Optimal subwork zone operational strategy for short‐term work zone projects in four‐lane two‐way freeways

SUMMARY Roadside trees in Singapore are regularly trimmed for the purpose of traffic safety and roadside tree-trimming project is one typical type of short-term work zone projects. To implement such a short-term work zone project, contractors usually divide an entire work zone into multiple subwork zones with the uniform length. This paper aims to determine an optimal subwork zone strategy for the short-term work zone projects in four-lane two-way freeways with time window and uniform subwork zone length constraints. The deterministic queuing model is employed to estimate total user delay caused by the work zone project by taking into account variable traffic speeds. Based on the user delay estimations, this paper proceeds to build a minimization model subject to time window and uniform length constraints for the optimal subwork zone strategy problem. This paper also presents a variation of the minimization model to examine the impact of unequal subwork zone length constraint. Since these minimization models belong to the mixed-integer non-differentiable optimization problems, an iterative algorithm embedding with the genetic simulated annealing method is thus proposed to solve these models. Finally, a numerical example is carried out to investigate the effectiveness of the proposed models. Copyright © 2010 John Wiley & Sons, Ltd.

[1]  Paul M Schonfeld,et al.  Work Zone Optimization for Multiple-Lane Highway Resurfacing Projects with Time Constraints and Alternate Route , 2006 .

[2]  Paul Schonfeld,et al.  A Hybrid Methodology for Freeway Work-Zone Optimization With Time Constraints , 2009 .

[3]  Seiichi Koakutsu,et al.  GENETIC SIMULATED ANNEALING AND APPLICATION TO NON-SLICING FLOORPLAN DESIGN , 1995 .

[4]  Patrick T McCoy,et al.  Optimum Length of Single-Lane Closures in Work Zones on Rural Four-Lane Freeways , 1998 .

[5]  Steven I-Jy Chien,et al.  Scheduling Work Zones for Highway Maintenance Projects , 2008 .

[6]  Bruce N Janson,et al.  MITIGATING CORRIDOR TRAVEL IMPACTS DURING RECONSTRUCTION: AN OVERVIEW OF LITERATURE, EXPERIENCES, AND CURRENT RESEARCH , 1987 .

[7]  David R. Martinelli,et al.  Delay estimation and optimal length for four-lane divided freeway workzones , 1996 .

[8]  Avishai Ceder An applicatoin of an optimal traffic control during lane closure periods of a two‐lane road , 2000 .

[9]  Steven I-Jy Chien,et al.  Simulation-based estimates of delays at freeway work zones , 2002 .

[10]  Gang-Len Chang,et al.  A macroscopic traffic model for highway work zones: Formulations and numerical results , 2006 .

[11]  Paul Schonfeld,et al.  Optimal work zone lengths for four-lane highways , 2001 .

[12]  Hojjat Adeli,et al.  Freeway Work Zone Traffic Delay and Cost Optimization Model , 2003 .

[13]  Hsin-Yun Lee Optimizing schedule for improving the traffic impact of work zone on roads , 2009 .

[14]  Paul Schonfeld,et al.  Work Zone Optimization for Two-Lane Highway Resurfacing Projects with an Alternate Route , 2005 .

[15]  Patrick T McCoy,et al.  OPTIMUM LENGTH OF TWO-LANE TWO-WAY NO-PASSING TRAFFIC OPERATION IN CONSTRUCTION AND MAINTENANCE ZONES ON RURAL FOUR-LANE DIVIDED HIGHWAYS , 1980 .

[16]  Paul Schonfeld,et al.  OPTIMAL WORK ZONE LENGTHS FOR TWO-LANE HIGHWAYS , 1999 .