Printed Circuit Board Assembly
暂无分享,去创建一个
[1] Frits C. R. Spieksma,et al. The feeder rack assignment problem in PCB assembly: A case study , 2000 .
[2] G. Kendall,et al. A nozzle selection heuristic to optimise the hybrid pick and place machine , 2004, IEEE Conference on Cybernetics and Intelligent Systems, 2004..
[3] Frits C. R. Spieksma,et al. Production planning problems in printed circuit board assembly , 2002, Discret. Appl. Math..
[4] Kemal Altinkemer,et al. Optimization of multi-feeder (depot) printed circuit board manufacturing with error guarantees , 2003, Eur. J. Oper. Res..
[5] Pierre Hansen,et al. Solving the p‐Center problem with Tabu Search and Variable Neighborhood Search , 2000, Networks.
[6] Surendra M. Gupta,et al. SMT FEEDER SLOT ASSIGNMENT FOR PREDETERMINED COMPONENT PLACEMENT PATHS , 1996 .
[7] Graham Kendall,et al. Hyper-Heuristics: An Emerging Direction in Modern Search Technology , 2003, Handbook of Metaheuristics.
[8] Fred W. Glover,et al. A user's guide to tabu search , 1993, Ann. Oper. Res..
[9] Krishnaswami Srihari,et al. Expert system based placement sequence identification for surface mount PCB assembly , 1996 .
[10] Sungsoo Park,et al. Efficient operation of a surface mounting machine with a multihead turret , 1996 .
[11] Reza H. Ahmadi,et al. Routing heuristics for automated pick and place machines , 1999, Eur. J. Oper. Res..
[12] Graham Kendall,et al. An Investigation of a Tabu-Search-Based Hyper-Heuristic for Examination Timetabling , 2005 .
[13] Reza H. Ahmadi. A Hierarchical Approach to Design, Planning, and Control Problems in Electronic Circuit Card Manufacturing , 1993 .
[14] Haomin Li,et al. Integer programming approach to printed circuit board assembly time optimization , 1995 .
[15] Robert De Souza,et al. Intelligent optimization of component onsertion in multi-head concurrent operation PCBA machines , 1995, J. Intell. Manuf..
[16] L. P. Khoo,et al. A Genetic Algorithms Enhanced Planning System for Surface Mount PCB Assembly , 2000 .
[17] Ihsan Sabuncuoglu,et al. Analysis of reactive scheduling problems in a job shop environment , 2000, Eur. J. Oper. Res..
[18] Frits C. R. Spieksma,et al. Minimizing the number of tool switches on a flexible machine , 1994 .
[19] J. Sun,et al. A dynamic reactive scheduling mechanism for responding to changes of production orders and manufacturing resources , 2001, Comput. Ind..
[20] Ihsan Sabuncuoglu,et al. Experimental investigation of iterative simulation-based scheduling in a dynamic and stochastic job shop , 2001 .
[21] Ming-Chuan Leu,et al. Planning of Component Placement/Insertion Sequence and Feeder Setup in PCB Assembly Using Genetic Algorithm , 1993 .
[22] Frits C. R. Spieksma,et al. The component retrieval problem in printed circuit board assembly , 1995 .
[23] Hsin-Pin Fu,et al. A novel tabu search approach to find the best placement sequence and magazine assignment in dynamic robotics assembly , 1998 .
[24] Peter Baer Galvin,et al. Applied Operating System Concepts , 1999 .
[25] James R. Evans,et al. Heuristic methods and applications: A categorized survey , 1989 .
[26] Satish T. S. Bukkapatnam,et al. A genetic algorithm for sequential part assignment for PCB assembly , 2001 .
[27] D. de Werra,et al. A tutorial on heuristic methods , 1980 .
[28] David S. Johnson,et al. Computers and Intractability: A Guide to the Theory of NP-Completeness , 1978 .
[29] Graham Kendall,et al. An investigation of a hyperheuristic genetic algorithm applied to a trainer scheduling problem , 2002, Proceedings of the 2002 Congress on Evolutionary Computation. CEC'02 (Cat. No.02TH8600).
[30] Graham Kendall,et al. Channel assignment in cellular communication using a great deluge hyper-heuristic , 2004, Proceedings. 2004 12th IEEE International Conference on Networks (ICON 2004) (IEEE Cat. No.04EX955).
[31] Graham Kendall,et al. An Investigation of Automated Planograms Using a Simulated Annealing Based Hyper-Heuristic , 2005 .
