Corrective Maintenance Timetable in Restructured Distribution Environment

Outsourcing of maintenance activities from the core distribution operator business prompted the reorganization of the operations sequence of activities and affects, to some extent, the reliability of the distribution network. Repair times, a major component in the reliability calculations, arrive to a new understanding from operations point of view and the adequacy of established probabilistic representations has to be assessed. This paper proposes a mechanism to identify the layout of the sequence of activities for distribution component repair, resulting from reorganization, and revises the adequate representation of the times associated with various stages of the derived repair process. Statistical-based techniques employing estimates of distribution parameters and hypothesis testing serve to determine probabilistic distributions. The validity of the independence assumption for the random variables associated with individual times which compose the repair time is checked via statistical methods in order to confirm applicability of probabilistic-based calculations. By means of such a mechanism, an objective analysis of the time components of the repair time can be conducted, such as areas of improvement, and can be outlined. The results obtained for a large real power distribution system are presented

[1]  R.E. Brown,et al.  A cost-effective approach of prioritizing distribution maintenance based on system reliability , 2004, IEEE Transactions on Power Delivery.

[2]  M. Schmieg,et al.  Reliability assessment in electrical power systems: the Weibull-Markov stochastic model , 1999, 1999 IEEE Industrial and Commercial Power Systems Technical Conference (Cat. No.99CH36371).

[3]  G. Chicco,et al.  Evaluation of the probability density functions of distribution system reliability indices with a characteristic functions-based approach , 2004, IEEE Transactions on Power Systems.

[4]  John G. Proakis,et al.  Probability, random variables and stochastic processes , 1985, IEEE Trans. Acoust. Speech Signal Process..

[5]  Magdy M. A. Salama,et al.  Resistance formulas of grounding systems in two-layer earth , 1996 .

[6]  J. Endrenyi,et al.  The Present Status of Maintenance Strategies and the Impact of Maintenance on Reliability , 2001, IEEE Power Engineering Review.

[7]  Adamantios Mettas,et al.  System reliability analysis: the advantages of using analytical methods to analyze non-repairable systems , 2001, Annual Reliability and Maintainability Symposium. 2001 Proceedings. International Symposium on Product Quality and Integrity (Cat. No.01CH37179).

[8]  Roy Billinton,et al.  Reliability evaluation of power systems , 1984 .

[9]  S. S. Venkata,et al.  Automated primary distribution system design: reliability and cost optimization , 1996 .

[10]  Jarmo Partanen,et al.  A practical approach for estimating future outage costs in power distribution networks , 1990 .

[11]  P. Jourda,et al.  Evaluating the Availability of Electrical Substations: A Dynamic Methodology , 1996, IEEE Power Engineering Review.

[12]  A. P. Hanson,et al.  Impact of Two-Stage Service Restoration on Distribution Reliability , 2001, IEEE Power Engineering Review.

[13]  S. S. Venkata,et al.  Distribution System Reliability Assessment Using Hierarchical Markov Modeling , 1996, IEEE Power Engineering Review.

[14]  K. Sand,et al.  RELRAD-an analytical approach for distribution system reliability assessment , 1991, Proceedings of the 1991 IEEE Power Engineering Society Transmission and Distribution Conference.

[15]  Christos Douligeris,et al.  Analysis of the service restoration operations of a large rural utility company , 1995, 1995 Rural Electric Power Conference.

[16]  Richard E. Brown,et al.  Electric Power Distribution Reliability , 2002 .

[17]  Enrico Carpaneto,et al.  Probabilistic characterization of restoration times for a large real distribution system , 2004 .

[18]  Bruno O. Shubert,et al.  Random variables and stochastic processes , 1979 .

[19]  Mo-Yuen Chow,et al.  Time of outage restoration analysis in distribution systems , 1996 .