Batching policies for a repair shop with limited spares and finite capacity

Abstract Efficient batching for repair is essential to minimizing the ‘equipment downtime’ experienced by end-users when a repairable product fails. In this paper, the batching problem for a repair shop with limited spares and finite capacity is formulated and batching policies are developed. The performance of these policies is examined in a simulation model of a hypothetical repair shop. A policy called ‘SP-WBPT’ performed very well in all the environments tested. In this policy, the size of the batch is the number of failed parts of that part type waiting to be repaired. Batch selection is based onthe shortest batch processing time per part, weighted by the number of available spares.

[1]  D. Heyman Optimal disposal policies for a single‐item inventory system with returns , 1977 .

[2]  Gary D. Scudder Priority Scheduling and Spares Stocking Policies for a Repair Shop: The Multiple Failure Case , 1984 .

[3]  Averill M. Law,et al.  Simulation Modeling and Analysis , 1982 .

[4]  Michael J. Magazine,et al.  Batching in single operation manufacturing systems , 1985 .

[5]  Gary D. Scudder,et al.  Determining overtime policies for a repair shop , 1987 .

[6]  Steven Nahmiasj,et al.  A deterministic model for a repairable item inventory system with a finite repair rate , 1979 .

[7]  Jwm Will Bertrand Multiproduct Optimal Batch Sizes with In-Process Inventories and Multi Work Centers , 1985 .

[8]  K. Moinzadeh,et al.  Batch size and stocking levels in multi-echelon repairable systems , 1986 .

[9]  U. Karmarkar,et al.  Lotsizing in Multi-Item Multi- Machine Job Shops , 1985 .

[10]  Edward A. Silver Inventory allocation among an assembly and its repairable subassemblies , 1972 .

[11]  Uday S. Karmarkar,et al.  Lot-sizing and sequencing delays , 1987 .

[12]  Toji Makino Mean hazard rate and its application to the normal approximation of the weibull distribution , 1984 .

[13]  Uday S. Karmarkar,et al.  Multi-item Batching and Minimization of Queueing Delays , 1983 .

[14]  Paul H. Zipkin,et al.  Estimating the Performance of Multi-Level Inventory Systems , 1988, Oper. Res..

[15]  Gary D. Scudder,et al.  Priority Scheduling Rules for Repairable Inventory Systems , 1982 .

[16]  John A. Muckstadt Some approximations in multi‐item, multi‐echelon inventory systems for recoverable items , 1978 .

[17]  J. J. Brennan,et al.  The performance of cannibalization policies in a maintenance system with spares, repair, and resource constraints , 1986 .

[18]  Uday S. Karmarkar,et al.  Lot Sizes, Lead Times and In-Process Inventories , 1987 .

[19]  Paul H. Zipkin,et al.  Evaluation of one-for-one replenishment policies for multiechelon inventory systems , 1991 .

[20]  J. Muckstadt A Model for a Multi-Item, Multi-Echelon, Multi-Indenture Inventory System , 1973 .

[21]  Kamran Moinzadeh,et al.  A repairable item inventory system with diagnostic and repair service , 1989 .

[22]  D. Schrady A deterministic inventory model for reparable items , 1967 .

[23]  Stephen C. Graves,et al.  A Multi-Echelon Inventory Model for a Repairable Item with One-for-One Replenishment , 1985 .

[24]  Craig C. Sherbrooke,et al.  Metric: A Multi-Echelon Technique for Recoverable Item Control , 1968, Oper. Res..

[25]  John A. Muckstadt,et al.  An analysis of single item inventory systems with returns , 1981 .

[26]  Gary D. Scudder,et al.  Spares stocking policies for repairable items with dependent repair times , 1982 .

[27]  Uday S. Karmarkar,et al.  Batching to minimize flow times on one machine , 1987 .