[32] Surendra M. Gupta,et al. Development of the surface mount assembly process through an angular board orientation , 1998 .
[33] Alexander Nareyek,et al. Choosing search heuristics by non-stationary reinforcement learning , 2004 .
[34] Ping Ji,et al. A hybrid genetic algorithm for component sequencing and feeder arrangement , 2004, J. Intell. Manuf..
[35] Richard F. Hartl,et al. A Variable Neighborhood Search for the Multi Depot Vehicle Routing Problem with Time Windows , 2004, J. Heuristics.
[36] Leon F. McGinnis,et al. Facility Layout and Location: An Analytical Approach , 1991 .
[37] Krishnaswami Srihari,et al. A Solution Methodology for the Multiple Batch Surface Mount PCB Placement Sequence Problem , 1994 .
[38] Graham Kendall,et al. Real-time scheduling for multi headed placement machine , 2003, Proceedings of the IEEE International Symposium onAssembly and Task Planning, 2003..
[39] Robert de Souza,et al. CPS: a productivity tool for component placement in multi-head concurrent operation PCBA machines , 1994 .
[40] Thomas M. Tirpak. Design-to-Manufacturing Information Management for Electronics Assembly , 2001 .
[41] Leon F. McGinnis,et al. AUTOMATED PROCESS PLANNING FOR PRINTED CIRCUIT CARD ASSEMBLY , 1992 .
[42] Peter Ross,et al. A Heuristic Combination Method for Solving Job-Shop Scheduling Problems , 1998, PPSN.
[43] G. Kendall,et al. A new dynamic point specification approach to optimise surface mount placement machine in printed circuit board assembly , 2002, 2002 IEEE International Conference on Industrial Technology, 2002. IEEE ICIT '02..
[44] Graham Kendall,et al. Optimisation for surface mount placement machines , 2002, 2002 IEEE International Conference on Industrial Technology, 2002. IEEE ICIT '02..
[45] G. Kendall,et al. Channel assignment optimisation using a hyper-heuristic , 2004, IEEE Conference on Cybernetics and Intelligent Systems, 2004..
[46] Jeffrey W. Herrmann,et al. Rescheduling Manufacturing Systems: A Framework of Strategies, Policies, and Methods , 2003, J. Sched..
[47] G. L. Thompson,et al. A Heuristic Approach to Solving Travelling Salesman Problems , 1964 .
[48] S. Elmaghraby,et al. An optimal assembly mode of multi-type printed circuit boards , 1999 .
[49] L. T. Wille,et al. Comparative study of heuristics for optimal printed circuit board assembly , 1995, Proceedings of Southcon '95.
[50] Chiuh-Cheng Chyu,et al. A minimum setup strategy for sequencing PCBs with multi‐slot feeders , 2003 .
[51] Pierre Hansen,et al. Variable neighborhood search for extremal graphs. 5. Three ways to automate finding conjectures , 2000, Discret. Math..
[52] Krzysztof Fleszar,et al. Solving the resource-constrained project scheduling problem by a variable neighbourhood search , 2004, Eur. J. Oper. Res..
[53] Jacques Ferber,et al. Multi-agent systems - an introduction to distributed artificial intelligence , 1999 .
[54] Collin Wang. Layout designs for robotic PCB assembly , 1996 .
[55] Mirjana Cangalovic,et al. Solving spread spectrum radar polyphase code design problem by tabu search and variable neighbourhood search , 2003, Eur. J. Oper. Res..
[56] C Wang,et al. A Magazine Assignment Heuristic for Robotic Assembly Using the Dynamic Pick-and-Place Approach , 1997 .
[57] Pius J. Egbelu,et al. Alternative approaches to sequencing robot moves for PCB assembly , 1989 .
[58] D. Chan. Precedence constrained TSP applied to circuit board assembly and no wait flowshop , 1993 .
[59] Graham Kendall,et al. An investigation of a tabu assisted hyper-heuristic genetic algorithm , 2003, The 2003 Congress on Evolutionary Computation, 2003. CEC '03..
[60] Li Pheng Khoo,et al. A genetic algorithm-based planning system for PCB component placement , 1998 .
[61] Silvano Martello,et al. Meta-Heuristics: Advances and Trends in Local Search Paradigms for Optimization , 2012 .
[62] A. Sciomachen,et al. A Petri net characterization of a high speed placement machine , 1988, 38th Electronics Components Conference 1988., Proceedings..
[63] Horst W. Hamacher,et al. Finding placement sequences and bin locations for cartesian robots , 1994 .
