Prototype development of an ICT system to support construction management based on virtual models and RFID

There is a need to develop new information and communication technology (ICT) systems with better support of the contractor’s working practice in order to gain more advantages from the virtual models created during the design of buildings. For this reason, a Contextual Design of a prototype (an early example) of an ICT system was carried out to identify and formalise user needs in relation to construction management based on virtual models and radio frequency identification (RFID). The prototype was developed to support working processes in real-time project progress management, quality assurance and inventory management. In this paper a number of user needs for future ICT systems are presented. The needs are captured during the prototype development process and include that future ICT systems must be more user-friendly, enable object-oriented quality assurance procedures, capture data to be used in process optimisation (lean construction), support a wide range of user environments ranging from mobile phones to large displays for presentation and editing data shared in virtual model resources, enable real-time tracking and location of machines and materials, and integrate traditional document/drawing based working practice with the use of virtual models to enable an easier adaptable change process for the construction industry.

[1]  Jakob Nielsen,et al.  Prioritizing Web Usability , 2006 .

[2]  Søren Apelgren,et al.  Snublesten i byggeriet , 2005 .

[3]  P. Draper Reflexive methodology - new vistas for qualitative research: Media Reviews , 2008 .

[4]  Kjeld Svidt,et al.  Ontologies to Support RFID‐Based Link between Virtual Models and Construction Components , 2010, Comput. Aided Civ. Infrastructure Eng..

[5]  Per Christiansson ICT enhanced buildings potentials , 2007 .

[6]  Stefan Woksepp,et al.  Virtual reality in construction : tools, methods and processes , 2007 .

[7]  Sangyoon Chin,et al.  Realtime 4D CAD = RFID for Project Progress Management , 2005 .

[8]  Ivar Jacobson,et al.  The Unified Software Development Process , 1999 .

[9]  Y. Benschop,et al.  Reflexive Methodology, New Vistas for Qualitative Research , 2002 .

[10]  D. Zeltzer,et al.  Simplifying the Programming of Intelligent Environments , 2009 .

[11]  H. Chesbrough Open Business Models: How to Thrive in the New Innovation Landscape , 2006 .

[12]  Martin Fischer,et al.  Method to produce field instructions from product and process models for cast-in-place concrete operations , 2009 .

[13]  Charles M. Eastman,et al.  BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors , 2008 .

[14]  P.-E Josephson,et al.  The causes and costs of defects in construction. A study of seven building projects , 1999 .

[15]  Souheil Soubra,et al.  Virtual Environments for the AEC Sector: The Divercity Experience , 2002 .

[16]  Jan Gulliksen,et al.  Usability Design - Extending Rational Unified Process with a New Discipline , 2003, DSV-IS.

[17]  Rafael Sacks,et al.  Impact of three-dimensional parametric modeling of buildings on productivity in structural engineering practice , 2008 .

[18]  Ygal Bendavid,et al.  Exploring the impact of RFID technology and the EPC network on mobile B2B eCommerce: A case study in the retail industry , 2008 .

[19]  Per Christiansson Integrated Computer Aided Design, Present and Future Data Structures , 1984 .

[20]  李幼升,et al.  Ph , 1989 .

[21]  Karen Holtzblatt,et al.  Contextual design , 1997, INTR.

[22]  Kjeld Svidt,et al.  Radio Frequency Identification in Construction Operation and Maintenance: Contextual Analysis of User Needs , 2008, ICIT 2008.