How to develop a differentiated supply chain strategy

– The purpose of this paper is to contribute to the understanding of supply chain (SC) design and operation by investigating how two case companies have developed and deployed differentiated SC strategies. This study primarily focuses on the operating part of the differentiated SC strategy, that is, how different manufacturing strategies – such as make‐to‐stock, assembly‐to‐order, and make‐to‐order – are used in contemporary manufacturing related SCs. However, this study also includes elements concerning supply and distribution parts., – This study employs a descriptive multiple case study approach. The case organizations originate from Sweden, but they have significant international presence. Empirical data have been collected mainly from in‐depth interviews with key persons representing senior and middle management in the case companies., – This research shows how two case companies have developed and deployed a differentiated SC strategy. The case study findings reveal that both the case companies already are employing several manufacturing strategies and also combine these with different distribution strategies. Up to now, the supply part of the differentiated SC strategy has been neglected but probably will be incorporated in the near future. This implies that one efficient way to develop a differentiated SC strategy could be to combine different supply, manufacturing and distribution strategies into various SC solutions. By combining relatively few strategies, it is possible to develop several differentiated SC solutions., – The research work is limited to Swedish companies, however, the case companies are in top three in their respective industries measured by sales, which provides ground for the generalization of the research., – This paper gives an insight to managers and practitioners in how to develop and deploy a differentiated SC strategy., – Several studies have discussed the appropriate SC strategy issue but failed to address the need to utilize several SC solutions concurrently. However, this paper contributes by discussing how to develop and deploy a differentiated SC strategy and how to manage these multiple SCs.

[1]  Manoj Kumar Tiwari,et al.  Modeling the metrics of lean, agile and leagile supply chain: An ANP-based approach , 2006, Eur. J. Oper. Res..

[2]  Remko I. van Hoek,et al.  The thesis of leagility revisited , 2000 .

[3]  Jayashankar M. Swaminathan Enabling Customization Using Standardized Operations , 2001 .

[4]  R. Yin Case Study Research: Design and Methods , 1984 .

[5]  R. Shapiro,et al.  From supply chain to demand chain: the role of lead time reduction in improving demand chain performance , 2004 .

[6]  N. Denzin,et al.  Handbook of Qualitative Research , 1994 .

[7]  J. Mentzer,et al.  SUPPLY CHAIN MANAGEMENT: THE PURSUIT OF A CONSENSUS DEFINITION , 2005 .

[8]  Daniel T. Jones,et al.  The machine that changed the world : based on the Massachusetts Institute of Technology 5-million dollar 5-year study on the future of the automobile , 1990 .

[9]  Jan Olhager,et al.  Decoupling the Value Chain , 2006 .

[10]  Walter Zinn Developing Heuristics to Estimate the Impact of Postponement on Safety Stock , 1990 .

[11]  Jamshed J. Mistry,et al.  Supply Chain Management: A Case Study of an Integrated Lean and Agile Model , 2005 .

[12]  M. Christopher,et al.  CREATING AGILE SUPPLY CHAINS IN THE FASHION INDUSTRY , 2004 .

[13]  B. Kingsman,et al.  Competitive advantage, customisation and a new taxonomy for non make-to-stock companies , 1999 .

[14]  Donald J. Bowersox,et al.  Logistical Management: The Integrated Supply Chain Process , 1974 .

[15]  M. Christopher,et al.  Developing Market Specific Supply Chain Strategies , 2002 .

[16]  D. Towill,et al.  Engineering the leagile supply chain , 2000 .

[17]  L. P. Bucklin Postponement, Speculation and the Structure of Distribution Channels , 1965 .

[18]  Thomas J. Goldsby,et al.  The Manufacturing Flow Management Process , 2003 .

[19]  A. Fearne,et al.  Efficiency versus effectiveness in construction supply chains: the dangers of “lean” thinking in isolation , 2006 .

[20]  Jan Olhager,et al.  Strategic positioning of the order penetration point , 2003 .

[21]  D. Towill,et al.  Engineering supply chains to match customer requirements , 2000 .

[22]  R. Nagel,et al.  Agile Competitors and Virtual Organizations: Strategies for Enriching the Customer , 1994 .

[23]  R. V. Hoek,et al.  The rediscovery of postponement a literature review and directions for research , 2001 .

[24]  M. Fisher What is the Right Supply Chain for Your Product , 1997 .

[25]  R Stratton,et al.  Questioning the relentless shift to offshore manufacturing , 2002 .

[26]  Stanley E. Griffis,et al.  MODELING LEAN, AGILE, AND LEAGILE SUPPLY CHAIN STRATEGIES , 2006 .

[27]  N. D. Burns,et al.  Postponement: a review and an integrated framework , 2004 .

[28]  M. Cooper,et al.  Supply Chain Postponement and Speculation Strategies: How to choose the right strategy , 1998 .

[29]  Per Hilletofth,et al.  Supply chain management in fashion and textile industry , 2008 .

[30]  R. Shankar,et al.  Modeling agility of supply chain , 2007 .

[31]  Donald J. Bowersox,et al.  Materials Logistics Management , 1985 .

[32]  R. Warburton,et al.  The strategic integration of agile and lean supply , 2003 .

[33]  T. Bonoma Case Research in Marketing: Opportunities, Problems, and a Process , 1985 .

[34]  M. Christopher The Agile Supply Chain : Competing in Volatile Markets , 2000 .

[35]  M. Bruce,et al.  Lean or agile: A solution for supply chain management in the textiles and clothing industry? , 2004 .

[36]  A. Gunasekaran,et al.  Build‐to‐order supply chain management: a literature review and framework for development , 2005 .

[37]  Danny Berry,et al.  Leagility: Integrating the lean and agile manufacturing paradigms in the total supply chain , 1999 .

[38]  Matthias Holweg,et al.  The Second Century: Reconnecting Customer and Value Chain through Build-to-Order Moving beyond Mass and Lean Production in the Auto Industry , 2005 .

[39]  Denis Royston Towill,et al.  Total cycle time compression and the agile supply chain , 1999 .

[40]  Matthias Holweg,et al.  Towards responsive vehicle supply: a simulation-based investigation into automotive scheduling systems , 2005 .

[41]  M. Christopher,et al.  An Integrated Model for the Design of Agile Supply Chains. , 2001 .

[42]  M. Christopher,et al.  A taxonomy for selecting global supply chain strategies , 2006 .

[43]  Angappa Gunasekaran,et al.  AGILE MANUFACTURING: ENABLERS AND AN IMPLEMENTATION FRAMEWORK , 1998 .

[44]  W. Zinn,et al.  PLANNING PHYSICAL DISTRIBUTION WITH THE PRINCIPLE OF POSTPONEMENT , 1988 .

[45]  Taiichi Ohno,et al.  Toyota Production System : Beyond Large-Scale Production , 1988 .

[46]  T. Scandura,et al.  Research Methodology In Management: Current Practices, Trends, And Implications For Future Research , 2000 .