A reactive-proactive approach for solving dynamic scheduling with time-varying number of Tasks
暂无分享,去创建一个
[1] Philippe Artzner,et al. Coherent Measures of Risk , 1999 .
[2] Sebastian Engell,et al. Risk Management in Production Planning under Uncertainty by Multi-Objective Hybrid Evolutionary Algorithms , 2010 .
[3] Rainer Kolisch,et al. Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem , 2000, Eur. J. Oper. Res..
[4] Berend Roorda. An algorithm for sequential tail value at risk for path-independent payoffs in a binomial tree , 2010, Ann. Oper. Res..
[5] Rosa Blanco,et al. Theoretical and practical fundamentals for multi-objective optimisation in resource-constrained project scheduling problems , 2011, Comput. Oper. Res..
[6] Bernhard Sendhoff,et al. Trade-Off between Performance and Robustness: An Evolutionary Multiobjective Approach , 2003, EMO.
[7] Kalyanmoy Deb,et al. A fast and elitist multiobjective genetic algorithm: NSGA-II , 2002, IEEE Trans. Evol. Comput..
[8] Slawomir Wesolkowski,et al. Multiobjective evolutionary algorithm with risk minimization applied to a fleet mix problem , 2010, IEEE Congress on Evolutionary Computation.
[9] Lothar Thiele,et al. Multiobjective Optimization Using Evolutionary Algorithms - A Comparative Case Study , 1998, PPSN.
[10] Erik Demeulemeester,et al. Proactive heuristic procedures for robust project scheduling: An experimental analysis , 2008, Eur. J. Oper. Res..
[11] Lam Thu BUI,et al. An adaptive approach for solving dynamic scheduling with time-varying number of tasks — Part I , 2011, 2011 IEEE Congress of Evolutionary Computation (CEC).
[12] Jürgen Branke,et al. Evolutionary optimization in uncertain environments-a survey , 2005, IEEE Transactions on Evolutionary Computation.
[13] Jürgen Branke,et al. Evolutionary Optimization in Dynamic Environments , 2001, Genetic Algorithms and Evolutionary Computation.
[14] Ronald Hochreiter,et al. Evolutionary Multi-stage Financial Scenario Tree Generation , 2009, EvoApplications.
[15] Andrzej Jaszkiewicz,et al. Fuzzy Multi-Mode Resource-Constrained Project Scheduling with multiple Objectives , 1999 .
[16] Zbigniew Michalewicz,et al. Adaptation in Dynamic Environments: A Case Study in Mission Planning , 2012, IEEE Transactions on Evolutionary Computation.
[17] Patrizia Beraldi,et al. A heuristic approach for resource constrained project scheduling with uncertain activity durations , 2011, Comput. Oper. Res..
[18] Lothar Thiele,et al. Multiobjective evolutionary algorithms: a comparative case study and the strength Pareto approach , 1999, IEEE Trans. Evol. Comput..
[19] Erik Demeulemeester,et al. Proactive and reactive strategies for resource-constrained project scheduling with uncertain resource availabilities , 2008, J. Sched..
[20] Philippe Fortemps,et al. A hybrid rank-based evolutionary algorithm applied to multi-mode resource-constrained project scheduling problem , 2010, Eur. J. Oper. Res..
[21] Sanja Petrovic,et al. SURVEY OF DYNAMIC SCHEDULING IN MANUFACTURING SYSTEMS , 2006 .
[22] T. B. M. J. Ouarda,et al. Chance-constrained optimal control for multireservoir system optimization and risk analysis , 2001 .
[23] Birger Mo,et al. Integrated risk management of hydro power scheduling and contract management , 2001 .
[24] Hussein A. Abbass,et al. A MULTI-OBJECTIVE RISK-BASED FRAMEWORK FOR MISSION CAPABILITY PLANNING , 2009 .
[25] Yu Yang,et al. Probabilistic modeling and dynamic optimization for performance improvement and risk management of plant-wide operation , 2010, Comput. Chem. Eng..