A co-evolutionary teaching-learning-based optimization algorithm for stochastic RCPSP
暂无分享,去创建一个
[1] Minqiang Li,et al. A hybrid coevolutionary algorithm for designing fuzzy classifiers , 2009, Inf. Sci..
[2] Chen Fang,et al. A hybrid estimation of distribution algorithm for solving the resource-constrained project scheduling problem , 2012, Expert Syst. Appl..
[3] Chen Fang,et al. An effective shuffled frog-leaping algorithm for multi-mode resource-constrained project scheduling problem , 2011, Inf. Sci..
[4] Rainer Kolisch,et al. Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem , 2000, Eur. J. Oper. Res..
[5] Jinwei Gu,et al. A novel competitive co-evolutionary quantum genetic algorithm for stochastic job shop scheduling problem , 2010, Comput. Oper. Res..
[6] Frederik Stork,et al. Stochastic resource-constrained project scheduling , 2001 .
[7] Rainer Kolisch,et al. Experimental investigation of heuristics for resource-constrained project scheduling: An update , 2006, Eur. J. Oper. Res..
[8] Margaret J. Robertson,et al. Design and Analysis of Experiments , 2006, Handbook of statistics.
[9] Francisco Ballestín,et al. When it is worthwhile to work with the stochastic RCPSP? , 2007, J. Sched..
[10] Vedat Toğan,et al. Design of planar steel frames using Teaching–Learning Based Optimization , 2012 .
[11] Anupriya Gogna,et al. Metaheuristics: review and application , 2013, J. Exp. Theor. Artif. Intell..
[12] R. Rao,et al. Multi-objective optimization of heat exchangers using a modified teaching-learning-based optimization algorithm , 2013 .
[13] Rainer Kolisch. Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation , 1994 .
[14] Sönke Hartmann,et al. A competitive genetic algorithm for resource-constrained project scheduling , 1998 .
[15] Chen Fang,et al. An effective estimation of distribution algorithm for the multi-mode resource-constrained project scheduling problem , 2012, Comput. Oper. Res..
[16] Nicolás García-Pedrajas,et al. A cooperative coevolutionary algorithm for instance selection for instance-based learning , 2010, Machine Learning.
[17] Rainer Kolisch,et al. PSPLIB - A project scheduling problem library: OR Software - ORSEP Operations Research Software Exchange Program , 1997 .
[18] R. V. Rao,et al. Teaching–learning-based optimization algorithm for unconstrained and constrained real-parameter optimization problems , 2012 .
[19] Roel Leus,et al. New competitive results for the stochastic resource-constrained project scheduling problem: exploring the benefits of pre-processing , 2011, J. Sched..
[20] Wei Zeng,et al. A Dual-System Variable-Grain Cooperative Coevolutionary Algorithm: Satellite-Module Layout Design , 2010, IEEE Transactions on Evolutionary Computation.
[21] Willy Herroelen,et al. Project scheduling under uncertainty: Survey and research potentials , 2005, Eur. J. Oper. Res..
[22] Andries Petrus Engelbrecht,et al. A Cooperative approach to particle swarm optimization , 2004, IEEE Transactions on Evolutionary Computation.
[23] Chen Fang,et al. An effective shuffled frog-leaping algorithm for resource-constrained project scheduling problem , 2012, Comput. Oper. Res..
[24] Wang Ling,et al. Ordinal chemical reaction optimization for stochastic resource constrained project scheduling problem , 2013, Proceedings of the 32nd Chinese Control Conference.
[25] R. Venkata Rao,et al. Teaching-learning-based optimization: A novel method for constrained mechanical design optimization problems , 2011, Comput. Aided Des..
[26] Peter J. Angeline,et al. Competitive Environments Evolve Better Solutions for Complex Tasks , 1993, ICGA.
[27] Hsiao-Fan Wang,et al. A coevolutionary algorithm for the flexible delivery and pickup problem with time windows , 2013 .
[28] Roel Leus,et al. Resource‐Constrained Project Scheduling for Timely Project Completion with Stochastic Activity Durations , 2007 .
[29] Bijaya K. Panigrahi,et al. Application of Multi-Objective Teaching-Learning-Based Algorithm to an Economic Load Dispatch Problem with Incommensurable Objectives , 2011, SEMCCO.
[30] Jan Karel Lenstra,et al. Scheduling subject to resource constraints: classification and complexity , 1983, Discret. Appl. Math..