Performance Measurement Framework for Prediction and Management of Construction Investments
暂无分享,去创建一个
[1] J. St-Pierre,et al. Performance measurement in new product development projects: findings from successful small and medium enterprises , 2023, International Journal of Project Management.
[2] Aki Jääskeläinen,et al. How performance measurement can support achieving success in project-based operations , 2023, International Journal of Project Management.
[3] M. Kozlovská,et al. Design of Economic Sustainability Supported by Enterprise Resource Planning Systems in Architecture, Engineering, and Construction , 2022, Buildings.
[4] I. Mrak,et al. A Holistic Approach to Strategic Sustainable Development of Urban Voids as Historic Urban Landscapes from the Perspective of Urban Resilience , 2022, Buildings.
[5] Ignacio Pavez,et al. Measuring project team performance: A review and conceptualization , 2022, International Journal of Project Management.
[6] O. Ejohwomu,et al. Using nudges to realize project performance management , 2022, International Journal of Project Management.
[7] T. Hanák,et al. PERFORMANCE MANAGEMENT IN CIVIL ENGINEERING: A SYSTEMATIC LITERATURE REVIEW , 2022, Elektronički časopis građevinskog fakulteta Osijek.
[8] Niksa Jajac,et al. Decision Support Systems for Managing Construction Projects: A Scientific Evolution Analysis , 2022, Sustainability.
[9] T. Hanák,et al. Performance Management in Czech Construction , 2022, Tehnički glasnik.
[10] T. Mandičák,et al. Supply Chain Management and Big Data Concept Effects on Economic Sustainability of Building Design and Project Planning , 2021, Applied Sciences.
[11] D. Boer,et al. Circular economy in the building and construction sector: A scientific evolution analysis , 2021 .
[12] M. Bosch-Rekveldt,et al. Breakdown of Engineering Projects’ Success Criteria , 2021 .
[13] V. Obradović,et al. Impact of Construction Project Managers’ Emotional Intelligence on Project Success , 2021, Sustainability.
[14] A. Klaus-Rosińska,et al. Stakeholder Management—One of the Clues of Sustainable Project Management—As an Underestimated Factor of Project Success in Small Construction Companies , 2021, Sustainability.
[15] Madjid Tavana,et al. An integrated rough group multicriteria decision-making model for the ex-ante prioritization of infrastructure projects: The Serbian Railways case , 2021, Socio-Economic Planning Sciences.
[16] R. Taherkhani,et al. A Systematic Analysis of Construction Performance Management: Key Performance Indicators from 2000 to 2020 , 2021, Iranian Journal of Science and Technology, Transactions of Civil Engineering.
[17] Andrea S. Patrucco,et al. Does relationship control hinder relationship commitment? The role of supplier performance measurement systems in construction infrastructure projects , 2021 .
[18] Ivan Marović,et al. A Multi-Criteria Decision Support Concept for Selecting the Optimal Contractor , 2021, Applied Sciences.
[19] Diana Car-Pušić,et al. Group decision-making in civil engineering based on AHP and PROMETHEE methods , 2020, Przegląd Naukowy Inżynieria i Kształtowanie Środowiska.
[20] Nabankur Mandal,et al. Performance evaluation of an insurance company using an integrated Balanced Scorecard (BSC) and Best-Worst Method (BWM) , 2020, Decision Making: Applications in Management and Engineering.
[21] K. Yildiz,et al. Innovative decision support model for construction supply chain performance management , 2020, Production Planning & Control.
[22] A. Cerić,et al. Trust in megaprojects: A comprehensive literature review of research trends , 2020 .
[23] Diana Car-Pušić,et al. Predicting buildings construction cost overruns on the basis of cost overruns structure , 2020 .
[24] Eirik Albrechtsen,et al. A comparative analysis of safety management and safety performance in twelve construction projects. , 2019, Journal of safety research.
[25] T. Cooke‐Davies,et al. A cross-national comparison of public project benefits management practices – the effectiveness of benefits management frameworks in application , 2019, Production Planning & Control.
