Analysis of barriers to medical device development in India: an interpretive structural modelling approach
暂无分享,去创建一个
[1] J. H. Linehan,et al. Academic/Industry Challenges for Medical Device Development , 2010, Science Translational Medicine.
[2] Rakesh Kumar,et al. An integrated framework of interpretive structural modeling and graph theory matrix approach to fix the agility index of an automobile manufacturing organization , 2017, Int. J. Syst. Assur. Eng. Manag..
[3] Reinhard German,et al. Technology foresight for medical device development through hybrid simulation: The ProHTA Project , 2015 .
[4] Robert A Malkin,et al. Barriers for medical devices for the developing world , 2007, Expert review of medical devices.
[5] Atul B. Borade,et al. Interpretive structural modeling-based framework for VMI adoption in Indian industries , 2012 .
[6] Ravi Shankar,et al. Information risks management in supply chains: an assessment and mitigation framework , 2007, J. Enterp. Inf. Manag..
[7] Vasdev Malhotra,et al. Modelling and analysis of agile manufacturing system by ISM and MICMAC analysis , 2017, Int. J. Syst. Assur. Eng. Manag..
[8] Cathal Heavey,et al. ISM analysis of CPFR implementation barriers , 2014 .
[9] Yuji Yamamoto,et al. Medical device development in crisis: A movement for technology innovation in health and medicine in Japan , 2010 .
[10] Ravi Shankar,et al. Supply chain risk mitigation: modeling the enablers , 2006, Bus. Process. Manag. J..
[11] J. Ciurana,et al. Designing, prototyping and manufacturing medical devices: an overview , 2014, Int. J. Comput. Integr. Manuf..
[12] Kathryn Cormican,et al. Value chain migration from production to product centred operations: an analysis of the Irish medical device industry , 2006 .
[13] Leslie Monplaisir,et al. Rules modification on a Fuzzy-based modular architecture for medical device design and development , 2012 .
[14] Faisal Talib,et al. Analysis of interaction among the barriers to total quality management implementation using interpretive structural modeling approach , 2011 .
[15] Julie Eatock,et al. An exploratory survey of current practice in the medical device industry , 2009 .
[16] A. Lewis,et al. Barriers to effective product development within SMEs in the medical manufacturing sector , 2001 .
[17] Uday Kumar,et al. Modelling factors affecting human operator failure probability in railway maintenance tasks: an ISM-based analysis , 2015, Int. J. Syst. Assur. Eng. Manag..
[18] Sandeep Grover,et al. Analysis of barriers of total productive maintenance (TPM) , 2013, Int. J. Syst. Assur. Eng. Manag..
[19] Samuel H. Huang,et al. Barrier analysis for product service system using interpretive structural model , 2010 .
[20] Abhijeet K. Digalwar,et al. Interpretive Structural Modeling Approach for Development of Electric Vehicle Market in India , 2015 .
[21] N. Mays,et al. Commissioning healthcare for people with long term conditions: the persistence of relational contracting in England’s NHS quasi-market , 2013, BMC Health Services Research.
[22] Sandeep Grover,et al. An ISM approach for modelling the enablers in the implementation of Total Productive Maintenance (TPM) , 2013, Int. J. Syst. Assur. Eng. Manag..
[23] Sandeep Grover,et al. A graph theoretic approach to evaluate the intensity of barriers in the implementation of total productive maintenance (TPM) , 2014 .
[24] John N. Warfield,et al. Developing Interconnection Matrices in Structural Modeling , 1974, IEEE Trans. Syst. Man Cybern..
[25] Elizabeth Murphy,et al. A user-centred approach to requirements elicitation in medical device development: a case study from an industry perspective. , 2012, Applied ergonomics.
[26] Keith Popplewell,et al. Interpretive structural modelling of risk sources in a virtual organisation , 2011 .
[27] Rodney McAdam,et al. Innovation in the medical device sector: an open business model approach for high-tech small firms , 2011, Technol. Anal. Strateg. Manag..
[28] William Rudelius,et al. New product development process: Stages and successes in the medical products industry , 1997 .
[29] Suman Gothwal,et al. Analyzing the factors affecting the flexibility in FMS using weighted interpretive structural modeling (WISM) approach , 2017, Int. J. Syst. Assur. Eng. Manag..
[30] Gayatri Saberwal,et al. Case studies of innovative medical device companies from India: barriers and enablers to development , 2013, BMC Health Services Research.
[31] Tilak Raj,et al. Modeling and analysis of FMS flexibility factors by TISM and fuzzy MICMAC , 2015, Int. J. Syst. Assur. Eng. Manag..
[32] R. Shankar,et al. ANALYSIS OF INTERACTIONS AMONG THE BARRIERS OF REVERSE LOGISTICS , 2005 .
[33] Yong Geng,et al. An ISM approach for the barrier analysis in implementing green supply chain management , 2013 .
[34] An-Yuan Chang,et al. An ISM-ANP approach to identifying key agile factors in launching a new product into mass production , 2013 .
[35] David Anderson,et al. Proving experience speeds medical device time to market , 2009, 2009 Annual International Conference of the IEEE Engineering in Medicine and Biology Society.
[36] V. Grover,et al. An assessment of survey research in POM: from constructs to theory , 1998 .
[37] Sandeep Grover,et al. Modelling the quality enabled factors of facility layout design stage of production system life cycle , 2017, Int. J. Syst. Assur. Eng. Manag..
[38] Ali H. Diabat,et al. Supply chain risk management and its mitigation in a food industry , 2012 .
[39] B. Mol. Regulation of risk management of medical devices and the role of litigation , 2014 .
[40] J. R. Jadhav,et al. Development of framework for sustainable Lean implementation: an ISM approach , 2014 .
[41] G. Kannan,et al. Analysis of interactions of criteria and sub-criteria for the selection of supplier in the built-in-order supply chain environment , 2007 .
[42] Ganne Umamaheswara Rao. “Made in India”: How’s that for an indigenous medical device? , 2013 .
[43] Shailendra Kumar,et al. An ISM based framework for structural relationship among various manufacturing flexibility dimensions , 2015, Int. J. Syst. Assur. Eng. Manag..
[44] S. Deshmukh,et al. Vendor Selection Using Interpretive Structural Modelling (ISM) , 1994 .
[45] Leslie Monplaisir,et al. Integrated fuzzy-based modular architecture for medical device design and development , 2010 .