[64] Yuehwern Yih,et al. A collision-free sequencing algorithm for PWB assembly , 1991 .
[65] Ihsan Sabuncuoglu,et al. Rescheduling frequency in an FMS with uncertain processing times and unreliable machines , 1999 .
[66] Michael O. Ball,et al. Sequencing of Insertions in Printed Circuit Board Assembly , 1988, Oper. Res..
[67] Peter I. Cowling,et al. New models and heuristics for component placement in printed circuit board assembly , 1999, Proceedings 1999 International Conference on Information Intelligence and Systems (Cat. No.PR00446).
[68] Robin Liggett,et al. The Quadratic Assignment Problem: An Experimental Evaluation of Solution Strategies , 1981 .
[69] Hsin-Pin Fu,et al. A comparison of search techniques for minimizing assembly time in printed wiring assembly , 2000 .
[70] Jane C. Ammons,et al. Multiple assignment of component types to feeder slots on automated printed circuit card placement machines , 2000 .
[71] Peter C. Nelson,et al. Optimization of high-speed multistation SMT placement machines using evolutionary algorithms , 1999 .
[72] Inmaculada Rodríguez Martín,et al. Variable neighborhood tabu search and its application to the median cycle problem , 2003, Eur. J. Oper. Res..
[73] Emile H. L. Aarts,et al. Simulated annealing and Boltzmann machines - a stochastic approach to combinatorial optimization and neural computing , 1990, Wiley-Interscience series in discrete mathematics and optimization.
[74] Peter C. Nelson,et al. Optimization of automated high-speed modular placement machines using knowledge-based systems , 2000, IEEE Trans. Syst. Man Cybern. Part C.
[75] Alain Hertz,et al. Using tabu search techniques for graph coloring , 1987, Computing.
[76] Graham Kendall,et al. A Tabu-Search Hyperheuristic for Timetabling and Rostering , 2003, J. Heuristics.
[77] Nan‐Shing Ong,et al. Sequence placement planning for high‐speed PCB assembly machine , 2002 .
[78] T. M. Tirpak,et al. Optimization of revolver head SMT machines using adaptive simulated annealing (ASA) , 2000, Twenty Sixth IEEE/CPMT International Electronics Manufacturing Technology Symposium (Cat. No.00CH37146).
[79] Collin Wang,et al. Heuristics for assembly sequencing and relative magazine assignment for robotic assembly , 1998 .
[80] Stephen Grotzinger. FEEDER ASSIGNMENT MODELS FOR CONCURRENT PLACEMENT MACHINES , 1992 .
[81] Ekrem Duman,et al. Precedence constrained TSP arising in printed circuit board assembly , 2004 .
[82] Peter Ross,et al. Learning a Procedure That Can Solve Hard Bin-Packing Problems: A New GA-Based Approach to Hyper-heuristics , 2003, GECCO.
[83] Christian Blum,et al. Metaheuristics in combinatorial optimization: Overview and conceptual comparison , 2003, CSUR.
[84] Jin-Kao Hao,et al. Hybrid Evolutionary Algorithms for Graph Coloring , 1999, J. Comb. Optim..
[85] Graham Kendall,et al. Hyperheuristics: A Tool for Rapid Prototyping in Scheduling and Optimisation , 2002, EvoWorkshops.
[86] Edmund K. Burke,et al. Hyperheuristic Approaches for Multiobjective Optimisation , 2003 .
[87] Li Pheng Khoo,et al. Genetic algorithm approach in PCB assembly , 1999 .
[88] Peter C. Nelson,et al. Optimization of a high-speed placement machine using tabu search algorithms , 2000, Ann. Oper. Res..
[89] David E. Goldberg,et al. Genetic Algorithms in Search Optimization and Machine Learning , 1988 .
[90] Thomas L. Landers,et al. A heuristic algorithm for minimizing total production time for a sequence of jobs on a surface mount placement machine , 1993 .
[91] William Ho,et al. Component scheduling for chip shooter machines: a hybrid genetic algorithm approach , 2003, Comput. Oper. Res..
[92] E. Burke,et al. Hybrid Graph Heuristics within a Hyper-Heuristic Approach to Exam Timetabling Problems , 2005 .
[93] Dennis Johnson,et al. Component Allocation and Partitioning for a Dual Delivery Placement Machine , 1988, Oper. Res..
[94] Sanja Petrovic,et al. Knowledge discovery in hyper-heuristic using case-based reasoning on course timetabling , 2002 .
