Simultaneous scheduling and optimization of a copper plant
暂无分享,去创建一个
Abstract This work presents a novel batch scheduling solution that has been developed for a copper plant. The major characteristics of the copper production process with some specific interdependencies are briefly summarized, the main modeling challenges and some key elements of the resulting mixed-integer optimization problem are presented, followed by a concrete example problem highlighting the benefits of the solution.
[1] Ignacio E. Grossmann,et al. Assignment and sequencing models for thescheduling of process systems , 1998, Ann. Oper. Res..