Generalized Disjunctive Programming as a Systematic Modeling Framework to Derive Scheduling Formulations
暂无分享,去创建一个
[1] R. Sargent,et al. A general algorithm for short-term scheduling of batch operations */I , 1993 .
[2] R. Raman,et al. Modelling and computational techniques for logic based integer programming , 1994 .
[3] Pedro M. Castro,et al. New Continuous-Time MILP Model for the Short-Term Scheduling of Multistage Batch Plants , 2005 .
[4] Iftekhar A. Karimi,et al. Scheduling multistage, multiproduct batch plants with nonidentical parallel units and unlimited intermediate storage , 2007 .
[5] Thokozani Majozi,et al. A robust mathematical formulation for multipurpose batch plants , 2012 .
[6] Pedro M. Castro,et al. An efficient MILP model for the short-term scheduling of single stage batch plants , 2006, Comput. Chem. Eng..
[7] Aldo R. Vecchietti,et al. Modeling of discrete/continuous optimization problems: characterization and formulation of disjunctions and their relaxations , 2003, Comput. Chem. Eng..
[8] William F. Clocksin,et al. Programming in Prolog , 1987, Springer Berlin Heidelberg.
[9] Nicholas Beaumont,et al. An algorithm for disjunctive programs , 1990 .
[10] A. Barbosa‐Póvoa,et al. Simple Continuous-Time Formulation for Short-Term Scheduling of Batch and Continuous Processes , 2004 .
[11] C. Floudas,et al. Novel Unified Modeling Approach for Short-Term Scheduling , 2009 .
[12] Zdravko Kravanja,et al. Translation of variables and implementation of efficient logic‐based techniques in the MINLP process synthesizer MIPSYN , 2009 .
[13] Christodoulos A. Floudas,et al. Effective Continuous-Time Formulation for Short-Term Scheduling. 2. Continuous and Semicontinuous Processes , 1998 .
[14] Ignacio E. Grossmann,et al. A cutting plane method for solving linear generalized disjunctive programming problems , 2003 .
[15] P. Castro,et al. Two New Continuous-Time Models for the Scheduling of Multistage Batch Plants with Sequence Dependent Changeovers , 2006 .
[16] Aldo R. Vecchietti,et al. Synthesis of Biotechnological Processes Using Generalized Disjunctive Programming , 2004 .
[17] Jie Li,et al. A novel approach to scheduling multipurpose batch plants using unit-slots , 2009 .
[18] I. Grossmann,et al. Logic-based MINLP algorithms for the optimal synthesis of process networks , 1996 .
[19] Laurence A. Wolsey,et al. Integer and Combinatorial Optimization , 1988 .
[20] R. Raman,et al. RELATION BETWEEN MILP MODELLING AND LOGICAL INFERENCE FOR CHEMICAL PROCESS SYNTHESIS , 1991 .
[21] Ignacio E. Grossmann,et al. Logic-Based Outer-Approximation and Benders Decomposition Algorithms for the Synthesis of Process Networks , 1996 .
[22] R. Sargent,et al. A general algorithm for short-term scheduling of batch operations—II. Computational issues , 1993 .
[23] Ignacio E. Grossmann,et al. Decomposition techniques for multistage scheduling problems using mixed-integer and constraint programming methods , 2002 .
[24] Remo Guidieri. Res , 1995, RES: Anthropology and Aesthetics.
[25] Jaime Cerdá,et al. An MILP continuous-time approach to short-term scheduling of resource-constrained multistage flowshop batch facilities , 2001 .
[26] Ignacio E. Grossmann,et al. Systematic Methods of Chemical Process Design , 1997 .
[27] Vipul Jain,et al. Algorithms for Hybrid MILP/CP Models for a Class of Optimization Problems , 2001, INFORMS J. Comput..
[28] P. Castro,et al. Short-Term Scheduling of Multistage Batch Plants with Unlimited Intermediate Storage , 2008 .
[29] Ignacio E. Grossmann,et al. New general continuous-time state-task network formulation for short-term scheduling of multipurpose batch plants , 2003 .
[30] Ignacio E. Grossmann,et al. New General Continuous-Time State−Task Network Formulation for Short-Term Scheduling of Multipurpose Batch Plants , 2003 .
[31] Iftekhar A. Karimi,et al. A simpler better slot-based continuous-time formulation for short-term scheduling in multipurpose batch plants , 2005 .
[32] E. Balas. Disjunctive programming and a hierarchy of relaxations for discrete optimization problems , 1985 .