The uncertainty circle as a value stream audit tool: A case study to identify the BPR requirements of the European automotive sector
暂无分享,去创建一个
Stephen Michael Disney | Paul Childerhouse | Denis Royston Towill | S. Disney | D. Towill | P. Childerhouse
[1] John L. Burbidge,et al. The principles of production control , 1968 .
[2] W. Edwards Deming,et al. Out of the Crisis , 1982 .
[3] D. Towill. FORRIDGE - Principles of good practice in material flow , 1997 .
[4] George Jr. Stalk Hout. Competing Against Time : How Time Based Competition Is Reshaping Global Markets , 2002 .
[5] J. Parnaby,et al. A systems approach to the implementation of JIT methodologies in Lucas Industries , 1988 .
[6] J.G.A.J. van der Vorst,et al. A methodology for generating effective logistical chain (re)designs , 1999 .
[7] G. Stevens. Integrating the Supply Chain , 1989 .
[8] C Williams,et al. Witch doctors. , 1970, Pediatrics.
[9] J. Burbidge,et al. Back to production management , 1995 .
[10] R. Wilding. The supply chain complexity triangle: Uncertainty generation in the supply chain , 1998 .
[11] John L. Burbidge,et al. Group technology and growth at Shalibane , 1994 .
[12] D. Towill. Time compression and supply chain management ‐ a guided tour , 1996 .
[13] M. Fisher. What is the Right Supply Chain for Your Product , 1997 .
[14] J. Gattorna,et al. Managing the Supply Chain , 1996 .
[15] 大野 耐一,et al. Toyota production system : beyond large-scale production , 1988 .