Modeling and solving a one-supplier multi-vehicle production-inventory-distribution problem with clustered retailers
暂无分享,去创建一个
Bernard Penz | Stéphane Dauzère-Pérès | Nadjib Brahimi | Ahmed Senoussi | Nadia Kinza Mouss | B. Penz | S. Dauzère-Pérès | N. Mouss | Ahmed Senoussi | N. Brahimi
[1] G. D. Eppen,et al. Solving Multi-Item Capacitated Lot-Sizing Problems Using Variable Redefinition , 1987, Oper. Res..
[2] S. Goyal,et al. Models for multi-plant coordination , 1993 .
[3] Jean-François Cordeau,et al. The production routing problem: A review of formulations and solution algorithms , 2015, Comput. Oper. Res..
[4] Luca Bertazzi,et al. Analysis of the maximum level policy in a production-distribution system , 2011, Comput. Oper. Res..
[5] AnilyShoshana,et al. Shipping Multiple Items by Capacitated Vehicles , 2005 .
[6] Christian Prins,et al. A reactive GRASP and path relinking for a combined production-distribution problem , 2007, Comput. Oper. Res..
[7] Jean-François Cordeau,et al. Optimization-Based Adaptive Large Neighborhood Search for the Production Routing Problem , 2011, Transp. Sci..
[8] Seyed Hessameddin Zegordi,et al. Integrating production and transportation scheduling in a two-stage supply chain considering order assignment , 2009 .
[9] David B. Shmoys,et al. A constant approximation algorithm for the one-warehouse multi-retailer problem , 2005, SODA '05.
[10] Hari Prasetyo. Comment on “Multiple cycle economic lot and delivery-scheduling problem in a two-echelon supply chain” , 2013 .
[11] Christian Prins,et al. A memetic algorithm with dynamic population management for an integrated production-distribution problem , 2009, Eur. J. Oper. Res..
[12] Jean-François Cordeau,et al. Efficient Formulations and a Branch-and-Cut Algorithm for a Production-Routing Problem , 2010 .
[13] Lap Mui Ann Chan,et al. Effective Zero-Inventory-Ordering Policies for the Single-Warehouse Multiretailer Problem with Piecewise Linear Cost Structures , 2002, Manag. Sci..
[14] Laurence A. Wolsey,et al. Production Planning by Mixed Integer Programming , 2010 .
[15] Haldun Süral,et al. The one-warehouse multi-retailer problem: reformulation, classification, and computational results , 2012, Ann. Oper. Res..
[16] Yeong-Dae Kim,et al. Coordination of inventory and transportation managements in a two-level supply chain , 2010 .
[17] Yue Jin,et al. Single‐warehouse multi‐retailer inventory systems with full truckload shipments , 2009 .
[18] Francesca Fumero,et al. Synchronized Development of Production, Inventory, and Distribution Schedules , 1999, Transp. Sci..
[19] Reza Zanjirani Farahani,et al. A review and critique on integrated production–distribution planning models and techniques , 2013 .
[20] Awi Federgruen,et al. Time‐partitioning heuristics: Application to one warehouse, multiitem, multiretailer lot‐sizing problems , 1999 .
[21] Seyed Ali Torabi,et al. Multiple cycle economic lot and delivery-scheduling problem in a two-echelon supply chain , 2009 .
[22] Suresh Goyal,et al. A review of the joint replenishment problem literature: 1989-2005 , 2008, Eur. J. Oper. Res..
[23] Douglas J. Thomas,et al. Coordinated supply chain management , 1996 .
[24] Laurence A. Wolsey,et al. MIP formulations and heuristics for two-level production-transportation problems , 2012, Comput. Oper. Res..
[25] Luca Bertazzi,et al. Minimizing the Total Cost in an Integrated Vendor—Managed Inventory System , 2005, J. Heuristics.
[26] Jonathan F. Bard,et al. A branch-and-price algorithm for an integrated production and inventory routing problem , 2010, Comput. Oper. Res..
[27] Rakesh Nagi,et al. A review of integrated analysis of production-distribution systems , 1999 .
[28] Jonathan F. Bard,et al. The integrated production–inventory–distribution–routing problem , 2009, J. Sched..
[29] Marshall L. Fisher,et al. Coordination of production and distribution planning , 1994 .
[30] Zhi-Long Chen,et al. Integrated Production and Outbound Distribution Scheduling: Review and Extensions , 2010, Oper. Res..
[31] Michal Tzur,et al. Shipping Multiple Items by Capacitated Vehicles: An Optimal Dynamic Programming Approach , 2005, Transp. Sci..
[32] Laurence A. Wolsey,et al. Polyhedra for lot-sizing with Wagner—Whitin costs , 1994, Math. Program..
[33] Vinícius Amaral Armentano,et al. A tabu search procedure for coordinating production, inventory and distribution routing problems , 2010, Int. Trans. Oper. Res..
[34] Yossiri Adulyasak,et al. Formulations and Branch-and-Cut Algorithms for Multivehicle Production and Inventory Routing Problems , 2012, INFORMS J. Comput..
[35] Arunachalam Narayanan,et al. Coordinated deterministic dynamic demand lot-sizing problem: A review of models and algorithms , 2009 .
[36] E. Arkin,et al. Computational complexity of uncapacitated multi-echelon production planning problems , 1989 .
[37] L. Lei,et al. Optimal business policies for a supplier–transporter–buyer channel with a price-sensitive demand , 2006, J. Oper. Res. Soc..
[38] Herbert E. Scarf,et al. Optimal Policies for a Multi-Echelon Inventory Problem , 1960, Manag. Sci..
[39] Zhi-Long Chen,et al. Integrated Production and Distribution Operations , 2004 .
[40] Stéphane Dauzère-Pérès,et al. A Two-Phase Iterative Heuristic Approach for the Production Routing Problem , 2015, Transp. Sci..
[41] Arthur M. Geoffrion,et al. Twenty Years of Strategic Distribution System Design: An Evolutionary Perspective , 1995 .
[42] Laurence A. Wolsey,et al. Uncapacitated lot-sizing: The convex hull of solutions , 1984 .