[95] Hsin-Pin Fu,et al. A simulated annealing heuristic for robotics assembly using the dynamic pick-and-place model , 1998 .
[96] Krishnan Srintvasan,et al. AI-Based Process Planning for Electronic Assembly , 1991 .
[97] Jonathan F. Bard,et al. Machine setup and component placement in printed circuit board assembly , 1994 .
[98] Dennis Johnson,et al. Emulating concurrency in a circuit card assembly system , 1991 .
[99] Sanja Petrovic,et al. Case-based heuristic selection for timetabling problems , 2006, J. Sched..
[100] Chi-Geun Han,et al. Solving the rural postman problem using a genetic algorithm with a graph transformation , 1998, SAC '98.
[101] S. H. Lee,et al. A hierarchical method to improve the productivity of a multi-head surface mounting machine , 1999, Proceedings 1999 IEEE International Conference on Robotics and Automation (Cat. No.99CH36288C).
[102] Mohsen Shakeri,et al. Implementation of an automated operation planning and optimum operation sequencing and tool selection algorithms , 2004, Comput. Ind..
[103] Daniel Mercier,et al. IC insertion: an application of the travelling salesman problem , 1989 .
[104] Beno Benhabib,et al. Motion planning for multi-robot assembly systems , 2000, Int. J. Comput. Integr. Manuf..
[105] David S. Johnson,et al. Local Optimization and the Traveling Salesman Problem , 1990, ICALP.
[106] Ming-Chuan Leu,et al. Adaptive Genetic Algorithm for Optimal Printed Circuit Board Assembly Planning , 1993 .
[107] Ghulam Abdul Quadir,et al. OPTIMIZATION OF PCB COMPONENT PLACEMENT USING GENETIC ALGORITHMS , 2002 .
[108] Pierre Hansen,et al. Variable Neighborhood Search , 2018, Handbook of Heuristics.
[109] Graham Kendall,et al. A Monte Carlo Hyper-Heuristic To Optimise Component Placement Sequencing For Multi Head Placement Machine , 2003 .
[110] Tien-Chien Chang,et al. A rule based system for printed wiring assembly process planning , 1987 .
[111] James P. Kelly,et al. Meta-Heuristics: An Overview , 1996 .
[112] Herbert Moskowitz,et al. Optimization of printed circuit board manufacturing: Integrated modeling and algorithms , 2000, Eur. J. Oper. Res..
[113] Gerald M. Knapp,et al. Multiple setup PCB assembly planning using genetic algorithms , 2002 .
[114] Fred Glover,et al. Tabu Search - Part II , 1989, INFORMS J. Comput..
[115] P. Cavalloro,et al. INCA: an expert system for process planning in PCB assembly line , 1988, [1988] Proceedings. The Fourth Conference on Artificial Intelligence Applications.
[116] Frits C. R. Spieksma,et al. Throughput rate optimization in the automated assembly of printed circuit boards , 1991 .
[117] J. K. Lenstra,et al. Local Search in Combinatorial Optimisation. , 1997 .
[118] Shanling Li,et al. Jobs and tool sequencing in an automated manufacturing environment , 1993 .
[119] Michael K. Ng. Clustering methods for printed circuit board insertion problems , 2000, J. Oper. Res. Soc..
[120] O. E. Flippo,et al. The assembly of printed circuit boards : a case with multiple machines and multiple board types , 1995 .
[121] Tae-Eog Lee,et al. Component allocation and feeder arrangement for a dual-gantry multi-head surface mounting placement tool ☆ , 2005 .
[122] Zhonghui Luo,et al. Optimizing the operation sequence of a chip placement machine using TSP model , 2003 .
[123] P. Hansen,et al. Variable neighborhood search for the p-median , 1997 .
[124] Peter C. Nelson,et al. Optimization of high-mix printed circuit card assembly using genetic algorithms , 1997, Ann. Oper. Res..
[125] Krzysztof Fleszar,et al. New heuristics for one-dimensional bin-packing , 2002, Comput. Oper. Res..
[126] Graham Kendall,et al. A triple objective function with a Chebychev dynamic pick-and-place point specification approach to optimise the surface mount placement machine , 2005, Eur. J. Oper. Res..
[127] L. R. Foulds,et al. The Heuristic Problem-Solving Approach , 1983 .
[128] O. Nevalainen,et al. Optimization of the movements of a component placement machine , 1989 .
[129] Horst W. Hamacher,et al. Optimal bin location and sequencing in printed circuit board assembly , 1993 .
