.  Computing delay resistant railway timetables , 2010, Comput. Oper. Res..

[7]  Dennis Huisman,et al.  Delay Management with Rerouting of Passengers , 2012, Transp. Sci..

[8]  Thijs Dewilde Improving the Robustness of a Railway System in Large and Complex Station Areas , 2014 .

[9]  Anita Schöbel,et al.  To Wait or Not to Wait? The Bicriteria Delay Management Problem in Public Transportation , 2007, Transp. Sci..

[10]  Norio Tomii,et al.  An optimal delay management algorithm from passengers' viewpoints considering the whole railway network , 2011, J. Rail Transp. Plan. Manag..

[11]  Dario Pacciarelli,et al.  Assessment of flexible timetables in real-time traffic management of a railway bottleneck , 2008 .

[12]  Patrick T. Harker,et al.  REAL-TIME SCHEDULING OF FREIGHT RAILROADS , 1995 .

[13]  T. T. Narendran,et al.  A heuristic for routing and scheduling freight trains in a passenger rail network , 2007 .

[14]  Thomas Albrecht,et al.  Applications of real-time speed control in rail-bound public transportation systems , 2013 .

[15]  Jan A. Persson,et al.  N-tracked railway traffic re-scheduling during disturbances , 2007 .

[16]  Marco Laumanns,et al.  A model predictive control approach for discrete-time rescheduling in complex central railway station areas , 2012, Comput. Oper. Res..

[17]  Selim Dündar,et al.  Train re-scheduling with genetic algorithms and artificial neural networks for single-track railways , 2013 .

[18]  Elise Miller-Hooks,et al.  Freight train scheduling with elastic demand , 2010 .

[19]  Dennis Huisman,et al.  Delay Management Including Capacities of Stations , 2015, Transp. Sci..

[20]  Dario Pacciarelli,et al.  Discrete Optimization A branch and bound algorithm for scheduling trains in a railway network , 2007 .

[21]  Joaquin Rodriguez,et al.  A constraint programming model for real-time train scheduling at junctions , 2007 .

[22]  Lucas P. Veelenturf,et al.  An overview of recovery models and algorithms for real-time railway rescheduling , 2014 .

[23]  Johanna Törnquist Krasemann Design of an Effective Algorithm for Fast Response to the Rescheduling of Railway Traffic During Disturbances , 2012 .

[24]  Dario Pacciarelli,et al.  Reordering and Local Rerouting Strategies to Manage Train Traffic in Real Time , 2008, Transp. Sci..

[25]  Matteo Fischetti,et al.  Modeling and Solving the Train Timetabling Problem , 2002, Oper. Res..

[26]  Jacek Blazewicz,et al.  The job shop scheduling problem: Conventional and new solution techniques , 1996 .

[27]  Anita Schöbel,et al.  Integer Programming Approaches for Solving the Delay Management Problem , 2004, ATMOS.

[28]  Dirk Cattrysse,et al.  Improving the robustness in railway station areas , 2014, Eur. J. Oper. Res..

[29]  Dario Pacciarelli,et al.  A tabu search algorithm for rerouting trains during rail operations , 2007 .

[30]  Dario Pacciarelli,et al.  Bi-objective conflict detection and resolution in railway traffic management , 2012 .

[31]  Dario Pacciarelli,et al.  Job-shop scheduling with blocking and no-wait constraints , 2002, Eur. J. Oper. Res..

[32]  Sebastian Stiller,et al.  Delay resistant timetabling , 2009, Public Transp..

[33]  Anita Schöbel,et al.  Capacity constraints in delay management , 2009, Public Transp..

[34]  Anita Schöbel,et al.  A Model for the Delay Management Problem based on Mixed-Integer-Programming , 2001, ATMOS.