Scheduling Risk Evaluation for the Integrated Design of Blanket System Project for CFETR Based on Fuzzy PRET Method

In the framework of the conceptual design and engineering design of the Chinese Fusion Engineering Testing Reactor, some preliminary investigation and estimation of the encountered risk factors in the integrated design process of blanket system were carried out. Sub-tasks of the entire project need to be decomposed before performing the integrated design of blanket system in order to perform a risk assessment for each task. To describe the key time of design process and predict the dates of tasks, a fuzzy PERT method is presented. The integrated design of blanket system project is divided into several tasks, which includes the optimistic time, pessimistic time and the most likely time of each task based on the experience of designer and analyst. The earliest start/finish time, latest start/finish time and slack time of each task is calculated by using the fuzzy PERT method. As a result, the critical path is found for scheduling assessment. The completing probability of the project under different requirements during the design period is calculated, which can provide valuable reference for the scheduling assessment of the integrated design of blanket system project.

[1]  Ali Fuat Guneri,et al.  CPM, PERT and Project Management with Fuzzy Logic Technique and Implementation on a Business☆ , 2015 .

[2]  Shu Ing Doh,et al.  A Review of Risk Management Process in Construction Projects of Developing Countries , 2017 .

[3]  Songlin Liu,et al.  Conceptual design of a water cooled breeder blanket for CFETR , 2014 .

[4]  Mingzhun Lei,et al.  Neutronic investigation and activation calculation for CFETR HCCB blankets , 2017 .

[5]  Qingwei Yang,et al.  Overview of the present progress and activities on the CFETR , 2017 .

[6]  C. Bachmann,et al.  Progress in EU-DEMO in-vessel components integration , 2017 .

[7]  Yuntao Song,et al.  Analysis and optimization of the manifolds of the HCCB blanket for CFETR , 2018 .

[8]  Paolo Gardoni,et al.  Risk and Reliability Analysis , 2017 .

[9]  Jiangang Li,et al.  Present State of Chinese Magnetic Fusion Development and Future Plans , 2018, Journal of Fusion Energy.

[10]  Attila Piros,et al.  Fuzzy based method for project planning of the infrastructure design for the diagnostic in ITER , 2013 .

[11]  Yuntao Song,et al.  Thermal hydraulic analysis of the HECLIC blanket breeder unit for CFETR , 2015 .

[12]  Stein Haugen,et al.  Perspectives on risk and the unforeseen , 2015, Reliab. Eng. Syst. Saf..

[13]  Peng Fu,et al.  Concept Design of CFETR Tokamak Machine , 2014, IEEE Transactions on Plasma Science.

[14]  Kenneth R. Baker,et al.  PERT 21: Fitting PERT/CPM for use in the 21st century , 2012 .

[15]  Henk Koppelaar,et al.  Using fuzzy logic to improve the project time and cost estimation based on Project Evaluation and Review Technique (PERT) , 2018 .

[16]  Ana Nieto-Morote,et al.  A fuzzy approach to construction project risk assessment , 2011 .