Optimal subwork zone operational strategy for short‐term work zone projects in four‐lane two‐way freeways
暂无分享,去创建一个
[1] Paul M Schonfeld,et al. Work Zone Optimization for Multiple-Lane Highway Resurfacing Projects with Time Constraints and Alternate Route , 2006 .
[2] Paul Schonfeld,et al. A Hybrid Methodology for Freeway Work-Zone Optimization With Time Constraints , 2009 .
[3] Seiichi Koakutsu,et al. GENETIC SIMULATED ANNEALING AND APPLICATION TO NON-SLICING FLOORPLAN DESIGN , 1995 .
[4] Patrick T McCoy,et al. Optimum Length of Single-Lane Closures in Work Zones on Rural Four-Lane Freeways , 1998 .
[5] Steven I-Jy Chien,et al. Scheduling Work Zones for Highway Maintenance Projects , 2008 .
[6] Bruce N Janson,et al. MITIGATING CORRIDOR TRAVEL IMPACTS DURING RECONSTRUCTION: AN OVERVIEW OF LITERATURE, EXPERIENCES, AND CURRENT RESEARCH , 1987 .
[7] David R. Martinelli,et al. Delay estimation and optimal length for four-lane divided freeway workzones , 1996 .
[8] Avishai Ceder. An applicatoin of an optimal traffic control during lane closure periods of a two‐lane road , 2000 .
[9] Steven I-Jy Chien,et al. Simulation-based estimates of delays at freeway work zones , 2002 .
[10] Gang-Len Chang,et al. A macroscopic traffic model for highway work zones: Formulations and numerical results , 2006 .
[11] Paul Schonfeld,et al. Optimal work zone lengths for four-lane highways , 2001 .
[12] Hojjat Adeli,et al. Freeway Work Zone Traffic Delay and Cost Optimization Model , 2003 .
[13] Hsin-Yun Lee. Optimizing schedule for improving the traffic impact of work zone on roads , 2009 .
[14] Paul Schonfeld,et al. Work Zone Optimization for Two-Lane Highway Resurfacing Projects with an Alternate Route , 2005 .
[15] Patrick T McCoy,et al. OPTIMUM LENGTH OF TWO-LANE TWO-WAY NO-PASSING TRAFFIC OPERATION IN CONSTRUCTION AND MAINTENANCE ZONES ON RURAL FOUR-LANE DIVIDED HIGHWAYS , 1980 .
[16] Paul Schonfeld,et al. OPTIMAL WORK ZONE LENGTHS FOR TWO-LANE HIGHWAYS , 1999 .