Requirement or Promise? An Analysis of the First‐Mover Advantage in Quality Contracting
暂无分享,去创建一个
Hui Zhao | Kwei Tang | Xinghao Yan | Hui Zhao | K. Tang | Xinghao Yan
[1] Lode Li. The role of inventory in delivery-time competition , 1992 .
[2] Damian R. Beil,et al. RFQ Auctions with Supplier Qualification Screening , 2009, Oper. Res..
[3] Wei Shi Lim,et al. Producer-Supplier Contracts with Incomplete Information , 2001, Manag. Sci..
[4] Hau L. Lee,et al. Economic Models for Vendor Evaluation with Quality Cost Analysis , 1996 .
[5] C. Tapiero,et al. The delivery and control of quality in supplier-producer contracts , 1995 .
[6] Meir J. Rosenblatt,et al. Simultaneous determination of production cycle and inspection schedules in a production system , 1987 .
[7] Paul E. Fischer,et al. Information, Contracting, and Quality Costs , 2000 .
[8] S. C. Choi,et al. Price Competition in a Channel Structure with a Common Retailer , 1991 .
[9] Lu Hsiao,et al. Returns Policy and Quality Risk in E-Business , 2010 .
[10] Jennifer F. Reinganum,et al. INCOME TAX COMPLIANCE IN A PRINCIPAL-AGENT FRAMEWORK , 1985 .
[11] Rajiv D. Banker,et al. Quality and Competition , 1998 .
[12] M. Kopel,et al. Commitment, first-mover-, and second-mover advantage , 2007 .
[13] Mohammad E. Nikoofal,et al. The Value of Audit in Managing Supplier’s Process Improvement , 2015 .
[14] Gilvan C. Souza,et al. How Does Product Recovery Affect Quality Choice? , 2013 .
[15] Albert Y. Ha,et al. Price and Delivery Logistics Competition in a Supply Chain , 2003, Manag. Sci..
[16] Kim C. Border,et al. Samurai Accountant: A Theory of Auditing and Plunder , 1987 .
[17] Evan L. Porteus. Note-The Impact of Inspection Delay on Process and Inspection Lot Sizing , 1990 .
[18] Fugee Tsung,et al. Pushing Quality Improvement Along Supply Chains , 2007, Manag. Sci..
[19] S. Sethi,et al. Contracting and Coordination Under Asymmetric Production Cost Information , 2010 .
[20] Hau L. Lee,et al. Lot sizing to reduce capacity utilization in a production process with defective items, process corrections, and rework , 1992 .
[21] S. Dowrick,et al. von Stackelberg and Cournot duopoly: choosing roles , 1986 .
[22] John G. Riley,et al. Silver Signals: Twenty-Five Years of Screening and Signaling , 2001 .
[23] Evan L. Porteus. Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction , 1986, Oper. Res..
[24] E. Gal‐Or,et al. First Mover and Second Mover Advantages , 1985 .
[25] Yifan Xu,et al. Competitive and Collaborative Quality and Warranty Management in Supply Chains , 2012 .
[26] S. Andrew Starbird. Acceptance Sampling, Imperfect Production, and the Optimality of Zero Defects , 1997 .
[27] Karen Donohue,et al. Outsourcing via Service Competition , 2007 .
[28] Gary H. Chao,et al. Quality Improvement Incentives and Product Recall Cost Sharing Contracts , 2009, Manag. Sci..
[29] Fangruo Chen,et al. Information Sharing and Supply Chain Coordination , 2003, Supply Chain Management.
[30] Fuqiang Zhang,et al. Procuring Fast Delivery: Sole Sourcing with Information Asymmetry , 2006, Manag. Sci..