Managing patient flow using time buffers

Purpose – The purpose of this paper is to determine how and why theory of constraints based time buffer management has contributed to improved patient flow in health and social care applications.Design/methodology/approach – The focus of the research is on the application and implementation of time buffer management by QFI Consulting. Four UK hospital implementations of the QFI Jonah software and methodology were investigated to establish how buffer management was being applied and why the reported benefits were being achieved. This involved collecting service delivery data together with semi‐structured interviews. To support this evaluation, four control functions of time buffer management have been identified as a basis for evaluation of the application designs and their implementation.Findings – Case research evidence shows significant and rapid improvement in length of stay (LOS) following implementation of the approach, amounting to a reduction in LOS of over 20 per cent and significantly improved ac...

[1]  W. A. Shewhart,et al.  Statistical method from the viewpoint of quality control , 1939 .

[2]  Ben Gowland,et al.  Completing the circle: from PD to PDSA. , 2004, International journal of health care quality assurance incorporating Leadership in health services.

[3]  Eliyahu M. Goldratt,et al.  Theory of Constraints , 1990 .

[4]  Eliyahu M. Goldratt,et al.  Standing on the shoulders of giants: production concepts versus production applications. The Hitachi Tool Engineering example , 2009 .

[5]  W. Edwards Deming,et al.  Out of the Crisis , 1982 .

[6]  K. Eisenhardt Building theories from case study research , 1989, STUDI ORGANIZZATIVI.

[7]  Sanjay Bhasin,et al.  Lean viewed as a philosophy , 2006 .

[8]  K. Vanhaecht,et al.  Effects of Clinical Pathways: Do They Work? , 2004 .

[9]  R Stratton,et al.  Utilising buffer management to manage uncertainty and focus improvement , 2008 .

[10]  R Stratton,et al.  CRITICAL CHAIN PROJECT MANAGEMENT THEORY AND PRACTICE , 2009 .

[11]  A. R. Crathorne,et al.  Economic Control of Quality of Manufactured Product. , 1933 .

[12]  Herman Steyn An investigation into the fundamentals of critical chain project scheduling , 2001 .

[13]  Taiichi Ohno,et al.  Toyota Production System : Beyond Large-Scale Production , 1988 .

[14]  Claire Moxham,et al.  Lessons for Lean in Healthcare from Using Six Sigma in the NHS , 2007 .

[16]  Elisabeth J. Umble,et al.  Utilizing buffer management to improve performance in a healthcare environment , 2006, Eur. J. Oper. Res..

[17]  C. Pegels The Toyota Production System , 1984 .

[18]  R. Yin Case Study Research: Design and Methods , 1984 .