Bulk power risk analysis: Ranking infrastructure elements according to their risk significance

Abstract Disruptions in the bulk power grid can result in very diverse consequences that include economic, social, physical, and psychological impacts. In addition, power outages do not affect all end-users of the system in the same manner. For these reasons, a risk analysis of bulk power systems requires more than determining the likelihood and magnitude of power outages; it must also include the diverse impacts power outages have on the users of the system. We propose a methodology for performing a risk analysis on the bulk power system. A power flow simulation model is used to determine the likelihood and extent of power outages when components within the system fail to perform their designed function. The consequences associated with these failures are determined by looking at the type and number of customers affected. Stakeholder input is used to evaluate the relative importance of these consequences. The methodology culminates with a ranking of each system component by its risk significance to the stakeholders. The analysis is performed for failures of infrastructure elements due to both random causes and malevolent acts.

[1]  Daniel S. Kirschen,et al.  Criticality in a cascading failure blackout model , 2006 .

[2]  Robert T. Clemen,et al.  Making Hard Decisions: An Introduction to Decision Analysis , 1997 .

[3]  George E. Apostolakis,et al.  Deliberation: Integrating Analytical Results into Environmental Decisions Involving Multiple Stakeholders , 1998 .

[4]  John C. McDonald,et al.  Confronting the risks of terrorism: making the right decisions , 2004, Reliab. Eng. Syst. Saf..

[5]  Ian Dobson,et al.  Evidence for self-organized criticality in electric power system blackouts , 2001, Proceedings of the 34th Annual Hawaii International Conference on System Sciences.

[6]  David Michaud Screening vulnerabilities in water supply networks : risk analysis of infrastructure systems , 2005 .

[7]  J. Salmeron,et al.  Analysis of electric grid security under terrorist threat , 2004, IEEE Transactions on Power Systems.

[8]  Shin Ta Liu,et al.  Risk Modeling, Assessment, and Management , 1999, Technometrics.

[9]  Seth D. Guikema,et al.  Probabilistic Modeling of Terrorist Threats: A Systems Analysis Approach to Setting Priorities Among Countermeasures , 2002 .

[10]  V. E. Lynch,et al.  Critical points and transitions in an electric power transmission model for cascading failure blackouts. , 2002, Chaos.

[11]  Roy Jensen,et al.  Reliability Modeling in Electric Power Systems , 1979 .

[12]  S. Kaplan,et al.  On The Quantitative Definition of Risk , 1981 .

[13]  James S. Thorp,et al.  Analysis of electric power system disturbance data , 2001, Proceedings of the 34th Annual Hawaii International Conference on System Sciences.

[14]  Rae Zimmerman,et al.  Electricity Case: Main Report- Risk, Consequences, and Economic Accounting , 2005 .

[15]  M. Cheok,et al.  Use of importance measures in risk-informed regulatory applications , 1998 .

[16]  Mohammad Shahidehpour,et al.  The IEEE Reliability Test System-1996. A report prepared by the Reliability Test System Task Force of the Application of Probability Methods Subcommittee , 1999 .

[17]  George E. Apostolakis,et al.  Identification of critical locations across multiple infrastructures for terrorist actions , 2007, Reliab. Eng. Syst. Saf..

[18]  David Michaud,et al.  Methodology for Ranking the Elements of Water-Supply Networks , 2006 .

[19]  Luca Podofillini,et al.  A combination of Monte Carlo simulation and cellular automata for computing the availability of complex network systems , 2006, Reliab. Eng. Syst. Saf..

[20]  Vicki M. Bier,et al.  Methodology for identifying near-optimal interdiction strategies for a power transmission system , 2007, Reliab. Eng. Syst. Saf..

[21]  C. M. Fallon,et al.  Value-based reliability transmission planning , 1996 .

[22]  Ian Dobson,et al.  Initial evidence for self-organized criticality in electric power system blackouts , 2000, Proceedings of the 33rd Annual Hawaii International Conference on System Sciences.

[23]  M. Greenberg,et al.  Impact to New Jersey's Economy of the Loss of Electric Power in New Jersey's Urban Industrial Corridor , 2005 .

[24]  George E Apostolakis,et al.  How Useful Is Quantitative Risk Assessment? , 2004, Risk analysis : an official publication of the Society for Risk Analysis.

[25]  George E Apostolakis,et al.  A Screening Methodology for the Identification and Ranking of Infrastructure Vulnerabilities Due to Terrorism , 2005, Risk analysis : an official publication of the Society for Risk Analysis.

[26]  Thomas L. Saaty Fundamentals of decision making and priority theory , 2000 .

[27]  D. M. Karydas,et al.  A method for the efficient prioritization of infrastructure renewal projects , 2006, Reliab. Eng. Syst. Saf..