[130] J. Bard. A Heuristic for Minimizing the Number of Tool Switches on a Flexible Machine , 1988 .
[131] Graham Kendall,et al. A Hyperheuristic Approach to Scheduling a Sales Summit , 2000, PATAT.
[132] Graham Kendall,et al. Hyperheuristics: A Robust Optimisation Method Applied to Nurse Scheduling , 2002, PPSN.
[133] Raymond S. K. Kwan,et al. Distributed Choice Function Hyper-heuristics for Timetabling and Scheduling , 2004, PATAT.
[134] Mario T. Tabucanon,et al. Extended dynamic point specification approach to sequencing robot moves for PCB assembly , 2001 .
[135] Peter Cowling,et al. Production, Manufacturing and Logistics Using real time information for effective dynamic scheduling , 2002 .
[136] Peter Ross,et al. Solving a Real-World Problem Using an Evolving Heuristically Driven Schedule Builder , 1998, Evolutionary Computation.
[137] Arvind Rajan,et al. Using grasp to solve the component grouping problem , 1994 .
[138] Zvi Drezner,et al. On Optimizing Bin Picking and Insertion Plans for Assembly Robots , 1984 .
[139] I. M. Ovacikt,et al. Rolling horizon algorithms for a single-machine dynamic scheduling problem with sequence-dependent setup times , 1994 .
[140] Mika Johnsson,et al. ON SOLVING SINGLE MACHINE OPTIMIZATION PROBLEMS IN ELECTRONICS ASSEMBLY , 1999 .
[141] Pierre Hansen,et al. Variable Neighborhood Decomposition Search , 1998, J. Heuristics.
[142] Kimberly P. Ellis,et al. Optimizing the performance of a surface mount placement machine , 2001 .
[143] Surendra M. Gupta,et al. SIMULTANEOUS COMPONENT SEQUENCING AND FEEDER ASSIGNMENT FOR HIGH SPEED CHIP SHOOTER MACHINES , 1996 .
[144] Pierre Hansen,et al. Variable Neighborhood Search for Extremal Graphs: IV: Chemical Trees with Extremal Connectivity Index , 1998, Comput. Chem..
[145] Wen Lea Pearn,et al. Algorithms for the rural postman problem , 1995, Comput. Oper. Res..
[146] Ping Ji,et al. SMT production scheduling: a generalized transportation approach , 1994 .
[147] Krishnaswami Srihari,et al. Placement sequence identification using artificial neural networks in surface mount PCB assembly , 1996 .
[148] P. Cowling,et al. A Parameter-Free Hyperheuristic for Scheduling a Sales Summit , 2002 .
[149] Victor J. Rayward-Smith,et al. A first course in computability , 1986 .
[150] Nguyen Van Hop,et al. Multiple criteria approach for solving feeder assignment and assembly sequence problem in PCB assembly , 2001 .
[151] Reza H. Ahmadi,et al. Component Fixture Positioning/Sequencing for Printed Circuit Board Assembly with Concurrent Operations , 1995, Oper. Res..
[152] Pierre Hansen,et al. Cooperative Parallel Variable Neighborhood Search for the p-Median , 2004, J. Heuristics.
[153] W. H. M. Zijm,et al. Production preparation and numerical control in PCB assembly , 1993 .
[154] L. P. Khoo,et al. PCB assembly planning using genetic algorithms , 1998 .
[155] Michael K. Ng,et al. Heuristics approach to printed circuit board insertion problem , 1998, J. Oper. Res. Soc..
[156] Alain Hertz,et al. A variable neighborhood search for graph coloring , 2003, Eur. J. Oper. Res..
[157] Kimberly P. Ellis,et al. Development of placement time estimator function for a turret style surface mount placement machine , 2002 .
[158] Dileep R. Sule. Job sequencing to minimize tool changeovers in flexible manufacturing systems , 1993 .
[159] Manuel Laguna,et al. Tabu Search , 1997 .
[160] Pius J. Egbelu,et al. A dynamic point specification approach to sequencing robot moves for PCB assembly , 1995 .
[161] S. H. Yeo,et al. A rule-based frame system for concurrent assembly machines , 1996 .
[162] Surendra M. Gupta,et al. AN EFFICIENT ASSEMBLY SEQUENCING HEURISTIC FOR PRINTED CIRCUIT BOARD CONFIGURATIONS , 1997 .
[163] Farouk Yalaoui,et al. On-line maintenance job scheduling and assignment to resources in distributed systems by heuristic-based optimization , 2004, J. Intell. Manuf..