Integrated engineering environment for the process FEED of offshore oil and gas production plants
暂无分享,去创建一个
[1] C. C. Yang,et al. Offshore LNG: The Perfect Starting Point for the 2-Phase Expander? , 2006 .
[2] 서용석,et al. 고정식 해양구조물의 피로수명예측에 대한 신뢰성해석 , 1998 .
[3] Kyu-Yeul Lee,et al. Optimized Methodology to Build an Integrated Solution to Offshore Topside Process Engineering , 2008 .
[4] Joa˜o Paulo J. Matsuura,et al. Routes to Large Amplitude Motions of Mooring Systems Due to Slowly-Varying Drift , 2004 .
[5] Ho-Young Lee,et al. Hydroelastic Responses for a Very Large Floating Structure with a Breakwater , 2001 .
[6] Bernt J. Leira,et al. FLOATING PRODUCTION SYSTEMS , 2009 .
[7] J. N. Newman,et al. Boundary-Element Methods In Offshore Structure Analysis , 2002 .
[8] 조석규,et al. 초대형 부유식 구조물의 돌핀-펜더계류시스템에 관한 실험연구 , 2005 .
[9] Armin W. Troesch,et al. Hydrodynamic Coefficient Estimation for TLP and Spar Structures , 2000 .