Integrated green scheduling optimization of flexible job shop and crane transportation considering comprehensive energy consumption
暂无分享,去创建一个
[1] Marie-Laure Espinouse,et al. Complexity of Scheduling Problem in Single-Machine Flexible Manufacturing System with Cyclic Transportation and Unlimited Buffers , 2017, J. Optim. Theory Appl..
[2] Hadi Mokhtari,et al. An energy-efficient multi-objective optimization for flexible job-shop scheduling problem , 2017, Comput. Chem. Eng..
[3] Youfang Huang,et al. Integrated internal truck, yard crane and quay crane scheduling in a container terminal considering energy consumption , 2015, Expert Syst. Appl..
[4] Xiuli Wu,et al. A green scheduling algorithm for flexible job shop with energy-saving measures , 2018 .
[5] Wei Liu,et al. A new double flexible job-shop scheduling problem integrating processing time, green production, and human factor indicators , 2018 .
[6] Mohammad Mohammadi,et al. Scheduling flexible job-shops with transportation times: Mathematical models and a hybrid imperialist competitive algorithm , 2017 .
[7] Yanzhong Zhang,et al. Multi-object optimization of flexible flow shop scheduling with batch process — Consideration total electricity consumption and material wastage , 2018 .
[8] Xiuli Wu,et al. Multi-Objective Flexible Flow Shop Scheduling Problem Considering Variable Processing Time due to Renewable Energy , 2018 .
[9] Amir Ahmadi-Javid,et al. Integrating employee timetabling with scheduling of machines and transporters in a job-shop environment: A mathematical formulation and an Anarchic Society Optimization algorithm , 2017, Comput. Oper. Res..
[10] Min Dai,et al. Energy-efficient dynamic scheduling for a flexible flow shop using an improved particle swarm optimization , 2016, Comput. Ind..
[11] F. Pezzella,et al. A genetic algorithm for the Flexible Job-shop Scheduling Problem , 2008, Comput. Oper. Res..
[12] Quan-Ke Pan,et al. Energy-efficient permutation flow shop scheduling problem using a hybrid multi-objective backtracking search algorithm , 2017 .
[13] Lin Li,et al. A multi-level optimization approach for energy-efficient flexible flow shop scheduling , 2016 .
[14] Fardin Ahmadizar,et al. Group-shop scheduling with sequence-dependent set-up and transportation times , 2014 .
[15] Yuyan Han,et al. Efficient multi-objective optimization algorithm for hybrid flow shop scheduling problems with setup energy consumptions , 2018 .
[16] Tao Wu,et al. An energy-responsive optimization method for machine tool selection and operation sequence in flexible machining job shops , 2015 .
[17] Lei Wang,et al. A Feedback Control Method for Addressing the Production Scheduling Problem by Considering Energy Consumption and Makespan , 2017 .
[18] Yael Edan,et al. Collaborative reinforcement learning for a two-robot job transfer flow-shop scheduling problem , 2016 .
[19] Davide Giglio,et al. Integrated lot sizing and energy-efficient job shop scheduling problem in manufacturing/remanufacturing systems , 2017 .
[20] Congbo Li,et al. Influence factors and operational strategies for energy efficiency improvement of CNC machining , 2017 .
[21] Liang Gao,et al. A novel mathematical model and multi-objective method for the low-carbon flexible job shop scheduling problem , 2017, Sustain. Comput. Informatics Syst..
[22] Xin Yao,et al. Recent Advances in Evolutionary Algorithms for Job Shop Scheduling , 2013, Automated Scheduling and Planning.
[23] Débora P. Ronconi,et al. List scheduling and beam search methods for the flexible job shop scheduling problem with sequencing flexibility , 2015, Eur. J. Oper. Res..
[24] Fang Wang,et al. Mathematical modeling and evolutionary generation of rule sets for energy-efficient flexible job shops , 2017 .
[25] Ahmed Chiheb Ammari,et al. An effective and distributed particle swarm optimization algorithm for flexible job-shop scheduling problem , 2015, Journal of Intelligent Manufacturing.
[26] Khaled Ghédira,et al. Simultaneous scheduling of machines and transport robots in flexible job shop environment using hybrid metaheuristics based on clustered holonic multiagent model , 2016, Comput. Ind. Eng..
[27] Xin Yang,et al. Bi-Objective Flexible Job-Shop Scheduling Problem Considering Energy Consumption under Stochastic Processing Times , 2016, PloS one.
[28] Guo-Sheng Liu,et al. Minimizing energy consumption and tardiness penalty for fuzzy flow shop scheduling with state-dependent setup time , 2017 .
[29] Jin Wang,et al. Game theory based real-time multi-objective flexible job shop scheduling considering environmental impact , 2017 .
[30] Debasish Ghose,et al. Glowworm swarm optimization for simultaneous capture of multiple local optima of multimodal functions , 2009, Swarm Intelligence.