Controllable lead time, service level constraint, and transportation discounts in a continuous review inventory model

This paper studies two models based on the distribution of lead time demand. The first model assumes a normally distributed lead time demand and the second assumes that there is no specific distribution for lead time demand, but it is with known mean and standard deviation. The continuous-review inventory model is used for both cases. Transportation cost is dependent on the ordered quantity i . e ., how much quantity buyer orders for delivery, based on that, a transportation discount is used to reduce the total cost. Service level constraint is included in this model to avoid backorder cost. Two efficient lemmas are established to obtain the optimum solution of the model. The expected value of additional information (EVAI) is calculated to show the excess amount needed for the distribution free case. Some numerical examples and sensitivity analysis are given to illustrate the model.

[1]  Mirza Arif Mekhtiev Analytical evaluation of lead-time demand in polytree supply chains with uncertain demand, lead-time and inter-demand time , 2013 .

[2]  Kripa Shanker,et al.  An integrated inventory problem with transportation in a divergent supply chain under service level constraint , 2014 .

[3]  Etsuko Kusukawa,et al.  Optimal Production Planning for Remanufacturing with Quality Classification Errors under Uncertainty in Quality of Used Products , 2014 .

[4]  G. Gallego,et al.  The Distribution Free Newsboy Problem: Review and Extensions , 1993 .

[5]  Suresh Kumar Goyal,et al.  A heuristic solution procedure for an integrated inventory system under controllable lead-time with equal or unequal sized batch shipments between a vendor and a buyer , 2006 .

[6]  Manuel D. Rossetti,et al.  Evaluating the robustness of lead time demand models , 2011 .

[7]  Yu-Chung Tsao,et al.  A supply chain network design considering transportation cost discounts , 2012 .

[8]  Shine-Der Lee,et al.  Joint production and delivery lot sizing for a make-to-order producer–buyer supply chain with transportation cost , 2014 .

[9]  Biswajit Sarkar,et al.  Periodic review fuzzy inventory model with variable lead time and fuzzy demand , 2017, Int. Trans. Oper. Res..

[10]  Anthony S.F. Chiu,et al.  Implementation and Performance Evaluation of a Firm`s Green Supply Chain Management under Uncertainty , 2014 .

[11]  Liang-Yuh Ouyang,et al.  Integrated vendor-buyer cooperative inventory models with controllable lead time and ordering cost reduction , 2006, Eur. J. Oper. Res..

[12]  Wen-Chuan Lee,et al.  Computational algorithm for inventory model with a service level constraint, lead time demand with the mixture of distributions and controllable negative exponential backorder rate , 2006, Appl. Math. Comput..

[13]  Ilkyeong Moon,et al.  Manufacturing setup cost reduction and quality improvement for the distribution free continuous-review inventory model with a service level constraint , 2015 .

[14]  Gino K. Yang,et al.  Inventory models with variable lead time and present value , 2005, Eur. J. Oper. Res..

[15]  Bhaba R. Sarker,et al.  An operational policy for an integrated inventory system under consignment stock policy with controllable lead time and buyers' space limitation , 2013, Comput. Oper. Res..

[16]  Min-Chiang Wang,et al.  Estimating the lead-time demand distribution when the daily demand is non-normal and autocorrelated Hon-Shiang LAU , 1987 .

[17]  Kripa Shanker,et al.  Two-echelon supply chain inventory model with controllable lead time and service level constraint , 2009, Comput. Ind. Eng..

[18]  R. Uthayakumar,et al.  Two-echelon multi-product multi-constraint product returns inventory model with permissible delay in payments and variable lead time , 2015 .

[19]  Ilkyeong Moon,et al.  Min-max distribution free continuous-review model with a service level constraint and variable lead time , 2014, Appl. Math. Comput..

[20]  Ata Allah Taleizadeh,et al.  Multiproduct single-machine production system with stochastic scrapped production rate, partial backordering and service level constraint , 2010, J. Comput. Appl. Math..

[21]  Keng Lin Soh,et al.  Improving Traffic Infrastructure in a Developing Country: An Investigation into the Usage of Public Bus Transport in Malaysia , 2014 .

[22]  R. Uthayakumar,et al.  Trade credit financing in the vendor–buyer inventory system with ordering cost reduction, transportation cost and backorder price discount when the received quantity is uncertain , 2014 .

[23]  Dmitry Krass,et al.  Inventory models with minimal service level constraints , 2001, Eur. J. Oper. Res..

[24]  Mohammad Asghari,et al.  Reverse Logistics Network Design with Incentive-Dependent Return , 2014 .

[25]  Ilkyeong Moon,et al.  The distribution free continuous review inventory system with a service level constraint , 1994 .

[26]  Biswajit Sarkar,et al.  Integrated vendor-buyer supply chain model with vendor's setup cost reduction , 2013, Appl. Math. Comput..

[27]  G. Gallego,et al.  Distribution Free Procedures for Some Inventory Models , 1994 .

[28]  Deng Qiang,et al.  DCBA-DEA: A Monte Carlo Simulation Optimization Approach for Predicting an Accurate Technical Efficiency in Stochastic Environment , 2014 .

[29]  B. Sarkar,et al.  Quality improvement and backorder price discount under controllable lead time in an inventory model , 2015 .

[30]  Wen-Chuan Lee,et al.  Computational algorithmic procedure of optimal inventory policy involving a negative exponential crashing cost and variable lead time demand , 2007, Appl. Math. Comput..

[31]  B. Sarkar,et al.  Improved quality, setup cost reduction, and variable backorder costs in an imperfect production process , 2014 .

[32]  Benjamin Lev,et al.  More-for-less algorithm for fixed-charge transportation problems , 2007 .

[33]  Rob J. Hyndman,et al.  Exponential smoothing models: Means and variances for lead-time demand , 2004, Eur. J. Oper. Res..

[34]  Seyed Reza Hejazi,et al.  Coordinating orders in a two echelon supply chain with controllable lead time and ordering cost using the credit period , 2012, Comput. Ind. Eng..