Joint market bid of a hydroelectric system and wind parks

Abstract This paper presents the model for finding an optimal joint bid of hydroelectric systems and wind parks on a day-ahead electricity market. The optimization problem is presented as a two-stage model where the goal of the first stage is to maximize the profit according to the main scenario and the obtained production plan is then tested in all other scenarios that can occur in the second stage where the goal is to minimize the profit reduction caused by imbalance penalties or changes in expected day-ahead prices. The optimization procedure is presented as a mixed integer linear optimization problem. The proposed model is applied in a case study in order to present the main model features. Production assembly in the case study is based on real power plants and consists of two cascade hydropower plants and two wind parks.

[1]  S. Stamataki,et al.  Introduction of a wind powered pumped storage system in the isolated insular power system of Karpathos-Kasos , 2012 .

[2]  Zechun Hu,et al.  Rolling Optimization of Wind Farm and Energy Storage System in Electricity Markets , 2015, IEEE Transactions on Power Systems.

[3]  A.M. Gonzalez,et al.  Stochastic Joint Optimization of Wind Generation and Pumped-Storage Units in an Electricity Market , 2008, IEEE Transactions on Power Systems.

[4]  A. Conejo,et al.  Evaluating alternative offering strategies for wind producers in a pool , 2011 .

[5]  Julio Usaola,et al.  Combined hydro-wind generation bids in a pool-based electricity market , 2009 .

[6]  Julio Usaola,et al.  Combining hydro-generation and wind energy: Biddings and operation on electricity spot markets , 2007 .

[7]  Patrick Siarry,et al.  Multi-objective optimization and energy management in renewable based AC/DC microgrid , 2018, Comput. Electr. Eng..

[8]  J. Catalão,et al.  Optimal Single Wind Hydro-Pump Storage Bidding in Day-Ahead Markets Including Bilateral Contracts , 2016, IEEE Transactions on Sustainable Energy.

[9]  Rui Melício,et al.  Optimal Coordination on Wind-Pumped-Hydro Operation , 2014 .

[10]  John K. Kaldellis,et al.  Combining hydro and variable wind power generation by means of pumped-storage under economically viable terms , 2010 .

[11]  K. A. Kavadias,et al.  Energy balance analysis of wind-based pumped hydro storage systems in remote island electrical networks , 2010 .

[12]  S. Nikolovski,et al.  Short–Term Planning of Hybrid Power System , 2016 .

[13]  Zechun Hu,et al.  Optimal intra-day coordination of wind farm and pumped-hydro-storage plant , 2014, 2014 IEEE PES General Meeting | Conference & Exposition.

[14]  Semra Öztürk,et al.  Turkey's long-term generation expansion planning with the inclusion of renewable-energy sources , 2014, Comput. Electr. Eng..

[15]  Michael C. Georgiadis,et al.  Optimal energy planning and scheduling of microgrids , 2017 .

[16]  A. Borghetti,et al.  An MILP Approach for Short-Term Hydro Scheduling and Unit Commitment With Head-Dependent Reservoir , 2008, IEEE Transactions on Power Systems.

[17]  Danijel Topić,et al.  Reliability model of different wind power plant configuration using sequential Monte Carlo simulation , 2016 .

[18]  Stefanos V. Papaefthymiou,et al.  A Wind-Hydro-Pumped Storage Station Leading to High RES Penetration in the Autonomous Island System of Ikaria , 2010, IEEE Transactions on Sustainable Energy.

[19]  Soodabeh Soleymani,et al.  A combination method for modeling wind power plants in power systems reliability evaluation , 2015, Comput. Electr. Eng..

[20]  Ahmad Ghasemi,et al.  Optimal energy management of a renewable-based isolated microgrid with pumped-storage unit and demand response , 2018, Renewable Energy.

[21]  S. A. Papathanassiou,et al.  Operating Policy and Optimal Sizing of a High Penetration RES-BESS System for Small Isolated Grids , 2011, IEEE Transactions on Energy Conversion.