Modeling fuzzy multi-period production planning and sourcing problem with credibility service levels

A great deal of research has been done on production planning and sourcing problems, most of which concern deterministic or stochastic demand and cost situations and single period systems. In this paper, we consider a new class of multi-period production planning and sourcing problem with credibility service levels, in which a manufacturer has a number of plants and subcontractors and has to meet the product demand according to the credibility service levels set by its customers. In the proposed problem, demands and costs are uncertain and assumed to be fuzzy variables with known possibility distributions. The objective of the problem is to minimize the total expected cost, including the expected value of the sum of the inventory holding and production cost in the planning horizon. Because the proposed problem is too complex to apply conventional optimization algorithms, we suggest an approximation approach (AA) to evaluate the objective function. After that, two algorithms are designed to solve the proposed production planning problem. The first is a PSO algorithm combining the AA, and the second is a hybrid PSO algorithm integrating the AA, neural network (NN) and PSO. Finally, one numerical example is provided to compare the effectiveness of the proposed two algorithms.

[1]  Reay-Chen Wang,et al.  Aggregate production planning with multiple objectives in a fuzzy environment , 2001, Eur. J. Oper. Res..

[2]  Fikri Karaesmen,et al.  A multiperiod stochastic production planning and sourcing problem with service level constraints , 2005 .

[3]  D. Clay Whybark,et al.  MATERIAL REQUIREMENTS PLANNING UNDER UNCERTAINTY , 1976 .

[4]  Costas D. Maranas,et al.  Managing demand uncertainty in supply chain planning , 2003, Comput. Chem. Eng..

[5]  Jay R. Galbraith Designing Complex Organizations , 1973 .

[6]  Baoding Liu,et al.  A survey of credibility theory , 2006, Fuzzy Optim. Decis. Mak..

[7]  M. Gen,et al.  Method for solving multiobjective aggregate production planning problem with fuzzy parameters , 1992 .

[8]  Radivoj Petrovic,et al.  Supply chain modelling using fuzzy sets , 1999 .

[9]  H. Gfrerer,et al.  Hierarchical model for production planning in the case of uncertain demand , 1995 .

[10]  L. Zadeh Fuzzy sets as a basis for a theory of possibility , 1999 .

[11]  Chrwan-Jyh Ho,et al.  Evaluating the impact of operating environments on MRP system nervousness , 1989 .

[12]  James Kennedy,et al.  Particle swarm optimization , 2002, Proceedings of ICNN'95 - International Conference on Neural Networks.

[13]  Yian-Kui Liu,et al.  Expected value of fuzzy variable and fuzzy expected value models , 2002, IEEE Trans. Fuzzy Syst..

[14]  Yan-Fei Lan,et al.  A multiperiod fuzzy production planning and sourcing problem with service level constraints , 2008, 2008 International Conference on Machine Learning and Cybernetics.

[15]  Yue Wu,et al.  Production , Manufacturing and Logistics A robust optimization model for multi-site production planning problem in an uncertain environment , 2007 .

[16]  G. Zäpfel Production planning in the case of uncertain individual demand Extension for an MRP II concept , 1996 .

[17]  Mauro Birattari,et al.  Swarm Intelligence , 2012, Lecture Notes in Computer Science.

[18]  Alfred Büchel,et al.  Stochastic material requirements planning for optional parts , 1983 .

[19]  Y.-K. Liu,et al.  Convergent results about the use of fuzzy simulation in fuzzy optimization problems , 2006, IEEE Transactions on Fuzzy Systems.

[20]  Dennis Kira,et al.  A stochastic linear programming approach to hierarchical production planning , 1997 .

[21]  Baoding Liu Uncertainty Theory: An Introduction to its Axiomatic Foundations , 2004 .

[22]  Didier Dubois,et al.  Possibility theory , 2018, Scholarpedia.

[23]  Jinwu Gao,et al.  The Independence of Fuzzy Variables with Applications to Fuzzy Random Optimization , 2007, Int. J. Uncertain. Fuzziness Knowl. Based Syst..

[24]  Gabriel R. Bitran,et al.  Deterministic Approximations to Stochastic Production Problems , 1984, Oper. Res..

[25]  Li-Hsing Shih,et al.  CEMENT TRANSPORTATION PLANNING VIA FUZZY LINEAR PROGRAMMING , 1999 .

[26]  Wayne J. Davis,et al.  An integrated approach for modeling uncertainty in aggregate production planning , 1990, IEEE Trans. Syst. Man Cybern..

[27]  Peter Kelle,et al.  Economic lot scheduling heuristic for random demands , 1994 .

[28]  Hans-Jürgen Zimmermann,et al.  Possibility distributions of fuzzy decision variables obtained from possibilistic linear programming problems , 2000, Fuzzy Sets Syst..

[29]  Y. Dong,et al.  An application of swarm optimization to nonlinear programming , 2005 .