A Model for Automated Construction Materials Tracking

[1]  Akintola Akintoye,et al.  Just-in-Time application and implementation for building material management , 1995 .

[2]  Liang Yong,et al.  Application of integrated GPS and GIS technology for reducing construction waste and improving construction efficiency , 2005 .

[3]  Deborah Estrin,et al.  GPS-less low-cost outdoor localization for very small devices , 2000, IEEE Wirel. Commun..

[4]  Iris D. Tommelein,et al.  Pull-Driven Scheduling for Pipe-Spool Installation: Simulation of Lean Construction Technique , 1998 .

[5]  H R Thomas,et al.  LOSS OF CONSTRUCTION LABOR PRODUCTIVITY DUE TO INEFFICIENCIES AND DISRUPTIONS: THE WEIGHT OF EXPERT OPINION , 1990 .

[6]  George Stukhart Construction Materials Management , 1995 .

[7]  Leonhard E. Bernold Bar code−driven equipment and materials tracking for construction , 1990 .

[8]  Frédéric Bosché,et al.  Performance of automated project progress tracking with 3D Data fusion , 2008 .

[9]  Ronie Navon,et al.  A concept proving prototype of automated earthmoving control , 2004 .

[10]  Carlos H. Caldas,et al.  Using Global Positioning System to Improve Materials-Locating Processes on Industrial Projects , 2006 .

[11]  Glenn Shafer,et al.  A Mathematical Theory of Evidence , 2020, A Mathematical Theory of Evidence.

[12]  Ronie Navon,et al.  Can Labor Inputs be Measured and Controlled Automatically , 2003 .

[13]  Lansford C. Bell,et al.  Bar Code Applications in Construction , 1988 .

[14]  Burcu Akinci,et al.  Tracking and locating components in a precast storage yard utilizing radio frequency identification technology and GPS , 2007 .

[15]  Chi Sun Poon,et al.  Reducing building waste at construction sites in Hong Kong , 2004 .

[16]  Harry E. Burke Handbook of Bar-Coding Systems , 1984 .

[17]  Lansford C. Bell,et al.  ATTRIBUTES OF MATERIALS MANAGEMENT SYSTEMS , 1986 .

[18]  Hazem Elzarka,et al.  Development of Pen-Based Computer Field Applications , 1997 .

[19]  Ronie Navon,et al.  An automated model for materials management and control , 2006 .

[20]  Carl T. Haas,et al.  Automated retrieval of project three-dimensional CAD objects in range point clouds to support automated dimensional QA/QC , 2008, J. Inf. Technol. Constr..

[21]  Carlos H. Caldas,et al.  Locating sensor nodes on construction projects , 2007, Auton. Robots.

[22]  Iris D. Tommelein,et al.  Just-in-Time Concrete Delivery: Mapping Alternatives for Vertical Supply Chain Integration , 1999 .

[23]  H. Randolph Thomas,et al.  Impact of Material Management on Productivity—A Case Study , 1989 .

[24]  Lansford C. Bell,et al.  Costs and benefits of materials management systems , 1987 .

[25]  Carlos H. Caldas,et al.  Locating Materials on Construction Site Using Proximity Techniques , 2005 .

[26]  François Peyret,et al.  Asphalt Quality Parameters Tracability Using Electronic Tags and GPS , 2002 .

[27]  Bob McCulloch Automating Field Data Collection in Construction Organizations , 1997 .

[28]  Rafael Sacks,et al.  Building Project Model Support for Automated Labor Monitoring , 2003 .

[29]  Dave Johnson,et al.  How to Do Everything with Your Palm Handheld , 2000 .

[30]  Carlos H. Caldas,et al.  Models For Locating RFID Nodes , 2006 .

[31]  Low Sui Pheng,et al.  Just-in-Time Management of Precast Concrete Components , 2001 .

[32]  Burcu Akinci,et al.  Utilizing Radio-Frequency Identification on Precast Concrete Components - Supplier's Perspective , 2002 .

