An economic production quantity model with non-synchronized screening and rework
暂无分享,去创建一个
[1] B. Maddah,et al. Disaggregation and consolidation of imperfect quality shipments in an extended EPQ model , 2012 .
[2] Leopoldo Eduardo Cárdenas-Barrón,et al. The complete solution procedure for the EOQ and EPQ inventory models with linear and fixed backorder costs , 2012, Math. Comput. Model..
[3] Bhaba R. Sarker,et al. Optimal manufacturing batch size with rework process at a single-stage production system , 2004, Comput. Ind. Eng..
[4] Leopoldo Eduardo Cárdenas-Barrón. On optimal batch sizing in a multi-stage production system with rework consideration , 2009, Eur. J. Oper. Res..
[5] P. A. Hayek,et al. Production lot sizing with the reworking of imperfect quality items produced , 2001 .
[6] Leopoldo Eduardo Cárdenas-Barrón,et al. Economic production quantity with rework process at a single-stage manufacturing system with planned backorders , 2009, Comput. Ind. Eng..
[7] Hui-Ming Wee,et al. An alternative analysis and solution procedure for the EPQ model with rework process at a single-stage manufacturing system with planned backorders , 2013, Comput. Ind. Eng..
[8] B. Maddah,et al. Economic order quantity for items with imperfect quality: Revisited , 2008 .
[9] I Gede Agus Widyadana,et al. A production model for deteriorating items with stochastic preventive maintenance time and rework process with FIFO rule , 2013 .
[10] Ata Allah Taleizadeh,et al. A deterministic multi product single machine EPQ model with backordering, scraped products, rework and interruption in manufacturing process , 2014 .
[11] Leopoldo Eduardo Cárdenas-Barrón,et al. The derivation of EOQ/EPQ inventory models with two backorders costs using analytic geometry and algebra , 2011 .
[12] S. Papachristos,et al. Economic ordering quantity models for items with imperfect quality , 2006 .
[13] Meir J. Rosenblatt,et al. Economic Production Cycles with Imperfect Production Processes , 1986 .
[14] M. Omar,et al. An alternative approach to analyze economic ordering quantity and economic production quantity inventory problems using the completing the square method , 2010, Comput. Ind. Eng..
[15] Georghios P. Sphicas,et al. EOQ and EPQ with linear and fixed backorder costs: Two cases identified and models analyzed without calculus , 2006 .
[16] Leopoldo Eduardo Cárdenas-Barrón. On optimal manufacturing batch size with rework process at single-stage production system , 2007, Comput. Ind. Eng..
[17] Yuan-Shyi Peter Chiu,et al. Mathematical modeling for determining the replenishment policy for EMQ model with rework and multiple shipments , 2011, Math. Comput. Model..
[18] Jonas C. P. Yu,et al. Optimal inventory model for items with imperfect quality and shortage backordering , 2007 .
[19] M. K. Salameh,et al. Economic production quantity model for items with imperfect quality , 2000 .
[20] G. Ozdemir,et al. An economic order quantity model with defective items and shortages , 2007 .
[21] Singa Wang Chiu,et al. Optimal production lot sizing with rework, scrap rate, and service level constraint , 2007, Math. Comput. Model..
[22] Ata Allah Taleizadeh,et al. Multiproduct single-machine production system with stochastic scrapped production rate, partial backordering and service level constraint , 2010, J. Comput. Appl. Math..
[23] Bhaba R. Sarker,et al. Optimal batch sizing in a multi-stage production system with rework consideration , 2008, Eur. J. Oper. Res..