Requirement or Promise? An Analysis of the First‐Mover Advantage in Quality Contracting

Quality contracting is critical and challenging due to the many unique issues related to quality. In this study, we analyze the first-mover right in quality contracting by considering two different strategies for the buyer: the quality requirement strategy (QR) where buyer moves first by posting quality requirement to suppliers and quality promise strategy (QP) where buyer voluntarily gives up the first-mover right to suppliers to ask them to promise quality. We study which strategy (1) better encourages suppliers' quality improvement efforts and (2) leads to a higher expected profit for the buyer. To analyze the drivers behind the buyer's choice between QR and QP, we start with the basic model where buyer faces only one supplier who has the opportunity to make quality improvements. We then gradually add other business features such as information asymmetry and supplier competition, analyzing how each feature adds/changes the driving forces and how they interact in the buyer's decision between QR and QP. We consider both the case where the wholesale price is fixed (when the buyer has the power to dictate price or price is set by the market) and the case where the wholesale price is included as a variable (when price is part of the negotiation). We find that QP always leads to the first-best quality efforts from the supplier(s) while QR limits their efforts. However, this does not guarantee higher expected profit for the buyer under QP. We provide insightful guidelines in buyer's choice between QP and QR. This research enriches the limited literature on quality contracting with quality improvement opportunity and asymmetric information

[1]  Lode Li The role of inventory in delivery-time competition , 1992 .

[2]  Damian R. Beil,et al.  RFQ Auctions with Supplier Qualification Screening , 2009, Oper. Res..

[3]  Wei Shi Lim,et al.  Producer-Supplier Contracts with Incomplete Information , 2001, Manag. Sci..

[4]  Hau L. Lee,et al.  Economic Models for Vendor Evaluation with Quality Cost Analysis , 1996 .

[5]  C. Tapiero,et al.  The delivery and control of quality in supplier-producer contracts , 1995 .

[6]  Meir J. Rosenblatt,et al.  Simultaneous determination of production cycle and inspection schedules in a production system , 1987 .

[7]  Paul E. Fischer,et al.  Information, Contracting, and Quality Costs , 2000 .

[8]  S. C. Choi,et al.  Price Competition in a Channel Structure with a Common Retailer , 1991 .

[9]  Lu Hsiao,et al.  Returns Policy and Quality Risk in E-Business , 2010 .

[10]  Jennifer F. Reinganum,et al.  INCOME TAX COMPLIANCE IN A PRINCIPAL-AGENT FRAMEWORK , 1985 .

[11]  Rajiv D. Banker,et al.  Quality and Competition , 1998 .

[12]  M. Kopel,et al.  Commitment, first-mover-, and second-mover advantage , 2007 .

[13]  Mohammad E. Nikoofal,et al.  The Value of Audit in Managing Supplier’s Process Improvement , 2015 .

[14]  Gilvan C. Souza,et al.  How Does Product Recovery Affect Quality Choice? , 2013 .

[15]  Albert Y. Ha,et al.  Price and Delivery Logistics Competition in a Supply Chain , 2003, Manag. Sci..

[16]  Kim C. Border,et al.  Samurai Accountant: A Theory of Auditing and Plunder , 1987 .

[17]  Evan L. Porteus Note-The Impact of Inspection Delay on Process and Inspection Lot Sizing , 1990 .

[18]  Fugee Tsung,et al.  Pushing Quality Improvement Along Supply Chains , 2007, Manag. Sci..

[19]  S. Sethi,et al.  Contracting and Coordination Under Asymmetric Production Cost Information , 2010 .

[20]  Hau L. Lee,et al.  Lot sizing to reduce capacity utilization in a production process with defective items, process corrections, and rework , 1992 .

[21]  S. Dowrick,et al.  von Stackelberg and Cournot duopoly: choosing roles , 1986 .

[22]  John G. Riley,et al.  Silver Signals: Twenty-Five Years of Screening and Signaling , 2001 .

[23]  Evan L. Porteus Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction , 1986, Oper. Res..

[24]  E. Gal‐Or,et al.  First Mover and Second Mover Advantages , 1985 .

[25]  Yifan Xu,et al.  Competitive and Collaborative Quality and Warranty Management in Supply Chains , 2012 .

[26]  S. Andrew Starbird Acceptance Sampling, Imperfect Production, and the Optimality of Zero Defects , 1997 .

[27]  Karen Donohue,et al.  Outsourcing via Service Competition , 2007 .

[28]  Gary H. Chao,et al.  Quality Improvement Incentives and Product Recall Cost Sharing Contracts , 2009, Manag. Sci..

[29]  Fangruo Chen,et al.  Information Sharing and Supply Chain Coordination , 2003, Supply Chain Management.

[30]  Fuqiang Zhang,et al.  Procuring Fast Delivery: Sole Sourcing with Information Asymmetry , 2006, Manag. Sci..