Modeling and solving a one-supplier multi-vehicle production-inventory-distribution problem with clustered retailers

This paper considers a supply chain management problem which integrates production, inventory, and distribution decisions. The supply chain is composed of one supplier production facility and several retailers located in a given geographic region. The supplier is responsible for the production and the replenishment of the inventory of retailers, in a vendor managed inventory (VMI) context. The distance between retailers is negligible compared to the distance between the supplier and the retailers’ region. Thus, for each vehicle, there is a major fixed cost for traveling to the cluster of retailers and a minor fixed cost for visiting each individual retailer. The problem consists of determining quantities to be produced, quantities to be delivered to retailers, vehicles to be used, and retailers to be serviced by each vehicle. This problem is an extension of the one warehouse multi-retailer problem with the consideration of production planning and storage and vehicle capacity limitations in addition to fixed vehicle utilization costs and retailer servicing costs. The objective is to minimize a total cost composed of production, transportation, and inventory holding costs at the supplier and at the retailers. Two mixed integer linear programming formulations are proposed and six families of valid inequalities are added to strengthen these formulations. Two of these families are new and the others are adapted from the literature. The numerical results show that the valid inequalities considerably improve the quality of the formulations. Moreover, the parameters that influence the most computational times are analyzed.

[1]  G. D. Eppen,et al.  Solving Multi-Item Capacitated Lot-Sizing Problems Using Variable Redefinition , 1987, Oper. Res..

[2]  S. Goyal,et al.  Models for multi-plant coordination , 1993 .

[3]  Jean-François Cordeau,et al.  The production routing problem: A review of formulations and solution algorithms , 2015, Comput. Oper. Res..

[4]  Luca Bertazzi,et al.  Analysis of the maximum level policy in a production-distribution system , 2011, Comput. Oper. Res..

[5]  AnilyShoshana,et al.  Shipping Multiple Items by Capacitated Vehicles , 2005 .

[6]  Christian Prins,et al.  A reactive GRASP and path relinking for a combined production-distribution problem , 2007, Comput. Oper. Res..

[7]  Jean-François Cordeau,et al.  Optimization-Based Adaptive Large Neighborhood Search for the Production Routing Problem , 2011, Transp. Sci..

[8]  Seyed Hessameddin Zegordi,et al.  Integrating production and transportation scheduling in a two-stage supply chain considering order assignment , 2009 .

[9]  David B. Shmoys,et al.  A constant approximation algorithm for the one-warehouse multi-retailer problem , 2005, SODA '05.

[10]  Hari Prasetyo Comment on “Multiple cycle economic lot and delivery-scheduling problem in a two-echelon supply chain” , 2013 .

[11]  Christian Prins,et al.  A memetic algorithm with dynamic population management for an integrated production-distribution problem , 2009, Eur. J. Oper. Res..

[12]  Jean-François Cordeau,et al.  Efficient Formulations and a Branch-and-Cut Algorithm for a Production-Routing Problem , 2010 .

[13]  Lap Mui Ann Chan,et al.  Effective Zero-Inventory-Ordering Policies for the Single-Warehouse Multiretailer Problem with Piecewise Linear Cost Structures , 2002, Manag. Sci..

[14]  Laurence A. Wolsey,et al.  Production Planning by Mixed Integer Programming , 2010 .

[15]  Haldun Süral,et al.  The one-warehouse multi-retailer problem: reformulation, classification, and computational results , 2012, Ann. Oper. Res..

[16]  Yeong-Dae Kim,et al.  Coordination of inventory and transportation managements in a two-level supply chain , 2010 .

[17]  Yue Jin,et al.  Single‐warehouse multi‐retailer inventory systems with full truckload shipments , 2009 .

[18]  Francesca Fumero,et al.  Synchronized Development of Production, Inventory, and Distribution Schedules , 1999, Transp. Sci..

[19]  Reza Zanjirani Farahani,et al.  A review and critique on integrated production–distribution planning models and techniques , 2013 .

[20]  Awi Federgruen,et al.  Time‐partitioning heuristics: Application to one warehouse, multiitem, multiretailer lot‐sizing problems , 1999 .

[21]  Seyed Ali Torabi,et al.  Multiple cycle economic lot and delivery-scheduling problem in a two-echelon supply chain , 2009 .

[22]  Suresh Goyal,et al.  A review of the joint replenishment problem literature: 1989-2005 , 2008, Eur. J. Oper. Res..

[23]  Douglas J. Thomas,et al.  Coordinated supply chain management , 1996 .

[24]  Laurence A. Wolsey,et al.  MIP formulations and heuristics for two-level production-transportation problems , 2012, Comput. Oper. Res..

[25]  Luca Bertazzi,et al.  Minimizing the Total Cost in an Integrated Vendor—Managed Inventory System , 2005, J. Heuristics.

[26]  Jonathan F. Bard,et al.  A branch-and-price algorithm for an integrated production and inventory routing problem , 2010, Comput. Oper. Res..

[27]  Rakesh Nagi,et al.  A review of integrated analysis of production-distribution systems , 1999 .

[28]  Jonathan F. Bard,et al.  The integrated production–inventory–distribution–routing problem , 2009, J. Sched..

[29]  Marshall L. Fisher,et al.  Coordination of production and distribution planning , 1994 .

[30]  Zhi-Long Chen,et al.  Integrated Production and Outbound Distribution Scheduling: Review and Extensions , 2010, Oper. Res..

[31]  Michal Tzur,et al.  Shipping Multiple Items by Capacitated Vehicles: An Optimal Dynamic Programming Approach , 2005, Transp. Sci..

[32]  Laurence A. Wolsey,et al.  Polyhedra for lot-sizing with Wagner—Whitin costs , 1994, Math. Program..

[33]  Vinícius Amaral Armentano,et al.  A tabu search procedure for coordinating production, inventory and distribution routing problems , 2010, Int. Trans. Oper. Res..

[34]  Yossiri Adulyasak,et al.  Formulations and Branch-and-Cut Algorithms for Multivehicle Production and Inventory Routing Problems , 2012, INFORMS J. Comput..

[35]  Arunachalam Narayanan,et al.  Coordinated deterministic dynamic demand lot-sizing problem: A review of models and algorithms , 2009 .

[36]  E. Arkin,et al.  Computational complexity of uncapacitated multi-echelon production planning problems , 1989 .

[37]  L. Lei,et al.  Optimal business policies for a supplier–transporter–buyer channel with a price-sensitive demand , 2006, J. Oper. Res. Soc..

[38]  Herbert E. Scarf,et al.  Optimal Policies for a Multi-Echelon Inventory Problem , 1960, Manag. Sci..

[39]  Zhi-Long Chen,et al.  Integrated Production and Distribution Operations , 2004 .

[40]  Stéphane Dauzère-Pérès,et al.  A Two-Phase Iterative Heuristic Approach for the Production Routing Problem , 2015, Transp. Sci..

[41]  Arthur M. Geoffrion,et al.  Twenty Years of Strategic Distribution System Design: An Evolutionary Perspective , 1995 .

[42]  Laurence A. Wolsey,et al.  Uncapacitated lot-sizing: The convex hull of solutions , 1984 .