[26] Ernest Effah Ameyaw,et al. Review of application of analytic hierarchy process (AHP) in construction , 2019 .
[27] Mark J S Keenan,et al. The impact of quality management systems on construction performance in the North West of England , 2019, International Journal of Construction Management.
[28] Silvana Petruseva,et al. Implementation of Process-Based and Data-Driven Models for Early Prediction of Construction Time , 2019, Advances in Civil Engineering.
[29] Diana Car-Pušić,et al. Impact of funding on cost-time aspects of public and social buildings , 2019, Journal of the Croatian Association of Civil Engineers.
[30] Andreas Wald,et al. Project complexity and team-level absorptive capacity as drivers of project management performance , 2018, International Journal of Project Management.
[31] X. Xue,et al. The evolution of stakeholder management practices in Australian mega construction projects , 2018, Engineering, Construction and Architectural Management.
[32] David Otley,et al. Reviewing and Theorizing the Unintended Consequences of Performance Management Systems , 2018, International Journal of Management Reviews.
[33] P. Zou,et al. Towards integrating construction risk management and stakeholder management: A systematic literature review and future research agendas , 2018, International Journal of Project Management.
[34] Shoujian Zhang,et al. Effect of stakeholder collaborative management on off-site construction cost performance , 2018 .
[35] Hee Sung Cha,et al. Measuring Project Performance in Consideration of Optimal Best Management Practices for Building Construction in South Korea , 2018 .
[36] Kumar Neeraj Jha,et al. An Empirical Study on Performance Measurement Factors for Construction Organizations , 2018 .
[37] Johan Larsson,et al. Managing complex projects in the infrastructure sector — A structural equation model for flexibility-focused project management , 2017 .
[38] Beliz Ozorhon,et al. Impact of integration management on construction project management performance , 2017 .
[39] Beliz Ozorhon,et al. Measuring Project Management Performance: Case of Construction Industry , 2017 .
[40] Begum Sertyesilisik,et al. A preliminary study on the regenerative construction project management concept for enhancing sustainability performance of the construction industry , 2017 .
[41] T. Hanák,et al. Data Flow in Relation to Life-Cycle Costing of Construction Projects in the Czech Republic , 2017 .
[42] Albert P.C. Chan,et al. A review of stakeholder management performance attributes in construction projects , 2017 .
[43] Veronica Soebarto,et al. Discovering the transition pathways toward sustainability for construction enterprises: importance-performance analysis , 2017 .
[44] Ibraheem Abd-Allah Aidan,et al. Forecasting the Cost of Structure of Infrastructure Projects Utilizing Artificial Neural Network Model (Highway Projects as Case Study) , 2017 .
[45] Per-Erik Josephson,et al. Aggregation of factors causing cost overruns and time delays in large public construction projects: Trends and implications , 2017 .
[46] Stephen O. Ogunlana,et al. Using structural equation modelling (SEM) to understand the relationships among critical success factors (CSFs) for stakeholder management in construction , 2017 .
[47] Yogesh Kumar Dwivedi,et al. Mapping IS failure factors on PRINCE2® stages: an application of Interpretive Ranking Process (IRP) , 2017, Production Planning & Control.
[48] Bhadra J. H. Arachchige,et al. Criteria for Construction Project Success: A Literature Review , 2016 .
[49] Aminah Robinson Fayek,et al. Modeling and evaluating construction project competencies and their relationship to project performance , 2016 .
[50] Michael Morley,et al. On temporary organizations: A review, synthesis and research agenda , 2016 .
[51] Terry Williams,et al. Identifying Success Factors in Construction Projects: A Case Study , 2016 .
[52] Hong Long Chen,et al. Performance measurement and the prediction of capital project failure , 2015 .
[53] Thomas Y. Choi,et al. Deep, Sticky, Transient, and Gracious: An Expanded Buyer–Supplier Relationship Typology , 2015 .
