국내 데크작업의 생산성 증대에 관한 연구

The use of plates have gone on constantly increasing the slab system of the steel structures in construction field but the productivity of deck plate installation has constantly declined because of the lack of coordination, fragmented nature, and queuing time. This paper provides models for analyzing the complex cause and effect relationships that may lead to a loss of productivity in construction. The purpose of this study is to suggest the methods to improve the productivity and reduce the idle time of the deck plate installation through work sampling, crew balance, work sequence evaluation, and Extend simulation. The model introduced in the paper will provide a new approach to evaluating occurrences of productivity.