MINIMUM FLOW TIME SCHEDULE GENETIC ALGORITHM FOR MASS CUSTOMIZATION MANUFACTURING USING MINICELLS

OF THESIS MINIMUM FLOW TIME SCHEDULE GENETIC ALGORITHM FOR MASS CUSTOMIZATION MANUFACTURING USING MINICELLS Minicells are small manufacturing cells dedicated to an option family and organized in a multi-stage configuration for mass customization manufacturing. Product variants, depending on the customization requirements of each customer, are routed through the minicells as necessary. For successful mass customization, customized products must be manufactured at low cost and with short turn around time. Effective scheduling of jobs to be processed in minicells is essential to quickly deliver customized products. In this research, a genetic algorithm based approach is developed to schedule jobs in a minicell configuration by considering it as a multi-stage flow shop. A new crossover strategy is used in the genetic algorithm to obtain a minimum flow time schedule.

[1]  David Upton,et al.  A Flexible Structure for Computer-Controlled Manufacturing Systems , 1992 .

[2]  Randall P. Sadowski,et al.  Cellular manufacturing control , 1983 .

[3]  Carliss Y. Baldwin,et al.  Managing in an age of modularity. , 1997, Harvard business review.

[4]  Jose M. Framiñan,et al.  A review and classification of heuristics for permutation flow-shop scheduling with makespan objective , 2004, J. Oper. Res. Soc..

[5]  Jaideep Motwani,et al.  Flowshop scheduling/sequencing research: a statistical review of the literature, 1952-1994 , 1997 .

[6]  Ravi Sethi,et al.  The Complexity of Flowshop and Jobshop Scheduling , 1976, Math. Oper. Res..

[7]  David S. Johnson,et al.  Computers and Intractability: A Guide to the Theory of NP-Completeness , 1978 .

[8]  Kenji Itoh,et al.  Minimizing makespan for flow shop scheduling by combining simulated annealing with sequencing knowledge , 1995 .

[9]  Asoo J. Vakharia,et al.  Evaluating Virtual Cells and Multistage Flow Shops: An Analytical Approach , 1999 .

[10]  S. Davis Future Perfect , 1987 .

[11]  Hau L. Lee,et al.  Mass Customization at Hewlett-Packard : The Power of Postponement , 1999 .

[12]  Dale T. Masel,et al.  A modular minicell configuration for mass customisation manufacturing , 2007 .

[13]  Gürsel A. Süer,et al.  Evolutionary programming for minimizing the average flow time in the presence of non-zero ready times , 2003, Comput. Ind. Eng..

[14]  Rebecca Duray,et al.  Mass customization configurations : an empirical investigation of manufacturing practices of customization , 1997 .

[15]  C. Rajendran,et al.  An efficient heuristic for scheduling in a flowshop to minimize total weighted flowtime of jobs , 1997 .

[16]  Yajie Tian,et al.  Three-Stage Tabu Search for Solving Large-Scale Flow Shop Scheduling Problems , 2003 .

[17]  S. Kotha From mass production to mass customization: The case of the National Industrial Bicycle Company of Japan , 1996 .

[18]  B. J. Pine,et al.  Making mass customization work , 1993 .

[19]  Jose M. Framiñan,et al.  Comparison of heuristics for flowtime minimisation in permutation flowshops Technical report IO-2003 / 01 Version 0 . 5 Last version : 26 / 07 / 2003 , 2004 .

[20]  C. D. Gelatt,et al.  Optimization by Simulated Annealing , 1983, Science.

[21]  F. T. Piller,et al.  Mass customization: four approaches to deliver customized products and services with mass production efficiency , 2002, IEEE International Engineering Management Conference.

[22]  Andrew Kusiak,et al.  Group technology , 1987 .

[23]  Jiyin Liu,et al.  Constructive and composite heuristic solutions to the P// Sigma Ci scheduling problem , 2001, Eur. J. Oper. Res..

[24]  Sanguthevar Rajasekaran,et al.  Maximizing reliability while scheduling real-time task-graphs on a cluster of computers , 2005, 10th IEEE Symposium on Computers and Communications (ISCC'05).