[54] Ivica Završki,et al. Ranking zones model – a multicriterial approach to the spatial management of urban areas , 2015 .
[55] Anita Cerić,et al. Minimizing communication risk in construction: a Delphi study of the key role of project managers , 2014 .
[56] Simaan M. AbouRizk,et al. Practical Application for Integrated Performance Measurement of Construction Projects , 2014 .
[57] J. Byrne,et al. The benefits of publishing systematic quantitative literature reviews for PhD candidates and other early-career researchers , 2014 .
[58] H. Chen. Innovation stimulants, innovation capacity, and the performance of capital projects , 2014 .
[59] K. Davis. Different stakeholder groups and their perceptions of project success , 2014 .
[60] N. Vajdic,et al. Use of key performance indicators for PPP transport projects to meet stakeholders’ performance objectives , 2013 .
[61] Mladen Radujković,et al. The balanced scorecard and EFQM working together in a performance management framework in construction industry , 2013 .
[62] Sathyanarayanan Rajendran,et al. Relationship between Construction Safety and Quality Performance , 2013 .
[63] Hans-Georg Gemünden,et al. Predicting Project Portfolio Success by Measuring Management Quality—A Longitudinal Study , 2013, IEEE Transactions on Engineering Management.
[64] Hemanta Doloi,et al. Cost Overruns and Failure in Project Management: Understanding the Roles of Key Stakeholders in Construction Projects , 2013 .
[65] Stephen G. MacDonell,et al. A Perspective-Based Understanding of Project Success , 2012, ArXiv.
[66] Rodney Turner,et al. Forecasting Success on Large Projects: Developing Reliable Scales to Predict Multiple Perspectives by Multiple Stakeholders over Multiple Time Frames , 2012 .
[67] Eddie W.L. Cheng,et al. Exploring the perceived influence of safety management practices on project performance in the construction industry , 2012 .
[68] Chan Kyu Kim,et al. Quantitative approach for project performance measurement on building construction in South Korea , 2011 .
[69] Tahir Çelik,et al. Performance Measurement in a Quality Management System , 2011 .
[70] Seon-Gyoo Kim,et al. Risk performance indexes and measurement systems for mega construction projects , 2010 .
[71] Geoffrey Qiping Shen,et al. Critical success factors for stakeholder management: Construction practitioners' perspectives , 2010 .
[72] Qi Wang,et al. Bi-Level Framework for Measuring Performance to Improve Productivity of Construction Enterprises , 2010 .
[73] Stephen O. Ogunlana,et al. Beyond the ‘iron triangle’: Stakeholder perception of key performance indicators (KPIs) for large-scale public sector development projects , 2010 .
[74] Ismail Rahmat,et al. The performance measurement of construction projects managed by ISO-certified contractors in Malaysia , 2010 .
[75] Lavagnon A. Ika. Project Success as a Topic in Project Management Journals , 2009 .
[76] Saumyendu Ghosh,et al. Determination of Key Performance Indicators with Enterprise Resource Planning Systems in Engineering Construction Firms , 2009 .
[77] Amin Akhavan Tabassi,et al. Training, motivation, and performance: The case of human resource management in construction projects in Mashhad, Iran , 2009 .
[78] A. Booth,et al. A typology of reviews: an analysis of 14 review types and associated methodologies. , 2009, Health information and libraries journal.
[79] Sui Pheng Low,et al. Models for Predicting Project Performance in China Using Project Management Practices Adopted by Foreign AEC Firms , 2008 .
[80] Christina M. Scott-Young,et al. Project success and project team management: Evidence from capital projects in the process industries , 2008 .
[81] Ludovic-Alexandre Vidal,et al. Understanding project complexity: implications on project management , 2008, Kybernetes.
[82] Aminah Robinson Fayek,et al. Initial metrics and pilot program results for measuring the performance of the Canadian construction industry , 2008 .
[83] Giulio Bottazzi,et al. Productivity, profitability and financial performance , 2008 .
