Applying Risk Management Workshop for a Public Construction Project: Case Study.

The selection of proper risk management tools and techniques is critical for better decision-making. Because very few studies scrutinize the use of a workshop as a risk management approach, this paper aims to explore how a risk management workshop can be effectively used in managing project risks, by studying a risk management workshop that was conducted in a public project. An in-depth case study approach was adopted to identify the benefits and challenges of this method of risk management. The subsequent performance of the public organization in managing risks was examined by evaluating its functional risk management implementation. In addition to furthering an organization’s understanding of major project risks, a risk management workshop also provides opportunities for team building. However, a breakdown in the risk communication that eventually resulted in a poor risk management implementation was uncovered in the implementation of the project. Continued efforts to improve risk management implementation are needed to overcome the shortcomings associated with the current practices. DOI: 10.1061/(ASCE)CO.1943-7862.0000599. © 2013 American Society of Civil Engineers. CE Database subject headings: Risk management; Project management; Case studies. Author keywords: Risk management workshop; Risk identification; Risk analysis; Public project.

[1]  Robert K. Yin,et al.  Applications of case study research , 1993 .

[2]  Terry Lyons,et al.  Project risk management in the Queensland engineering construction industry : a survey , 2004 .

[3]  Colin Duffield,et al.  Risk management in the Chinese construction industry , 2007 .

[4]  H. Taylor,et al.  Congruence between risk management theory and practice in Hong Kong vendor-driven IT projects , 2005 .

[5]  Seung Heon Han,et al.  A web-based integrated system for international project risk management , 2008 .

[6]  Joseph H. M. Tah,et al.  Towards a framework for project risk knowledge management in the construction supply chain , 2001 .

[7]  Nigel J. Smith,et al.  Application of a fuzzy based decision making methodology to construction project risk assessment , 2007 .

[8]  Stephen Ward,et al.  Assessing and managing important risks , 1999 .

[9]  Stephen J. Simister,et al.  Qualitative and Quantitative Risk Management , 2007 .

[10]  Akintola Akintoye,et al.  Project risk management practice: The case of a South African utility company , 2008 .

[11]  V. M. Rao Tummala,et al.  A risk management model for improving operation and maintenance activities in electricity transmission networks , 2001, J. Oper. Res. Soc..

[12]  Chris Chapman,et al.  Project risk analysis and management - PRAM the generic process , 1997 .

[13]  Simon Smith,et al.  Tools for selecting appropriate risk management techniques in the built environment , 2008 .

[14]  Tzvi Raz,et al.  Use and benefits of tools for project risk management , 2001 .

[15]  J. Perry,et al.  RISK AND ITS MANAGEMENT IN CONSTRUCTION PROJECTS. , 1985 .

[16]  A. Akintoye,et al.  Risk analysis and management in construction , 1997 .

[17]  Ghassan Aouad,et al.  Learning from risks: A tool for post-project risk assessment , 2008 .

[18]  Gd Wood,et al.  Risk management practices of leading UK cost consultants , 2003 .