[33]  Burcu Akinci,et al.  Automating the task of tracking the delivery and receipt of fabricated pipe spools in industrial projects , 2006 .

[34]  H. Randolph Thomas,et al.  Role of the Fabricator in Labor Productivity , 2000 .

[35]  Ronie Navon,et al.  Development and On-Site Evaluation of an Automated Materials Management and Control Model , 2005 .

[36]  James H. Garrett,et al.  Java Inspection Framework: Developing Field Inspection Support Systems for Civil Systems Inspection , 2003 .

[37]  Kamel S. Saidi,et al.  The Value of Handheld Computers in Construction , 2002 .

[38]  Lansford C. Bell,et al.  Measuring Effectiveness of Materials Management Process , 1995 .

[39]  Satoru Iwashita,et al.  The application of PDA as mobile computing system on construction management , 2005 .

[40]  Feniosky Peña-Mora,et al.  MULTIPLE DEVICE COLLABORATIVE AND REAL TIME ANALYSIS SYSTEM FOR PROJECT MANAGEMENT IN CIVIL ENGINEERING , 2002 .

[41]  Carlos H. Caldas,et al.  A proximity-based method for locating RFID tagged objects , 2007, Adv. Eng. Informatics.

[42]  Carlos Torres Formoso,et al.  Improving the materials supply system in small-sized building firms , 1999 .

[43]  Arthur P. Dempster,et al.  A Generalization of Bayesian Inference , 1968, Classic Works of the Dempster-Shafer Theory of Belief Functions.

[44]  Carlos H. Caldas,et al.  Tracking the Location of Materials on Construction Job Sites , 2006 .

[45]  W. Hedgepeth RFID Metrics: Decision Making Tools for Today's Supply Chains , 2006 .

[46]  Edward A. Silver Materials management in large-scale construction projects: Some concerns and research issues , 1989 .

[47]  Lucio Soibelman,et al.  Material Waste in Building Industry: Main Causes and Prevention , 2002 .

[48]  V. Rich Personal communication , 1989, Nature.

[49]  Min-Yuan Cheng,et al.  Integrating barcode and GIS for monitoring construction progress , 2002 .

[50]  Charles T. Jahren,et al.  RADIO-FREQUENCY IDENTIFICATION APPLICATIONS IN CONSTRUCTION INDUSTRY , 1995 .

[51]  Gaetano Borriello Location Sensing Techniques , 2001 .

[52]  Yu-Cheng Lin,et al.  Mobile Construction Supply Chain Management Using PDA and Bar Codes , 2005 .

[53]  Damodara U. Kini Materials Management: The Key to Successful Project Management , 1999 .

[54]  Alan M. Lytle,et al.  Report of the NIST Workshop on Data Exchange Standards at the Construction Job Site , 2003 .

[55]  A N Baldwin,et al.  IMPROVED MATERIALS MANAGEMENT THROUGH BAR-CODING: RESULTS AND IMPLICATIONS FROM A FEASIBILITY STUDY. , 1994 .

[56]  A. Thorpe,et al.  SHERPA: Mobile Wireless Data Capture for Piling Works , 2003 .

[57]  Wenzhong Shi,et al.  Internet-based geographical information systems system for e-commerce application in construction material procurement , 2003 .

[58]  Yong K. Cho,et al.  A PDA and wireless web-integrated system for quality inspection and defect management of apartment housing projects , 2008 .

[59]  William Rasdorf,et al.  Automated Identification Systems — Focus on Bar Coding , 1990 .

[60]  Aminah Robinson Fayek,et al.  Implementation of Automated Site Data Collection with a Medium-Sized Contractor , 1998 .

[61]  David R. Riley,et al.  Fundamental principles of site material management , 2005 .

[62]  Ronie Navon,et al.  FIELD EXPERIMENTS IN AUTOMATED MONITORING OF ROAD CONSTRUCTION , 2005 .

[63]  Frédéric Bosché,et al.  Automated retrieval of 3D CAD model objects in construction range images , 2008 .