[84] Farnad Nasirzadeh,et al. System dynamics approach for construction risk analysis , 2008 .
[85] Chris Chapman,et al. Stakeholders and uncertainty management in projects , 2008 .
[86] S. El-Sayegh. Risk assessment and allocation in the UAE construction industry , 2008 .
[87] Jason Seawright,et al. Case Selection Techniques in Case Study Research , 2008 .
[88] Hee-Sung Park,et al. Conceptual framework of construction productivity estimation , 2006 .
[89] Bent Flyvbjerg,et al. From Nobel Prize to Project Management: Getting Risks Right , 2006, ArXiv.
[90] D. Bryde,et al. Client versus contractor perspectives on project success criteria , 2005 .
[91] Albert P.C. Chan,et al. Key performance indicators for measuring construction success , 2004 .
[92] Andrew D.F. Price,et al. Performance Measurement in Construction , 2004 .
[93] David. Proverbs,et al. Factors influencing contractor performance: an international investigation , 2003 .
[94] Raja R. A. Issa,et al. Management’s Perception of Key Performance Indicators for Construction , 2003 .
[95] Erwin Danneels. The dynamics of product innovation and firm competences , 2002 .
[96] Albert P.C. Chan,et al. Framework of Success Criteria for Design/Build Projects , 2002 .
[97] Roger Miller,et al. Strategizing for anticipated risks and turbulence in large-scale engineering projects , 2001 .
[98] Ghassan Aouad,et al. Performance management in construction: a conceptual framework , 2001 .
[99] Roger Atkinson,et al. Project management: cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteria , 1999 .
[100] Imre Bernolak,et al. Effective measurement and successful elements of company productivity: The basis of competitiveness and world prosperity , 1997 .
[101] Ronald K. Mitchell,et al. Toward a Theory of Stakeholder Identification and Salience: Defining the Principle of who and What Really Counts , 1997 .
[102] Frank C. Harris,et al. Model for assessing building contractors' project performance , 1996 .
[103] Anton de Wit,et al. Measurement of project success , 1988 .
[104] Mohammad A. Hassanain,et al. A risk assessment approach for enhancing construction safety performance , 2020 .
[105] Maged Georgy,et al. System Dynamics Approach for Forecasting Performance of Construction Projects , 2018 .
[106] H. A. Rusdi,et al. Dynamic Modelling of the Relation between Bidding Strategy and Construction Project Performance , 2017 .
[107] M. Kunc,et al. Benefits Realisation Management and its influence on project success and on the execution of business strategies , 2015 .
[108] Julien Pollack,et al. Emergent Trends and Passing Fads in Project Management Research: A Scientometric Analysis of Changes in the Field , 2015 .
[109] Goran Cirovic,et al. A PRELIMINARY ESTIMATE OF TIME AND COST IN URBAN ROAD CONSTRUCTION USING NEURAL NETWORKS , 2013 .
[110] Harri Haapasalo,et al. Productivity and Performance Management – Managerial Practices in the Construction Industry , 2012 .
[111] David M. Miller. Profitability = productivity + price recovery , 2011 .
[112] Reza Baradaran Kazemzadeh,et al. PROMETHEE: A comprehensive literature review on methodologies and applications , 2010, Eur. J. Oper. Res..
[113] Mladen Radujković,et al. Application of key performance indicators in South‐Eastern European construction , 2010 .
[114] Ana B. Escrig-Tena,et al. An empirical assessment of the EFQM Excellence Model: Evaluation as a TQM framework relative to the MBNQA Model , 2009 .
[115] F. Ling,et al. Key project management practices affecting Singaporean firms’ project performance in China , 2009 .
[116] R. Edward Minchin,et al. Management of Construction Firm Performance Using Benchmarking , 2007 .
[117] Qiping Shen,et al. Measuring the performance of value management studies in construction : critical review , 2007 .
[118] Stefan Tangen,et al. Demystifying productivity and performance , 2005 .