[25]  Gilmore Jh,et al.  The four faces of mass customization. , 1997 .

[26]  Venkata Ranga Neppalli,et al.  Minimizing total flow time in a two-machine flowshop problem with minimum makespan , 2001 .

[27]  Inyong Ham,et al.  A heuristic algorithm for the m-machine, n-job flow-shop sequencing problem , 1983 .

[28]  S. M. Johnson,et al.  Optimal two- and three-stage production schedules with setup times included , 1954 .

[29]  Chinyao Low,et al.  Simulated annealing heuristic for flow shop scheduling problems with unrelated parallel machines , 2005, Comput. Oper. Res..

[30]  David S. Johnson,et al.  `` Strong '' NP-Completeness Results: Motivation, Examples, and Implications , 1978, JACM.

[31]  John W. Fowler,et al.  A multi-population genetic algorithm to solve multi-objective scheduling problems for parallel machines , 2003, Comput. Oper. Res..

[32]  Jocelyn Drolet,et al.  The cellular manufacturing evolution , 1996 .

[33]  Mitsuo Gen,et al.  Genetic algorithms and engineering optimization , 1999 .

[34]  Chinyao Low,et al.  A robust simulated annealing heuristic for flow shop scheduling problems , 2004 .

[35]  Michel Gendreau,et al.  Metaheuristics in Combinatorial Optimization , 2022 .

[36]  Georges Abdul-Nour,et al.  Physically reconfigurable virtual cells: a dynamic model for a highly dynamic environment , 1995 .

[37]  S. Kotha Mass Customization: The New Frontier in Business Competition , 1992 .

[38]  Ali Allahverdi,et al.  New heuristics to minimize total completion time in m-machine flowshops , 2002 .

[39]  Wei-Cheng Lai,et al.  Design the Hardware of Genetic Algorithm for TSP and MSA , 2004, KES.

[40]  Meral Azizoglu,et al.  On the minimization of total weighted flow time with identical and uniform parallel machines , 1999, Eur. J. Oper. Res..

[41]  D. Fogel An evolutionary approach to the traveling salesman problem , 1988, Biological Cybernetics.

[42]  J. Slomp,et al.  Performance comparison of virtual cellular manufacturing with functional and cellular layouts in DRC settings , 2005 .

[43]  Christian Blum,et al.  Metaheuristics in combinatorial optimization: Overview and conceptual comparison , 2003, CSUR.

[44]  Frank Werner,et al.  A heuristic algorithm for minimizing mean flow time with unit setups , 2001, Inf. Process. Lett..

[45]  R. A. Dudek,et al.  A Heuristic Algorithm for the n Job, m Machine Sequencing Problem , 1970 .

[46]  Charles R. McLean,et al.  Flexible Manufacturing System for Mass Customization Manufacturing , 2003, MCPC.

[47]  Gürsel A. Süer,et al.  Capacitated lot sizing by using multi-chromosome crossover strategy , 2008, J. Intell. Manuf..

[48]  N. Anantharaman,et al.  Relative performance evaluation of permutation and non-permutation schedules in flowline-based manufacturing systems with flowtime objective , 2004 .

[49]  Fathima Fazleena Badurdeen Minicell Configuration for Mass Customization Manufacturing , 2005 .

[50]  R. Barton,et al.  Simulated annealing heuristics for the average flow-time and the number of tardy jobs bi-criteria identical parallel machine problem , 1997 .

[51]  Mieczysław Wodecki,et al.  A very fast tabu search algorithm for the permutation flow shop problem with makespan criterion , 2004, Comput. Oper. Res..

[52]  J. Framiñan,et al.  An efficient constructive heuristic for flowtime minimisation in permutation flow shops , 2003 .

[53]  Charles R. McLean,et al.  THE VIRTUAL MANUFACTURING CELL , 1982 .

[54]  Hoon-Shik Woo,et al.  A heuristic algorithm for mean flowtime objective in flowshop scheduling , 1998, Comput. Oper. Res..

[55]  A. Neubauer The circular schema theorem for genetic algorithms and two-point crossover , 1997 .